FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Carrollton’s older subdivisions were platted for parking, not for people. The 1970s brick ranches around 75006 and 75007 almost all have a two-car garage facing the street, and as lot values have climbed past what those houses cost to build, more owners are converting that garage into living space instead of rebuilding from scratch. A Garage Conversion ADU in Carrollton, TX typically runs $45,000 – $130,000 and takes 10 to 16 weeks from permit to final inspection. We build them to pass local inspections and clear architectural review committees, and we answer the phone live 24/7 at (844) 797-4808.
What a Garage Conversion ADU in Carrollton actually involves
A garage conversion ADU turns attached or detached garage space into a self-contained unit: sleeping area, bathroom, kitchenette, and its own entry. In Carrollton that usually means a slab that was poured for cars, walls that were never insulated, and a door opening that has to become a compliant egress path. Before bidding, we assess the slab, the existing electrical service, and the utility pathway.
Carrollton’s remodel market is driven by rebuild work, and that changes the compliance math. An owner replacing the garage door typically needs an association-approved door style, color, and panel profile, plus a window treatment that reads as glass from the street. We match existing panels and finishes so the conversion doesn’t create an architectural violation, and we submit the ARB package for you. That step alone trips up a lot of Carolina-area DIY conversions.
How we sequence the work
Every garage conversion we run follows the same five-stage path. The durations below assume a standard two-car garage of roughly 400 square feet; a larger or detached structure adds time.
Stage 1: Site assessment and ARB submission (1 – 2 weeks)
We measure the slab, document existing wiring and plumbing, and photograph the garage door and façade for the architectural review package. You decide the unit layout and confirm the door replacement plan with your association. We submit the ARB request, and no demolition begins until the package is approved.
Stage 2: Permits and demolition (1 – 2 weeks)
We pull the building, electrical, plumbing, and mechanical permits, then demo the garage door, rails, and opener, along with any drywall the conversion touches. All debris is hauled out. This is the stage where hidden conditions surface: aluminum branch wiring, a cracked slab, or a floor drain that has to be filled and capped. Each one becomes a written change order before we proceed.
Stage 3: Framing and rough-in (2 – 3 weeks)
New partition walls, a bathroom wet wall, and the new entry framing go up first. Then the trades rough in: dedicated circuits and a sub-panel if the service allows, water and drain lines for the bathroom, and supply and return ducts or a mini-split. You decide at this point whether to run a full kitchenette or a simple sink-and-counter setup.
Stage 4: Insulation, drywall, and finishes (3 – 5 weeks)
Spray foam or batt insulation goes in, then drywall, taping, and texture. This is the longest stage and the one where finish choices lock in. Flooring, tile, cabinetry, and paint all happen here. We keep the schedule realistic; most jobs sit in this stage for a month, and cheap bids that promise faster usually mean less trade coverage.
Stage 5: Trim, punch list, and final inspection (1 – 2 weeks)
Trim, fixtures, final paint, and the new entry all come together. We walk the unit with you, build a punch list, and correct every item before we close out the final inspection. The 730-Day Done Right Promise covers workmanship on everything we install.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The options you’ll choose between
The decisions that matter most for a garage conversion ADU are the ones that affect code, weather performance, and how the unit holds up. These are the tradeoffs we go through with every Carrollton owner:
- Framed-in wall vs. door replacement: building a compliant wall with a window is the cleanest path and lets you match the main house siding; replacing the garage door with an approved panel-and-glass unit is faster but costs more and requires ARB sign-off on the profile.
- Slab-on-grade vs. raised subfloor: the original slab is cheaper to use, but older Carrollton slabs can be cracked or out of level; a sleeper subfloor levels the room and insulates it, at roughly $2,000 – $5,000 more.
- Mini-split vs. extended ductwork: a ductless mini-split is the simplest way to heat and cool a converted garage without touching the main system; tying into the house HVAC costs more if the existing equipment is undersized.
- Kitchenette scope: a sink, counter, and small fridge costs a fraction of a full kitchen with a range and vent. Most single-unit ADUs go with the simple version.
- Bathroom wet-wall placement: the cheapest bathroom shares a wall with the main house plumbing; a bathroom on the far side of the garage means pumping drain lines, which adds cost.
- Flooring underlay: LVP over a moisture barrier handles a garage slab well; tile is better in the bathroom. We use Oldcastle and Quikrete products for the slab-leveling and repair steps.
What a Garage Conversion ADU costs in Carrollton, TX
A Garage Conversion ADU in Carrollton runs $45,000 – $130,000, with a typical two-car conversion landing in the $60,000 – $90,000 range once a bathroom, kitchenette, and new entry are included. A detached-garage conversion or a unit with a full kitchen and separate laundry pushes toward the top of the range.
Five things move the number:
- Utilities re-routed or upgraded: if the garage shares a wall with the main service panel, hookup is straightforward; if the panel is on the far side of the house or needs a service upgrade, expect $3,000 – $9,000 more.
- Plumbing distance: a bathroom near existing drains is cheap; one that drags a sewer line across the slab adds several thousand.
- Structural changes: removing a load-bearing wall between the garage and the house, or correcting a failing slab, is the biggest swing.
- Door treatment: matching an approved garage door panel and finish costs more than a simple framed-in entry.
- Permit scope and ARB revisions: a project that has to resubmit architectural drawings adds time and a design fee.
A written estimate from us is line-item and upfront. The number you see is the number you pay, with no change orders after the fact. The permits we pull and the inspection sign-off are included; the ARB resubmission fee, if your HOA charges one, and any optional upgrades beyond the base plan are not.
See the difference
Before
After
Before
After
Before
AfterWhat Carrollton homes do to this job
The most common surprise in a Carrollton garage conversion is what’s behind the drywall. In the 1970s and 80s ranches around Josey Lane and Belt Line Road, we routinely find original aluminum branch wiring and polybutylene supply lines. Both have to be fully replaced before the job can pass inspection. Polybutylene is the bigger issue because it fails under pressure; this is a genuinely dangerous item, and we do not recommend any homeowner handle the replacement themselves. A licensed tradesperson should do the work.
Carrollton’s expansive clay soils also matter. The same foundation movement that cracks interior walls often shows up in a garage slab as a step or a seam. If the slab is failing, the conversion becomes a level-then-build job, and we handle the repair before finishes go down. That’s why a Garage Conversion ADU in Carrollton has to start with a slab assessment, not a design.
Serving Carrollton, TX – Our Local Coverage Area
We serve Carrollton and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked – Garage Conversion ADU in Carrollton
Typically 10 to 16 weeks from permit to final inspection. The longest stages are rough-in and finishes; the ARB approval and foundation assessment are the parts most likely to add a week or two. Call (844) 797-4808 for a free on-site estimate and a real timeline for your garage.
Yes. A conversion that adds a bathroom, kitchenette, or separate entry requires building, electrical, plumbing, and mechanical permits, and inspections at each stage. We pull the permits and handle the inspections; the work isn’t legal or insurable without them.
Sometimes. If the new bathroom can sit against the main house plumbing wall and no load-bearing wall needs to come out, the conversion stays in the $60,000 – $75,000 range. Moving a wet wall or removing structure is what pushes it higher. We’ll tell you on the first visit which scenario you’re in.
The range is $45,000 – $130,000, with most two-car conversions landing between $60,000 and $90,000. Call (844) 797-4808 for an exact quote; estimates are free.
No, unless a hidden condition surfaces during demolition, such as aluminum wiring or a cracked slab. We document it, get your approval in writing, and add nothing silently. The 730-Day Done Right Promise covers the workmanship we install.
Schedule your free Garage Conversion ADU estimate
Carrollton homeowners get an on-site visit, a slab and utility assessment, and a written line-item estimate before anything begins. If the project expands into a full remodel, it becomes part of a larger scope, which you can read about here: Home Additions & ADU in Carrollton. We also handle the interior build-out trades; our Home Additions & ADU service covers the wider project, and owners often pair this with our Cabinets & Countertops in Carrollton and Backsplash, Tile & Flooring in Carrollton work.
We’re set up to serve the whole Carrollton area, including Addison, Farmers Branch, Coppell, and Irving. Call (844) 797-4808. Financing at 0% for 18 months and the $1,000 off projects over $10,000 are available.