Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
New Detached ADU in Carrollton: What It Takes and What It Costs
A new detached ADU in Carrollton usually runs $45,000 to $130,000 depending on size, finish level, and how much site work your lot needs. Plan on 4 to 7 months from permit submission to final inspection. That range covers a fully permitted, separately metered backyard dwelling; a larger unit with premium finishes pushes toward the top. Call (844) 797-4808 to schedule a free on-site estimate.
How We Build a Detached ADU, Stage by Stage
Every backyard unit follows the same arc. Here’s what actually happens, and where your decisions land.
Stage 1: Site visit and feasibility (week 1)
We walk the lot, measure setbacks, and check where utilities enter the main house. You’ll get a straight answer on whether your yard fits a detached unit and which footprint works. This is also when we flag easements, tree roots, or a slab that’s already moving.
Stage 2: Design and permit submission (weeks 2 – 8)
The design package goes to the City of Carrollton for plan review. You’ll make your big calls here: square footage, one or two bedrooms, roof pitch, and exterior cladding that matches the main house. Carrollton’s review timeline drives this stage more than anything we do.
Stage 3: Site prep and foundation (weeks 9 – 12)
Demo of old patios or sheds, grading, and utility trenching come first. Then the slab or pier-and-beam foundation. North Texas clay means we plan foundation detail carefully before we pour. You’ll sign off on utility routes before trenches close.
Stage 4: Framing, rough-in, and inspections (weeks 13 – 22)
Framing, roof, windows, then electrical, plumbing, and HVAC rough-in. Each gets its own inspection. This is where hanging out with your submittal and confirming fixture locations pays off, because changes after rough-in cost real money.
Stage 5: Finishes and final walkthrough (weeks 23 – 30)
Insulation, drywall, cabinets, flooring, fixtures, paint, and landscaping repair. We do a full walkthrough with you, then close out the final inspection. Our 730-Day Done Right Promise covers workmanship after you move in, if anything isn’t right, we make it right.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Actually Make
- Foundation type: Post-tension slab is fastest and most common here. Pier-and-beam costs more but handles soil movement better. Given the clay in this area, we talk through this one carefully.
- Exterior cladding: Brick veneer to match the main house, fiber-cement siding (James Hardie is a solid choice), or stucco. Brick carries the highest cost but matches the 1970s – 80s stock and clears most HOA reviews without a fight.
- Utilities: Separate meter makes the unit easier to rent legitimately. Tied to the main meter costs less upfront but limits how you use it.
- Layout: Studio or one-bedroom keeps you in the low range. Two bedrooms with a full kitchen pushes toward $130,000.
- Kitchen and bath finishes: Builder-grade cabinets and stock fixtures versus semi-custom (KraftMaid is a name we work with often). A small kitchenette is fine for a guest suite; a full kitchen suits long-term rental.
- Roof: Architectural shingles (GAF and CertainTeed are our go-tos) fit most Carrollton neighborhoods. Metal lasts longer and runs higher.
What a New Detached ADU Costs in Carrollton, TX
Expect $45,000 to $130,000 for a detached ADU in Carrollton. That’s the working range. Here’s what moves a job from the bottom to the top:
- Size: A 400-square-foot studio sits near $45,000. A 900-square-foot two-bedroom runs $110,000 to $130,000.
- Site conditions: Flat, clear yards are cheap. Sloped lots, tree removal, or old concrete to haul off add thousands.
- Utility distance: The farther the unit sits from the main house, the more trenching and pipe you pay for.
- Finish level: Stock cabinets and laminate at the low end; semi-custom cabinetry and stone counters add 15 – 25%.
- Permit scope: A unit with a full kitchen and separate meter carries more review and inspection than a simple guest suite.
Your written estimate lists every line: site work, foundation, framing, trades, finishes, and permits. It excludes landscaping beyond basic repair and any foundation repair on the main house. Need work inside the main house too? That’s part of a full Home Additions & ADU in Carrollton plan, and we’ll scope both together so nothing gets bid twice.
See the difference
Before
After
Before
After
Before
AfterWhat Carrollton Homes Specifically Do to This Job
Carrollton’s older subdivisions, particularly around 75006 and 75007, are full of 1970s – 80s brick ranch homes on lots that are now worth more than the houses sitting on them. That changes ADU work. We spend more time on permitting-driven site work and matching new construction to mature HOA deed restrictions than on new-build lots. Off Josey Lane and Belt Line Road, we routinely open a wall and find original aluminum branch wiring or polybutylene supply lines that have to be replaced before anything passes inspection. Expansive clay soil means a cracked slab on the main house often turns a straightforward ADU into foundation-repair-first work. And if your neighborhood has an HOA, the backyard unit still has to clear the architectural review committee, so we build cladding and roof choices to match.
We cover the whole city, so whether you’re in 75007 or 75010, we know the drill. You can see all the communities on our Carrollton page.
Serving Carrollton, TX – Our Local Coverage Area
We serve Carrollton and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – New Detached ADU in Carrollton
Most detached ADUs run 4 to 7 months from permit submission to final inspection. The permit review and the weather both push that window around. Call (844) 797-4808 for a timeline based on your specific lot.
Yes, a detached dwelling requires a building permit and plan review from the City of Carrollton. We handle the submittal and pull the permits for you. Call us to talk through what the review process looks like for your address.
Usually yes, a detached unit has its own supply and drain lines, so the main house’s plumbing stays untouched. The only tie-in is where it connects at the main. We map the route during the site visit.
Expect $45,000 to $130,000 depending on size and finish. A studio lands near the bottom; a two-bedroom with a full kitchen sits at the top. Call (844) 797-4808 for an exact quote after a walkthrough, the estimate is free.
Every ADU we build is covered by our 730-Day Done Right Promise, one of the longest workmanship guarantees in the residential construction space. If something isn’t right, we make it right. Call us to go over the details.
Homeowners sometimes finish a backyard unit with matching outdoor paving or refresh a kitchen nearby, which is why many pair this with Backsplash, Tile & Flooring in Carrollton or Kitchen Design & Layout in Carrollton. Our Home Additions & ADU service handles the full scope.
Get Your Free Detached ADU Estimate in Carrollton
We’ll come out, walk your lot, and tell you what a new detached ADU would cost at your address. No charge, no pressure, and a written line-item quote you can hold us to. Call (844) 797-4808 and you’ll get a live person, day or night, not a voicemail. Estimates are free.
Written by the team at Groundwork Construction Co. of Dallas.