Home additions & ADU
Kitchen remodeling
Bathroom remodeling
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
IKO Home Additions & ADU: The Dallas Owner’s Guide
If you’re building an addition or ADU in Dallas with IKO roofing components on the structure, we install all of it: IKO shingles, underlayment, and the flashing that ties the new roof into the existing one. A finished addition runs $45,000 – $130,000 in Dallas; a detached ADU runs $90,000 – $220,000. We size, order, and install the IKO system as part of that build, and we do it on a scheduled timeline, not overnight.

Owners usually discover an IKO problem mid-project, not at the start. It shows up after the first big Dallas rain when water stains the new ceiling below the addition. Or during the framing inspection, when someone spots exposed nail heads on the IKO shingles visible from the ground. Or months in, when granules fill the gutter and the shingle surface looks bare. Those are the signals that the IKO side of the build wasn’t done to spec, and they’re the reason we walk every roof system before we hand it over.
Which IKO Models This Applies To
IKO makes several residential shingle lines, and the one on your addition matters for matching. Cambridge, Dynasty, and Armourglass are the common architectural and three-tab products you’ll see on Dallas homes. Cambridge and Dynasty are laminated architectural shingles; Armourglass is the older three-tab style that shows up on a lot of pre-2000 roofs here.
To identify what’s on your structure, check three things. First, the bundle wrapper or a leftover at the ridge if the job left one. Second, the shingle itself: architectural lines have a laminated, textured surface, while three-tab sits flatter with a visible notch pattern. Third, measure a single tab width, since IKO standardizes exposure differently across lines. If you’re matching a new addition roof to an existing IKO roof, get the exact line. Mixing Cambridge and Dynasty on one continuous plane looks wrong from the street and can void the manufacturer’s wind warranty.
On the OEM-versus-aftermarket question: for shingles and underlayment, there’s no real aftermarket equivalent worth using. IKO’s own underlayment, ridge caps, and starter strip are engineered to work with IKO shingles. Substituting a generic felt or a different brand of starter strip is where leaks start. We order the IKO line specified in the plan and don’t swap it out mid-job. We’re an independent builder, not affiliated with IKO, so we’ll tell you straight when the correct part costs more and why it’s worth it.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your IKO Home Additions & ADU Is Failing
These are the symptoms Dallas homeowners report when the IKO roof side of an addition or ADU build went wrong:
- Granule loss in the gutters after a spring storm. Dallas hail and UV do a number on a shingle that was installed in the wrong season or with too few nails. Granules washing into a downspout mean the shingle surface is wearing faster than it should.
- Water staining on the new ceiling below the addition. This usually traces to a flashing failure where the new roof meets the existing house, not the shingle field. The tie-in is the hardest detail on any Dallas addition and the first place water finds a gap.
- Nail heads showing through the shingle surface. Overdriven fasteners from a nail gun set too high. The shingle seals over them at first, then the sealant fails and each nail becomes a leak point.
- Rippling or wavy shingle lines along the eave. Often a sign the decking underneath was skipped or not replaced before the IKO went down. Warm Dallas summers make a bad deck show through faster.
- Bare or faded patches facing west. West-facing planes take the hardest afternoon sun in North Texas. Fading that appears uneven across one plane points to mixing shingle lines or a bad batch.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included
The IKO roof system on a standard addition or ADU in Dallas usually runs $8,000 – $20,000 for a full roof replacement scope, while the addition itself sits in the $45,000 – $130,000 range and a detached ADU in the $90,000 – $220,000 range.
What drives the range on the roof side: square footage of the new plane, how complicated the tie-in to the existing house is, and whether decking needs replacing. On the addition itself: foundation type, square footage, and finish level. Every quote is line-item from us. Shingles, underlayment, flashing, decking, and labor are each priced out so you see where the money goes.
Every project carries the 730-Day Done Right Promise. If something isn’t right, we make it right. Pricing is upfront with no change-order games, and the number you see is the number you pay. That matters on a build this size.
DIY or Call Us?
There’s a real safety line on this one. Roof work on a two-story addition or ADU means height, and a fall off a North Texas roof can be fatal. If the failure is a flashing gap or a missing nail at the ridge, that’s not a homeowner fix, and we’ll say so plainly.
What you can safely do: get on the ground and look. Check your gutters after a storm, look at the shingle lines from the yard, and photograph any ceiling stain below the addition. Don’t climb a ladder onto the roof plane to poke at shingles.
Where DIY goes wrong: a homeowner re-nails a lifted shingle without fixing what caused the lift, or seals a flashing gap with caulk that fails by the next Dallas summer. Both fixes leave you two problems instead of one and cost more to undo. Call (844) 797-4808 and we’ll walk the roof with you and give you a straight answer.
FAQs
How long does an IKO roof on a Dallas addition last? A properly installed IKO architectural shingle should hold up 20 to 25 years in Dallas, and often closer to the low end on a west-facing plane because of the sun. Hail shortens it further. The install quality matters as much as the shingle line.
Can the failing section be repaired instead of replaced? Sometimes. A single flashing failure at the tie-in can often be fixed without touching the whole roof. Granule loss across a full plane usually means replacement. We’ll tell you which one you’re dealing with before quoting.
How long does the swap take? A repair on a flashing detail can be done in a day. A full roof replacement on an addition or ADU typically runs two to four days depending on square footage and weather. We schedule it and keep you posted on every step.
How do you source the IKO part? We order the exact IKO line specified for your build through authorized supply, including the matching underlayment and ridge caps. We also work with KraftMaid, Cambria, and Silestone on the interior finish side of additions. You’ll see the part number and source on your line-item quote. Call (844) 797-4808 for a free estimate.
Groundwork Construction Co. of Dallas builds additions and ADUs from foundation to finish line, with IKO roofing spec’d and installed correctly, backed by the 730-Day Done Right Promise. Our technicians have up to 12 years of experience, arrive background-checked and in uniform, and every call is answered by a live person 24/7. Prices are upfront with no surprises, and 0% financing for 18 months is available, plus $1,000 off projects over $10,000. Call (844) 797-4808 to schedule your free project estimate and design consult.
Written by the team at Groundwork Construction Co. of Dallas, serving Dallas and nearby areas.