A Groundwork company - serving Dallas, TX
Full Bathroom Remodeling in Grand Prairie, TX | Groundwork Construction Co. of Dallas

Full Bathroom Remodeling in Grand Prairie - Fixed Price, One Bathroom at a Time

Free in-home consult and a written, line-item quote before demo starts. We work one bathroom at a time so your house stays livable, and the signed price is the final price. Licensed, insured, permits handled.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Bathroom remodelingBathroom remodeling
Kitchen remodelingKitchen remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Full Bathroom Remodeling in Grand Prairie, TX: What It Costs and How Long It Takes

A full bathroom remodeling in Grand Prairie typically runs $9,000 to $28,000 when the layout stays put, the fixtures are mid-grade, and the room is a standard 5×8 to 8×10 hall or primary bath. Bringing the room down to the studs, replacing the tub or shower, re-tiling the floor and walls, setting a new vanity, and correcting whatever the demo uncovers takes about three to five weeks for most homes we work on here. If you’re relocating plumbing or knocking out a wall, add a week or two. Call (844) 797-4808 and we’ll talk through which of those ranges fits your room before anyone picks up a hammer.

Call (844) 797-4808

The Sequence We Actually Follow on a Gut Bath

Full bathroom remodeling goes sideways when the steps get reshuffled. Here’s the order that keeps the job on schedule and the final inspection clean.

1. Demolition and rough inspection (days 1 – 2)

We protect the hallway, pull the fixtures, and strip the room to studs and joists. Everything comes out: old tile, drywall, the tub or shower pan, the vanity, and any subfloor that’s soft, delaminated, or shows water staining around the toilet flange. You’ll see the room open up and we’ll walk it with you – that’s when we confirm whether the framing behind the wall is sound or whether a rotted plate or subfloor panel needs replacing. This is also where you approve any change order before we move on, so the number you agreed to stays the number.

2. Rough plumbing and electrical (days 2 – 4)

If the layout is staying, this is quick: new shutoffs, a fresh P-trap, GFCI protection, an exhaust fan rated for the room’s cubic footage, and any dedicated circuit the new fixtures need. If you’re moving the toilet or converting to a walk-in shower, this stage runs two or three days longer and the drain rough gets pressure-tested. You decide now whether the shower valve stays on the same wall or shifts, because once the tile goes up, that decision is locked in.

3. Inspection and insulation (day 5ish)

Rough plumbing and electrical get inspected before anything closes up. We schedule it, we’re there for it, and we don’t cover a wall until it passes. This is the step that separates a permitted job from a “we’ll handle it later” job, and it’s why a Grand Prairie bathroom with paperwork behind it holds its value better at resale.

4. Board, waterproofing, and tile (days 6 – 12)

Cement board goes up on the wet walls, a bonded waterproofing membrane goes on the shower pan and walls, and the pan gets a flood test before a single tile is set. Floor tile, wall tile, and any niche or bench framing happen in this window. You’ve made your tile and grout decisions by now (usually weeks earlier, so the material is on site and the schedule doesn’t stall waiting on a backorder).

5. Trim-out and final walkthrough (days 13 – 20+)

Vanity and top set, toilet reset, shower glass or curtain rod in, fixtures and accessories mounted, caulk and paint touched up, final electrical and plumbing inspection signed off. We walk the room with you, run every fixture, check every drain for flow, and hand over the paperwork. Then the 730-Day Done Right Promise kicks in – if something we installed isn’t right, we make it right, well past the point most contractors have gone quiet.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices That Shape the Room (and Your Budget)

Almost every dollar swing in a full bathroom remodeling comes down to five decisions. Here’s what actually matters, with the honest trade-off on each.

  • Tile material and size. Porcelain is the workhorse: $3 – $12 per square foot installed, holds up to daily moisture, easy to clean. Large-format 12×24 or 24×48 tile means fewer grout lines to scrub but demands a flatter substrate, so leveling labor climbs if your floor has a dip over an old joist. Natural stone looks great and costs more; it also needs sealing and shows every etch mark from a dropped bottle. Choose stone if you love it enough to reseal it annually.
  • Shower configuration. A tub-shower combo is the budget end. A walk-in shower with a linear drain and a frameless panel sits at the high end and needs the drain relocation and waterproofing labor that goes with it. The trade-off is real: walk-in showers are easier to live with but you lose the tub, and a home with kids or a future resale buyer may want one back.
  • Vanity and top. A stock 48-inch vanity with a porcelain top is a few hundred dollars. A custom-height vanity with a quartz top and double undermount sinks lands several times that. The comfort-height (36-inch) cabinet is money well spent – it’s easier on your back and reads as an upgrade at resale.
  • Fixtures and finish grade. Big-box brands and Kohler or Delta’s premium lines all work; the difference shows up in the finish warranty and how the valve cartridge holds up over ten years. Spend on the valve and the exhaust fan. Save on the towel bars.
  • Ventilation and moisture control. A properly sized exhaust fan vented to the exterior (not into the attic) is not optional in North Texas humidity. An undersized fan breeds mold behind the paint and rots the framing faster than any other decision on this list.

What Full Bathroom Remodeling Costs in Grand Prairie, TX

The full bathroom remodeling range in Grand Prairie is $9,000 to $28,000 for most rooms. Here’s roughly how the money breaks down:

Scope Typical range
Keep-the-layout refresh (tile, fixtures, vanity, paint) $9,000 – $14,000
Gut remodel, standard 5×8 to 8×10 bath, mid-grade finishes $14,000 – $20,000
Primary bath with layout change or walk-in shower conversion $20,000 – $28,000
High-end: stone, custom vanity, glass enclosure, premium plumbing Above $28,000

What pushes a job toward the top of that range: relocating the drain or supply lines (adds $1,500 – $4,000 in rough plumbing and patching), moving the toilet (similar cost, plus permit scope), discovering rot in the subfloor or a rotted sill plate once the demo is open, going from a tub to a curbless walk-in shower, and upgrading from porcelain to natural stone. What keeps it at the bottom: keeping the plumbing where it sits, choosing stock cabinetry, keeping the existing tub if it’s in solid shape, and staying with porcelain tile.

A written line-item estimate covers demo, disposal, framing repairs, rough plumbing and electrical, waterproofing, tile labor and material, fixtures, vanity and top, paint, and inspections. It doesn’t cover structural repair if a joist is compromised, mold remediation if we find active growth behind the tile, or moving a load-bearing wall – those get a separate written quote so the original number doesn’t quietly creep. As part of a larger overhaul, this work pairs with our Bathroom Remodeling service and sits comfortably inside a house-wide scope.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Grand Prairie Homes Specifically Do to This Job

Grand Prairie sits on the Blackland Prairie’s expansive clay, which means the ground under your house swells and shrinks with the weather. Inside a bathroom, that shows up as tile cracks that follow a straight line across the floor, doors that drag a little more each season, and toilets that rock because the flange has shifted. Before we hang a single piece of cement board, we check the floor for deflection and the toilet flange for movement. On the older 75050 and 75051 blocks near the old downtown core, the mid-century ranches and small post-war homes often have slab-on-grade foundations that have already been leveled once, and the plumbing is the original cast iron or galvanized. That changes the scope: we’re often replacing a section of drain line while the floor is open, which is a $1,200 – $3,000 add that a newer subdivision in 75052 usually doesn’t need.

Being a two-county city adds a wrinkle most of our neighboring suburbs don’t have. Portions of Grand Prairie fall under Dallas County permitting and portions under Tarrant County, so who inspects your bathroom rough and final depends on where the house sits. We confirm the jurisdiction before we pull permits, and we schedule the inspection so it happens on time rather than stalling the tile schedule. On 1990s-and-newer tract homes in 75052, the layout is typically tighter and the plumbing runs are shorter, so a gut remodel moves faster; the trade-off is less room to reconfigure without cutting into a closet or hallway. Pair this kind of work with Roof Repair in Grand Prairie when the vent stack flashing is leaking, or a full Roof Replacement & Installation in Grand Prairie if the storm damage is broader. We cover all of Grand Prairie and the surrounding neighborhoods.

Serving Grand Prairie, TX – Our Local Coverage Area

We serve Grand Prairie and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – Full Bathroom Remodeling in Grand Prairie

Schedule Your Free Full Bathroom Remodeling Estimate

We start with a free on-site estimate: we measure the room, check the subfloor and plumbing, confirm your permit jurisdiction, and hand you a written line-item quote with the numbers laid out. Financing is available at 0% for 18 months, and projects over $10,000 get $1,000 off. No pressure, no vague “it depends” – just the math for your room. Call (844) 797-4808 to set it up, and a live person picks up around the clock.

Written by the team at Groundwork Construction Co.

Why Grand Prairie Chooses Groundwork Construction Co. of Dallas

We set the standard for full bathroom remodeling in Grand Prairie.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Grand Prairie

Getting your full bathroom remodeling project started is simple.

1

Call or Request a Free Estimate

Tell us about your full bathroom remodeling project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local full bathroom remodeling pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Grand Prairie Customers Say

Trusted by homeowners across Grand Prairie and surrounding areas.

★★★★★

"We lived in the house through the whole thing. He kept the dust wall up, cleaned every Friday, and made sure we always had a working bathroom."

Craig Whitaker
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett

Ready for Full Bathroom Remodeling in Grand Prairie?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Grand Prairie.

(844) 797-4808

Request a Free Estimate in Grand Prairie

Tell us about your full bathroom remodeling needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Local Service Coverage
Call Now - 24/7 Dispatch