Bathroom remodeling
Kitchen remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
What Full Bathroom Remodeling in Farmers Branch, TX Actually Involves (and What It Costs)
Full Bathroom Remodeling in Farmers Branch, TX runs $9,000 – $28,000 for a whole-room gut-and-rebuild, and most homes here finish in 4 to 7 weeks once permits are in hand. That number covers demo, new tile, a new vanity and fixtures, lighting, and paint on a typical mid-century ranch bath; the spread between the low and high end comes almost entirely from whether we move plumbing and walls. Call (844) 797-4808 and we’ll walk your bathroom with you, price it line by line, and put it in writing.
The Order We Do It In, and What You Decide at Each Step
A full bath is a sequence, not a single task. The order matters because each stage depends on the one before it, and a shortcut on day two shows up in year three. Here’s how the work runs, and where your decisions land.
Stage 1: Demolition and discovery (1 – 2 days)
We protect the floors and hall, pull the old tub, tile, vanity, and toilet, and open the walls where we plan to move anything. This is where we find what the drawings can’t show: past water damage around the valve, a floor joist someone notched years ago, or old galvanized supply lines. You don’t decide anything today, but if we find a surprise, you get a call before we spend a dollar on it, not a change order at the end.
Stage 2: Rough-in and inspection (3 – 5 days)
If you’re relocating the shower, toilet, or sink, the plumber and electrician run new lines and set the valve body, then the rough framing for a niche or a half-wall goes in. The Farmers Branch inspection happens now, before anything gets closed up. This is the week a project either stays on schedule or doesn’t, so we don’t book it tight.
Stage 3: Waterproofing and substrate (2 – 3 days)
We hang cement board, tape and coat the seams, and roll a bonded waterproofing membrane across the shower walls and pan before a single tile goes up. No tile touches drywall in a shower we build. This is the stage homeowners never see and later wish they’d asked about, so we photograph it and send you the pictures.
Stage 4: Tile, floor, and fixture set (7 – 12 days)
Tiling is the long pole. A simple 12×24 field tile on a flat wall sets faster than a mosaic shower floor with a linear drain, and a herringbone pattern with three different finishes can eat four extra days of labor. Vanity, toilet, and trim go in after the grout cures.
Stage 5: Finishing, punch list, and final inspection (3 – 5 days)
Glass, mirrors, lighting, paint, and caulk close out the room. Then we walk it with you, you get a written punch list, and we don’t call the job done until it’s empty. Every project is covered by our 730-Day Done Right Promise, so if something fails after the walkthrough, we come back. That’s the part of the sequence a lot of contractors skip.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Actually Make (and What Each One Costs You Later)
A full remodel is really a stack of smaller decisions. Here’s what we walk through with you, with the honest trade-off in each.
- Tile material: Porcelain is the workhorse. It’s dense, resists moisture, and holds up to North Texas humidity swings without much fuss. Natural stone (marble, travertine) gives you a softer look but wants sealing every year or two and stains more easily. The cost difference is mostly labor, not the tile.
- Shower configuration: Keeping the existing footprint saves money. Adding a niche, a bench, or a linear drain means water gets managed differently and that means more substrate and waterproofing work. We build it right or we don’t build it.
- Vanity grade: A stock cabinet with a prefab top is the cheapest path and looks fine if the door style matches the room. A semi-custom vanity with a stone top gives you real storage and a finished edge, and it’s the upgrade most homeowners notice daily.
- Fixtures and trim: Kohler and Moen cover the practical end at a range of price points. Brushed nickel and matte black are the two finishes we install most; polished chrome shows water spots faster in a hard-water house.
- Ventilation: A bath fan rated for the room’s square footage is not optional in Texas. It’s what keeps the paint and the drywall from mildewing. We size it right and vent it outside, not into the attic.
- Windows: If your bathroom window is original to a 1960s ranch, an ES Windows or CGI unit is a natural fit and a smart pairing with the moisture-resistant trim you’re already installing.
What Full Bathroom Remodeling Costs in Farmers Branch, TX
Plan on $9,000 to $28,000 for the full job, with most Farmers Branch bathrooms landing between $14,000 and $20,000. What moves you up or down:
- Size: A hall bath under 50 square feet runs lower; a primary bath over 100 square feet with a double vanity pushes toward the high end.
- Existing condition: A floor with a soft spot or a wall behind the shower that’s been damp for years adds repair time before finish work starts.
- Moving plumbing, electrical, or structure: Keep the drain and supply locations where they are and you save real money. Relocate the toilet or move a wall and that’s new rough-in, new inspection, and more labor.
- Material grade: Porcelain and prefab tops vs. natural stone and semi-custom cabinetry is roughly the difference between a $12,000 bath and a $24,000 one.
- Permit scope: A cosmetic refresh may not require a plumbing permit; a reconfiguration does. We pull what the city requires and factor it into the written quote so there’s no surprise line item later.
Your written estimate includes demo, disposal, rough and finish work, materials we supply, and the inspection. It does not typically include structural repair found behind a wall or appliances you add beyond the scope. We tell you that up front. We also offer 0% financing for 18 months and $1,000 off projects over $10,000. Upfront pricing, no surprises.
See the difference
Before
After
Before
After
Before
AfterWhat Farmers Branch Homes Do to This Job
Most of the bathrooms we remodel in Farmers Branch sit inside mid-century ranch homes and smaller post-war cottages built somewhere between the 1950s and 1970s, especially the blocks that blend into the Brook Hollow and Marsh Lane side of town near the Dallas line. That build era means we regularly open a wall and find the original cast-iron drain, old galvanized supply lines, or a floor that’s settled unevenly into the Blackland Prairie clay that swells and shrinks hard between our dry summers and wet springs. A full bath on a slab that’s moved needs a level-check before tile goes down, or you get cracked grout within a year. Because Farmers Branch is largely built out with almost no new residential land, this work is almost all renovation of the existing stock rather than new construction, and the city enforces its code and permitting on these older properties. We pull permits and pass the inspections, and a full bath is often the first room in a wider whole-house update, so it’s a natural time to look at Roof Repair in Farmers Branch or a Roof Replacement & Installation in Farmers Branch if the last hail season left its mark.
When a full bath is part of a larger scope, whether you’re reworking the whole house or adding on, see our broader Bathroom Remodeling in Farmers Branch page for the rest of the picture, and if you’d like to know how we cover the rest of the area, start with Farmers Branch. For the full range of what our Bathroom Remodeling service can do, that hub has the detail.
Serving Farmers Branch, TX – Our Local Coverage Area
We serve Farmers Branch and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: Full Bathroom Remodeling in Farmers Branch
A full bathroom remodel takes 4 to 7 weeks from demo to final inspection, with the permit turnaround on top of that. Tile work and the rough-in inspection are the two biggest time eaters. Call (844) 797-4808 for a schedule built around your specific bathroom.
Yes, a full remodel that moves plumbing, electrical, or structure requires permits and inspections in Farmers Branch. We pull them and schedule the inspections; you don’t have to chase the city. Cosmetic-only work may not need a permit, and we’ll tell you which applies before we start.
Yes, and it’s the most common way we keep a full bath inside the lower end of the range. Keeping the toilet, shower, and sink where they are means no new rough-in and no reconfiguration. If you want a different layout, we’ll price both options side by side so you can see the real cost of moving things.
Expect $9,000 to $28,000, with most Farmers Branch jobs in the $14,000 – $20,000 band. Size, existing condition, plumbing relocation, and material grade are what move the number. Call (844) 797-4808 for a free line-item estimate.
Every full bathroom remodel is backed by our 730-Day Done Right Promise. If anything we built fails within that window, we come back and make it right. There’s no fine print ladder to climb.
Ready to Price Your Bathroom?
Call (844) 797-4808 to book a free on-site estimate for Full Bathroom Remodeling in Farmers Branch. We’ll look at the room with you, tell you what the existing condition actually allows, and leave you with a written line-item quote and a realistic schedule. A real person answers the phone, 24/7. No voicemail, no waiting until Monday. Estimates are free and so is the design consult.
Written by the team at Groundwork Construction Co.