A Groundwork company - serving Dallas, TX
ADU Site Prep & Utilities in Carrollton, TX | Groundwork Construction Co. of Dallas

ADU Site Prep & Utilities in Carrollton - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Kitchen remodelingKitchen remodeling
Bathroom remodelingBathroom remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

ADU Site Prep & Utilities in Carrollton: What the Job Actually Involves

ADU site prep and utilities in Carrollton runs $45,000 – $130,000 and takes 6 – 14 weeks from first excavation to final inspection, depending on how much of the existing service equipment has to be replaced to carry a second dwelling. The work covers the parts nobody photographs: grading and drainage, the slab or pier foundation, trenching for water, sewer, gas and electric, the panel and meter setup, and the inspections that sign off on each one. Call (844) 797-4808 to schedule a free on-site estimate.

Call (844) 797-4808

Stage by stage: how site prep and utility work actually runs

Here is the sequence we work through on a Carrollton ADU, with the decisions that land on you at each point.

  • Stage 1 – Site survey and utility locate (days 1 – 3). We mark the build footprint, call in the locates for existing water, sewer and gas lines, and pull the plat to confirm setbacks and easements. You decide the final ADU placement here, because where the structure sits determines how far every trench has to run.
  • Stage 2 – Demolition and grading (days 3 – 8). Any old slab, shed, driveway section or overgrown root zone inside the footprint comes out. We cut and fill to the engineered grade, then compact in lifts. North Texas clay moves, so the subgrade has to be right before anything goes on top of it. You approve the drainage plan (swales, French drains, or surface flow) at this stage.
  • Stage 3 – Foundation and slab (days 8 – 20). Depending on the design, that’s either a post-tension slab or a pier-and-beam setup. Plumbing rough-in goes in before the pour. Inspections happen on the forms and the under-slab plumbing before concrete arrives, and nothing gets poured until both pass.
  • Stage 4 – Utility trenching and connection (days 14 – 40, overlapping the build). We trench water, sewer, gas and electrical from the mains or the house to the ADU, set the meter and disconnect, and run conduit. If the existing panel can’t carry the added load, an electrical service upgrade happens here. This is the stage where older Carrollton lots most often surprise people.
  • Stage 5 – Final utility tie-ins and inspections (final 5 – 10 days). Water and gas pressure tests, sewer line camera verification, electrical sign-off, and the final building inspection. You get copies of every inspection card and the as-built utility drawing.
Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The choices you’ll be making, and what each one costs you

Site prep and utilities is a decision-heavy phase. These are the real forks in the road:

  • Slab vs. pier-and-beam foundation. A post-tension slab is the cheaper, faster route and suits flat lots. Pier-and-beam handles grade changes better and keeps plumbing accessible, but adds cost and time. On a lot with active clay movement, piers are worth the money.
  • Electrical service: keep or upgrade. If the existing panel has room for the added load, you save real money. If it’s an older 100-amp panel, an upgrade to 200 amp is usually required, and that’s a line item of its own.
  • Utility trench route. Running lines along the shortest path saves excavation, but sometimes a longer run avoids cutting a mature tree’s root zone or crossing a driveway. You choose between cost and disruption.
  • Drainage system. Surface grading alone is cheapest. French drains and a dry well cost more but handle the heavy spring rain we get here. On low lots, skipping drainage is a shortcut you’ll pay for later.
  • Fixture and finish brands. Moen and Delta fixtures are reliable, well-supported mid-range choices for an ADU kitchenette and bath; American Standard covers the basics affordably. You pick this later, but the plumbing rough-in has to anticipate the layout.

What ADU Site Prep & Utilities costs in Carrollton, TX

Plan for $45,000 – $130,000 for the site prep and utility package on a Carrollton ADU. The low end fits a flat lot, a short utility run, and a service panel that already has capacity. The high end fits active soil movement, a long trench route, a full electrical upgrade, and drainage work.

  • Lot condition: a flat, cleared lot is cheaper than one needing demo, fill, or retaining.
  • Distance to utilities: every extra foot of trench is labor, pipe and inspection.
  • Service upgrades: a panel and meter upgrade adds a distinct line item.
  • Soil and foundation type: expansive clay and pier systems push the number up.
  • Permit scope: the more separate inspections, the more scheduling and fees.

A written estimate from us breaks out excavation, foundation, each utility trade, permits and inspections line by line, with upfront pricing so the number you see is the number you pay. It typically excludes landscaping restoration after trenching and any interior ADU build-out, which is quoted separately. Call (844) 797-4808 for an exact quote.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Why Carrollton lots make this job different

Most of the ADU work we do in Carrollton sits on 1970s and 1980s lots, especially around the 75006 and 75007 ZIP codes, where tear-down-and-rebuild has replaced new construction. That build era matters here. Pulling trench near Josey Lane or Belt Line Road, we regularly uncover original cast-iron sewer laterals and old aluminum branch wiring that have to be replaced before any new service can tie in cleanly. The expansive clay under these lots moves with our wet-dry cycles, so foundation and drainage decisions carry more weight than they would on stable ground. And the planned-unit developments scattered through Carrollton often come with deed restrictions and HOA architectural review, so the utility route and equipment placement have to clear review before we dig.

Serving Carrollton, TX – Our Local Coverage Area

We serve Carrollton and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently asked: ADU Site Prep & Utilities in Carrollton

Schedule your Carrollton site prep estimate

If you’re planning an ADU in Carrollton, the site prep and utility work is where the project either runs smooth or runs into expensive surprises. A free on-site estimate tells you exactly what your lot needs and what it will cost, in writing, before a shovel touches the ground. Call (844) 797-4808 and a live person will set up a time to walk your lot. We cover Carrollton and the surrounding area, and this work is often part of a full Home Additions & ADU in Carrollton project. Homeowners sometimes pair it with our Small & Partial Kitchen Remodels in Carrollton or Full Bathroom Remodeling in Carrollton, and you can see our broader Home Additions & ADU work for the full scope.

Written by the team at Groundwork Construction Co.

Why Carrollton Chooses Groundwork Construction Co. of Dallas

We set the standard for ADU site prep & utilities in Carrollton.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Carrollton

Getting your ADU site prep & utilities project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU site prep & utilities project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU site prep & utilities pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Carrollton Customers Say

Trusted by homeowners across Carrollton and surrounding areas.

★★★★★

"We lived in the house through the whole thing. He kept the dust wall up, cleaned every Friday, and made sure we always had a working bathroom."

Craig Whitaker
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett

Ready for ADU Site Prep & Utilities in Carrollton?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Carrollton.

(844) 797-4808

Request a Free Estimate in Carrollton

Tell us about your ADU site prep & utilities needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Local Service Coverage
Call Now - 24/7 Dispatch