Bathroom remodeling
Kitchen remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
CGI Bathroom Remodeling: The Dallas Owner’s Guide
Bathroom remodeling components carrying the CGI name install in Dallas typically at $9,000 to $28,000 for a full remodel, with shower, tub, and vanity work available as standalone projects inside that range. Small bathroom remodels run $5,000 to $12,000. We schedule work on a planned basis rather than same-day; a bathroom belongs out of service for days, not hours, and that’s the honest timeline. Groundwork Construction Co. of Dallas is an independent service provider and is not affiliated with CGI. Most owners start investigating after a shower door that won’t seal tight, a valve that drips behind the wall, or a finish that has chalked and dulled within a few Fort Worth-area summers of install.

Which CGI Models This Applies To
CGI shows up across Dallas bathrooms as shower enclosures, frameless and semi-frameless glass, sliding and pivot door hardware, valve cartridges, tub fillers, and vanity fixture sets. Model numbers live in a few predictable spots: a stamped plate on the shower door hinge plate or top rail, a sticker inside the valve trim escutcheon once you pull the handle, and the underside of a vanity countertop near the backsplash. Before calling anyone, shoot one clear photo of that label plus a tape-measure reading of the door opening or valve body. It saves a return trip and gets you a real number faster.
The compatibility gotcha with CGI glass hardware is that hinge spacing changed between their older and newer frame styles. A replacement hinge built for the prior series will bolt to your door and then bind, because the pivot offset is a few millimeters off. That’s a spec range, not a guess. On the OEM vs. aftermarket question: OEM cartridges and hinge sets fit without modification and hold the original finish warranty; a quality aftermarket equivalent costs 30 to 50 percent less and works fine when the spec sheet matches exactly. If the spec doesn’t match, walk away.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your CGI Bathroom Remodeling Is Failing
- Dripping or hard-to-turn valve: the cartridge seals have worn. Most common after six to eight years of Dallas hard water, which leaves mineral scale that grinds the seal faces.
- Shower door dragging or swinging on its own: hinge pivot wear or a loosened top rail. Left alone, the glass carries unbalanced load and eventually chips at the hinge cutout.
- Water pooling outside the shower door sweep: a worn sweep or seal at the door bottom. Cheap part, but if ignored it wicks into the curb and grout line behind the tile.
- Caulk or silicone pulling away at the pan or floor joint: differential movement between the pan and tile under Texas slab expansion and contraction. The joint needs proper backing and a flexible sealant, not a fresh bead over old material.
- Dull or chalky finish on trim and hardware: hard water etching and cleaning-agent wear on the plated finish. Cosmetic until the plating starts flaking and cuts hands on a handle.
Replacement Cost & What’s Included
Here’s what Dallas owners actually pay, parts and labor together, for the work most common on a CGI fixture replacement:
| Scope | Installed Range |
|---|---|
| Full bathroom remodel | $9,000 – $28,000 |
| Small bathroom remodel | $5,000 – $12,000 |
| Walk-in shower installation | $4,500 – $12,000 |
| Tub-to-shower conversion | $3,500 – $10,000 |
| Shower replacement | $3,000 – $8,500 |
| Bathroom vanity installation | $800 – $3,000 |
The range moves with tile selection, whether a valve body is behind the wall (requiring access), and glass style. What sets the number: a straight cartridge swap can land near the bottom; a shower rebuild where the pan is re-sloped and waterproofed lands near the top. Our quotes are line-item and upfront, the number you see is the number you pay, and all work is backed by the 730-Day Done Right Promise. We also stock KraftMaid, Cambria, and Silestone in other trades, but never parts on a truck.
See the difference
Before
After
Before
After
Before
AfterDIY or Call Us?
Safe for you to check: the model label, the door opening measurement, whether the valve trim unscrews easily on its own, and what the caulk line looks like at the pan. Screenshots and photos help us price accurately.
Where DIY goes wrong is behind the wall. Opening a valve body means shutting off the supply and dealing with water you can’t see until it’s soaked the drywall. Swapping a shower door’s hinge glass carries real risk too. A frameless CGI door panel can weigh 80 to 100 pounds, and a dropped panel cuts through a foot or a tile floor without warning. There’s no gentle way to say it: let a trained person handle the glass and the valve. That’s not scare tactics; it’s the math. If a part is failing, call us at (844) 797-4808 to schedule your free estimate.
FAQs
Valve cartridges typically last six to eight years here; glass hinge sets ten to fifteen years. Dallas water is harder than most markets, and the mineral content in North Texas supply speeds seal wear and etches plated finishes. Climate matters too. Indoor humidity swings with our summer cooling demand, which works the caulk and silicone joints harder than you’d see in a drier climate.
Often yes, for a valve cartridge or a door sweep; those are repair parts. A glass door with a chipped hinge cutout is a replacement, no repair option, because the safety glass loses its structural margin. We’ll tell you honestly which side of the line your part is on when we look at it. Call (844) 797-4808 for an exact quote, and estimates are free.
A cartridge or hardware swap runs two to four hours. A shower or vanity replacement is a planned one to three day job depending on tile and waterproofing. We don’t promise same-day; we promise a scheduled date and the same crew showing up on it. Most jobs are completed cleanly within the window we quote.
We identify the exact series from your label and door measurement, then pull the OEM part or a spec-matched aftermarket equivalent from our supplier network. Since we’re an independent provider and not affiliated with CGI, you get a straight recommendation, not a brand push. We confirm the spec sheet number by number before ordering, so what shows up fits. Call (844) 797-4808 to start your free estimate.
Ready to Price Your Dallas Bathroom Project?
You’ve got the model number, a rough idea of the symptom, and now a real cost range. The next step is a written line-item quote backed by the 730-Day Done Right Promise. Calls are answered by a live person, 24/7, and every technician on your job is background-checked and arrives in uniform. Take advantage of $1,000 off projects over $10,000 and 0% financing for 18 months. Call Groundwork Construction Co. of Dallas at (844) 797-4808 to schedule your free estimate.
Written by the team at Groundwork Construction Co. of Dallas, serving Dallas and nearby areas.