A Groundwork company - serving Dallas, TX
Garage Conversion ADU in University Park, TX | Groundwork Construction Co. of Dallas

Garage Conversion ADU in University Park - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Kitchen remodelingKitchen remodeling
Bathroom remodelingBathroom remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Garage Conversion ADU in University Park, TX: Costs, Timeline, and the Storm-Ready Build

A garage conversion ADU in University Park, TX typically runs $45,000 – $130,000 and takes 3 – 5 months from permit to final inspection. You’re turning an existing attached or detached garage into a code-compliant second dwelling: new framing, insulation, HVAC, plumbing, electrical, and – in this part of North Texas – a door assembly and wall envelope that hold up to spring hail and 70+ mph wind gusts. Call (844) 797-4808 to schedule your free on-site estimate.

Key takeaways

  • Typical University Park garage conversion ADU budget: <strong>$45,000 – $130,000</strong>, driven mostly by slab condition, plumbing distance, and whether you want a full kitchen or kitchenette.
  • Realistic timeline: <strong>12 – 20 weeks</strong>, with the permit review in University Park often the longest single stretch.
  • Wind-rated, impact-rated door and window assemblies are not optional upgrades here. They’re the difference between a garage that survives a storm and one that floods.
  • Written line-item estimates, permits pulled, inspections passed, and every job covered by the <strong>730-Day Done Right Promise</strong>.

What does a Garage Conversion ADU actually involve in University Park?

The short version: we take the existing garage shell – whether attached, detached, or alley-facing – and rebuild it into a self-contained living unit. That means raising the floor if the slab won’t hold, framing interior walls, running a new electrical panel or subpanel, adding HVAC, plumbing for a bath and kitchenette, and finishing it out with real doors, real windows, and a real roof tie-in.

Call (844) 797-4808

But in University Park, the garage itself is rarely the hard part. The lot is. Nearly every block in this ZIP (75225) is built out. There’s no vacant land to work with, so staging happens in the alley, materials come in on a narrow side yard between mature live oaks, and the conversion has to pass through a permitting and HVAC-review process that treats rebuilds as routine. That reality shapes every schedule we quote here.

How we run a garage conversion ADU, stage by stage

Every conversion follows the same five-stage arc. Here’s what actually happens and what you’ll be deciding at each point.

Stage 1: Site and structural assessment (week 1). We open the garage, check the slab for cracks and settlement, look at the existing foundation type (pier-and-beam or early slab), and measure the door opening and roof tie-in. You decide at this stage: do you want an attached or detached layout, and does the alley access support a side-entry or rear-facing entry door.

Stage 2: Design, permitting, and HVAC review (weeks 2 – 6). This is the long pole in University Park. We prepare the plan set, submit for the city permit, and coordinate the HVAC review. You’ll decide the interior layout – bed/bath count, kitchen vs kitchenette, laundry placement – before we submit, because changes after submittal cost weeks. We pull the permits and handle inspection scheduling.

Stage 3: Demo and rough-in (weeks 6 – 10). Out comes the old garage door, the old slab finish, and any failing framing. In goes the new subfloor, the plumbing rough (we run supply and drain to the new bath and kitchen), the electrical rough with a subpanel, and the HVAC rough. Original cast-iron plumbing or knob-and-tube-era wiring in an older garage gets corrected here. You decide fixture placement and outlet locations before the walls close.

Stage 4: Insulation, drywall, doors, and windows (weeks 10 – 14). This is where the storm-readiness work lands: impact-rated entry doors, wind-rated window assemblies, and a properly reinforced wall envelope around the new construction. The old overhead door opening gets framed in and closed with a full-height wall assembly. You’ll pick door style, window type, and finish schedule at this stage.

Stage 5: Finishes, HVAC startup, and final inspections (weeks 14 – 20). Flooring, paint, trim, cabinets, countertops, plumbing fixture install, and system commissioning. We walk the final inspection with the city, close out permits, and hand you the keys. The 730-Day Done Right Promise covers every phase.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Options you’ll choose between (and what each one actually costs you)

The spec sheet for a University Park garage conversion ADU is where the budget lives or dies. Here’s the honest breakdown.

  • Impact-rated entry door vs standard door. Impact-rated runs $2,000 – $4,500 installed and is what we recommend in University Park, where hail and wind-driven rain are annual events. A standard door saves $1,200 – $2,000 but will need replacing within a decade and can compromise a wall’s wind rating.
  • Single-pane vs double-pane windows. Double-pane, low-E, wind-rated assemblies run $600 – $1,400 per opening; they cut summer cooling load noticeably in North Texas heat. Single-pane saves money up front and costs you every August.
  • Kitchenette vs full kitchen. A kitchenette (sink, 2-burner cooktop, undercounter fridge) runs $8,000 – $15,000 with fixtures like a Moen faucet and Blanco sink. A full kitchen with range, dishwasher, and full-height cabinetry runs $18,000 – $35,000, and often justifies pairing the work with Cabinets & Countertops in University Park.
  • Bathroom spec. A standard tub/shower combo with fixtures from Delta or American Standard runs $6,000 – $12,000; a walk-in tile shower runs $9,000 – $16,000.
  • Flooring. Luxury vinyl plank lays over a repaired slab and runs $3 – $6/sq ft; engineered hardwood runs $6 – $11/sq ft and looks warmer but doesn’t love garage-grade humidity swings.
  • HVAC. A ducted mini-split runs $6,000 – $11,000; a traditional split system runs $5,000 – $9,000 and needs more ceiling space.

If you’re updating the main house at the same time, homeowners often pair this with Backsplash, Tile & Flooring in University Park.

What Garage Conversion ADU costs in University Park, TX

The realistic all-in range for a garage conversion ADU in University Park is $45,000 – $130,000. Where your job lands in that range comes down to five variables:

| Line item | Typical range | | - | - | | Structural repair, slab, subfloor | $4,000 – $18,000 | | Framing, drywall, insulation | $8,000 – $20,000 | | Electrical + panel | $5,000 – $14,000 | | Plumbing (bath + kitchenette) | $5,000 – $15,000 | | HVAC | $5,000 – $11,000 | | Impact-rated doors & windows | $6,000 – $18,000 | | Finishes, cabinetry, fixtures | $12,000 – $34,000 | | Permits, plans, inspections | $2,500 – $6,000 |

What pushes a job to the high end: a failing slab that needs full pier repair, a detached garage that needs a new subpanel run from the house, plumbing that has to cross a concrete apron, or a walk-in shower with custom tile. What keeps it low: a clean existing slab, an attached garage with a short plumbing run, a kitchenette instead of a full kitchen, and minimal structural work.

What’s included in a written estimate: permits, plan prep, all labor, materials, inspections, and final walkthrough. What isn’t: landscape repair outside the work area, driveway resurfacing, or any scope we didn’t price. Upfront pricing means the number you see is the number you pay.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What University Park homes specifically do to this job

University Park is a landlocked, built-out enclave where virtually every project is a rebuild or a remodel of an existing lot. That shapes garage conversions in two ways. First, most garages here date to the 1920s – 1950s brick-and-frame era, and many still have pier-and-beam foundations, original cast-iron drains, and knob-and-tube-era wiring. We correct those during the rough-in, and that correction is why our “structural” line item is never zero. Second, the lot geometry matters. Fifty- to seventy-foot lots with mature oaks and narrow side yards mean we stage from the alley, protect trees during demo, and schedule exterior work tightly – summer heat compresses exterior schedules fast.

The North Texas black-clay soil is the other variable. It moves, and it takes slabs with it. Any garage we convert gets a slab assessment first; if the slab has heaved or cracked, we correct it before framing. And because this is a wind-and-hail climate, every conversion we touch gets impact-rated door and window assemblies and a properly reinforced wall opening where the old overhead door was. That’s the difference between a garage that survives the April storm season and one that doesn’t.

We serve the whole University Park area, including 75225.

Serving University Park, TX – Our Local Coverage Area

We serve University Park and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently asked about Garage Conversion ADU in University Park

Get a free on-site Garage Conversion ADU estimate

We’ll walk the garage, check the slab and the electrical, and put a written line-item number in front of you before you commit to anything. The consultation is free and there’s no pressure to sign. Whether the conversion is a standalone project or part of a full Home Additions & ADU in University Park, we’ll scope it honestly and tell you what the garage can and can’t do. Learn more about our Home Additions & ADU work, or call (844) 797-4808 – a live person answers 24/7.

Written by the team at Groundwork Construction Co.

Why University Park Chooses Groundwork Construction Co. of Dallas

We set the standard for garage conversion ADU in University Park.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in University Park

Getting your garage conversion ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your garage conversion ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local garage conversion ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What University Park Customers Say

Trusted by homeowners across University Park and surrounding areas.

★★★★★

"We lived in the house through the whole thing. He kept the dust wall up, cleaned every Friday, and made sure we always had a working bathroom."

Craig Whitaker
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett

Ready for Garage Conversion ADU in University Park?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in University Park.

(844) 797-4808

Request a Free Estimate in University Park

Tell us about your garage conversion ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Local Service Coverage
Call Now - 24/7 Dispatch