Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
After# What It Costs to Hire a General Contractor in Dallas, TX
Hiring a general contractor in Dallas usually runs 10-20% of your total project cost, and most homeowners hear that number and stop asking questions. That’s a mistake on Blackland clay. The fee you’re quoted often leaves out the $800-$2,500 engineer’s letter the City of Dallas requires before it will issue a foundation-related permit, and that line item surfaces after you’ve already signed. We’re Groundwork Construction Co. of Dallas, and we put every one of those costs in a single written quote before work starts. Call (844) 797-4808 for a free estimate and design consult.
Here’s the short version of what Dallas homeowners actually pay us for GC services:
| Project Type | Typical Total Project Cost |
| - | - |
| Kitchen remodel | $14,000-$45,000 |
| Bathroom remodel | $9,000-$28,000 |
| Roof replacement | $8,000-$20,000 |
| Window replacement | $4,500-$15,000 |
| Home addition | $45,000-$130,000 |
| ADU construction | $90,000-$220,000 |
The general contractor’s cut is built into those figures. We itemize it so you can see what your money is buying.
## Why Dallas GC Quotes Look Different From the National Calculators
Those online cost calculators were built for a generic American house on generic soil. Dallas doesn’t sit on generic soil.
The city lies in the middle of the Blackland Prairie, where expansive vertisols swell in wet years and shrink hard in dry ones. A slab poured without proper drilled-pier depth on that clay will show stair-step cracks in the brick and doors that stick within a few dry summers. Local crews see it constantly. That’s why foundation work, root barriers, and post-tension slab design are folded into nearly every construction project here in a way they simply aren’t in the limestone country to the south or the sandy Piney Woods to the east.
Then there’s the code. DFW runs on a no-freeze-depth, high-wind-zone reality, so builders here design for soil movement and wind uplift before they think about frost. Spring hail and straight-line windstorms push material choices toward hail-rated roofing and high wind-uplift fastening. Hot, humid summers push toward serious attic ventilation.
Each of those realities carries a cost. And each one lands in a different line of your bid.
## The Engineer’s Letter Nobody Warns You About
This is where the conversation usually goes sideways.
When does Dallas require an engineer’s letter? Any time a permit touches the foundation, a licensed structural engineer has to sign off on the plan, and that letter typically runs $800-$2,500 on its own. It’s not a city fee and it’s not optional. It’s a professional document you’re paying for before the permit window even opens.
Here’s how that cost behaves in practice. A kitchen remodel where we’re not touching the slab may not trigger it. An addition, an ADU, a garage conversion, or anything that adds load to the foundation almost always does. Homeowners planning an addition in the $45,000-$130,000 range often budget carefully for framing and finishes and then get surprised by the engineer’s letter as a separate check.
On a national cost calculator, that $800-$2,500 is invisible. On a Dallas bid, it’s real money and it belongs in writing from day one.
Take a look at our [home additions and ADU work](/) if your project sits in that range; it’s the category where this cost hits hardest and where we walk through it line by line.
## What Upfront Pricing Actually Means in a Dallas Bid
We put the whole picture in one document. That includes:
– The engineer’s letter, quoted at its actual dollar amount
– City of Dallas permit and inspection fees
– Material costs, itemized by trade
– The GC markup, shown as a percentage of the work it covers
– Labor from background-checked, uniformed crews
The number you see is the number you pay. No Monday-morning addendum after you’ve already cleared out the kitchen.
Our technicians bring up to 12 years of experience to the job, and we work with brand partners you’ll recognize: Kohler and Moen fixtures in bathrooms, Blanco sinks and Delta faucets in kitchens, GAF and Owens Corning shingles overhead. Material quality and honest pricing aren’t separate conversations. They’re the same conversation, and a bid that hides cost usually hides material substitutions too.
## How Much Does a No-Warranty Contractor Really Cost?
Cheaper, until it isn’t.
A bid that comes in $6,000 under everyone else usually means one of two things: materials cut somewhere you won’t notice for two years, or no workmanship warranty behind the job. On a slab that moves seasonally, that second one is a bet against Dallas clay. You’ll find out how the bet landed right around the second dry summer.
Run the math. The 730-Day Done Right Promise covers workmanship for two full years. If it’s not done right, we make it right. A warranty-less contractor leaves you holding the bill for whatever fails, and foundation-adjacent failures on a moving slab are never small.
That’s the case for treating GC markup as insurance rather than overhead. You’re not just paying for coordination. You’re paying for someone who’s on the hook when the work doesn’t hold.
## Making the Full Scope Affordable Instead of Cutting Corners
When a budget gets tight mid-project, the temptation is to skip the engineer’s letter, downgrade the shingle rating, or trim the fastening spec. Every one of those shortcuts gets paid back later with interest.
We’d rather fix the cash-flow problem than shave the scope. Two standing offers help:
– 0% financing for 18 months on qualifying projects
– $1,000 off projects over $10,000
Between them, most homeowners find the room to build the job correctly the first time. Our [kitchen remodeling guide](/) walks through what a properly scoped kitchen actually includes, and where we won’t let a budget cut land.
## The Hidden Liability Cost of Unverified Crews
There’s a cost in your bid that never appears as a line item: liability.
When you hire a GC who subs work out to whoever’s available, you’re carrying exposure you didn’t sign up for. Uninsured subs on your property, unvetted hands in your home, no paperwork trail if something goes wrong. Background-checked, uniformed technicians on every job close that gap. It’s a cost the contractor absorbs so you don’t.
Calls get answered by a live person, 24 hours a day, seven days a week. No voicemail, no waiting until Monday. When something on a job needs a decision, you reach someone who can make it.
## FAQs
### How much does it cost to hire a general contractor in Dallas?
General contractor fees in Dallas typically run 10-20% of total project cost, so a $30,000 bathroom remodel carries roughly $3,000-$6,000 in GC fees on top of materials and labor. On projects that touch the foundation, add the $800-$2,500 engineer’s letter. Call (844) 797-4808 for an exact quote with every line itemized, free.
### Do I need an engineer’s letter for a remodel in Dallas?
You need a licensed structural engineer’s letter whenever your permit involves foundation work, and that covers most additions, ADUs, garage conversions, and slab-touching remodels. A cosmetic kitchen or bathroom refresh usually doesn’t trigger it. When it does, we quote the cost upfront at $800-$2,500 rather than surprising you mid-permit.
### Is it cheaper to repair or replace my roof in Dallas?
Repair is cheaper short-term at $400-$1,800 versus $8,000-$20,000 for a full replacement, but hail damage in DFW changes the calculus. Once you’re patching the same slope twice in three years, replacement wins. Call (844) 797-4808 and we’ll give you a straight answer on which side of that line your roof sits.
### How much does a home addition cost in Dallas?
A home addition in Dallas typically runs $45,000-$130,000, and the engineer’s letter and foundation work are baked into that range from the start. ADUs run higher at $90,000-$220,000 because they carry their own utility runs and separate code path. Call for a free design consult and a written quote covering every line.
## Get a Written Number, Not a Range
If you’ve been quoted a GC fee and you’re not sure what’s hiding behind it, we’ll put the full scope in writing: engineer’s letter, permits, materials, labor, markup. No surprises after the crew shows up.
Call Groundwork Construction Co. of Dallas at (844) 797-4808 for a free project estimate and design consult. Live person, 24/7. Ask about the 0% financing for 18 months and the $1,000 off projects over $10,000 while you’re on the phone.
Written by the team at Groundwork Construction Co. of Dallas, serving Dallas, TX.
What Our Customers Say
"We lived in the house through the whole thing. He kept the dust wall up, cleaned every Friday, and made sure we always had a working bathroom."
- Craig Whitaker"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."
- Angela Wong"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."
- Laura Bennett