Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterFull Kitchen Remodeling in Dallas, TX
A full kitchen remodeling in Dallas means stripping a kitchen back to its studs and rebuilding every system inside it – plumbing, electrical, cabinetry, counters, flooring, lighting and ventilation – as one coordinated project. Homeowners choose a full remodel, rather than a cosmetic refresh, when the layout no longer fits how they cook and live, or when the wiring and plumbing behind the walls have reached the end of their useful life. Groundwork Construction Co. of Dallas handles that entire rebuild from foundation to finish line, with upfront pricing, background-checked and uniformed technicians, and the 730-Day Done Right Promise backing every trade we touch. Call (844) 797-4808 and a live person answers, day or night, to set up your free estimate and design consult.
This page covers the full-scope version of our Kitchen Remodeling work. If you’re weighing a partial update instead, start with our Kitchen Remodeling in Dallas overview first, then come back here for the gut-and-rebuild details.
Dallas kitchens present a particular set of challenges that national remodeling sites ignore. Our clay soils expand and contract with the seasons, which is why we check subfloor flatness and cabinet anchoring on nearly every full remodel here, not just the ones with visible settling. The brutal summer heat pushes HVAC and ventilation loads hard, so range hood sizing and make-up air get real attention from us. And in older neighborhoods like Lakewood, Winnetka Heights and Munger Place, we regularly find galvanized supply lines, two-wire circuits with no ground, and original cast-iron drains hiding behind drywall that looked fine from the outside. A full remodel is the right call when what’s behind the wall matters as much as what’s in front of it.
When You Need Full Kitchen Remodeling
Full kitchen remodeling makes sense in a few recognizable situations. If you see yourself in more than one of these, a gut-and-rebuild almost always costs less over time than patching problems one at a time:
- The layout fights you every day. The refrigerator door blocks the prep zone, the dishwasher opens into a walkway, or two people can’t work in the kitchen without bumping elbows. Moving walls, plumbing and outlets is the only real fix, and that’s a full remodel.
- Your kitchen dates to before you were born. In Dallas homes built in the 1950s through the 1970s, we often find 20-amp circuits serving appliances that now need dedicated lines, plus undersized sinks and hoods. Code has moved on, and a surface update won’t bring the systems up to date.
- You keep finding water where water shouldn’t be. A soft spot near the sink, a cabinet base that crumbles when you lean on it, or recurring moisture under the dishwasher all point to slow leaks behind the wall. In Dallas, the combination of heat and plumbing age makes these common; a full remodel lets us open the wall and address the cause.
- You’re planning to stay for years. If this is your long-term home, the finishes and systems you choose should hold up for 15-plus years of real cooking. A full remodel lets you specify cabinet lines and appliances meant to last, not just to look good on a listing.
- You’re remodeling before a sale or after a purchase. Buyers in the Dallas market inspect kitchens closely. A kitchen with a renovated layout and modern systems reads very differently from a dated one, and a full remodel is often the difference between a quick sale and a long listing.
- Your insurance or repair history has piled up. Repeat repair bills are a signal. When you’ve paid for the same appliance, the same leak, or the same electrical fix more than once, a full kitchen remodeling project usually pays for itself in avoided future repairs.
If you’re not sure which side of that line you’re on, call us at (844) 797-4808. We’ll tell you honestly whether a full remodel is warranted or whether a more targeted job makes better financial sense.
Our Full Kitchen Remodeling Process
We’ve run enough full kitchen remodels in Dallas to know where projects go sideways, and our process is built to catch those problems before they cost you money. Here’s how the work unfolds.
- Free estimate and design consult. We walk the kitchen with you, measure everything, and talk through what’s working and what isn’t. You get upfront pricing with no surprises, and the number you see is the number you pay. Bring pictures, favorite materials, and questions. This is where we set the scope and the budget together.
- Detailed scope and material selections. We put the plan in writing, trade by trade. You choose cabinets and countertops from our curated brand partners, along with lighting, hardware and flooring. We help you weigh cost against durability for a Dallas kitchen that takes real use, and we flag anything in the existing space that might need adjustment once walls open.
- Demo and structural work. We protect the routes in and out of your home before the first swing of the hammer, then bring the kitchen down to studs. If the plan calls for moving a wall or relocating a sink, the rough framing and structural work happens here. We haul away old cabinets, appliances and flooring as we go.
- Rough-in and inspections. Licensed trades run new plumbing, electrical and ventilation, with dedicated circuits for the appliances you’ve chosen. We coordinate inspection timing so nothing sits idle waiting on a signature. This is the phase where a full kitchen remodeling project earns its keep: the hidden systems get built right.
- Finish installation. Cabinets, counters, backsplash, flooring, lighting, appliances and trim all go in on a schedule set from the start. We stick to the plan, keep you briefed on progress, and hold the crew accountable to the material spec you approved.
- Final walkthrough and handoff. We walk the finished kitchen with you, check every door, drawer, outlet and seal, and make sure you know how everything works. The 730-Day Done Right Promise starts here: if it’s not done right, we make it right, and we stand behind the workmanship for the long haul.
Throughout the project, calls are answered by a live person, 24/7. No voicemail black holes, no waiting until Monday morning when something needs attention.
Full Kitchen Remodeling Pricing in Dallas
Full kitchen remodeling in Dallas typically runs from roughly $35,000 to $110,000+, with most gut-and-rebuild projects landing between $55,000 and $85,000. A basic full remodel with standard materials starts around $35,000. Mid-range projects with quality cabinets, stone counters and upgraded appliances sit in the $55,000 – $85,000 range. High-end full remodels with custom cabinetry, high-end appliances and significant layout changes go over $100,000. Your actual number depends on the square footage, how many systems move, and the finishes you select.
Here’s a typical line-item breakdown so you can see where the money goes:
| Line item | Typical Dallas range |
|---|---|
| Design and planning | $1,500 – $5,000 |
| Demolition and haul-away | $2,000 – $5,000 |
| Plumbing rough-in and relocation | $3,000 – $8,000 |
| Electrical rough-in and dedicated circuits | $2,500 – $6,500 |
| Cabinetry and installation | $8,000 – $25,000 |
| Countertops and backsplash | $4,000 – $12,000 |
| Flooring | $2,500 – $8,000 |
| Appliances | $3,000 – $15,000 |
| Lighting, ventilation and trim | $1,500 – $5,000 |
| Painting and finishing | $1,500 – $4,000 |
What drives the range up or down? Layout changes are the biggest factor: moving a sink or range across the room adds substantial plumbing and electrical cost, while a same-footprint rebuild stays leaner. Material choices matter just as much. Standard cabinet lines land far below custom, and engineered stone counters cost less than natural stone. Dallas-specific factors play a role too: older homes in neighborhoods like Lakewood or Winnetka Heights often need full electrical panel work and drain replacement once walls open, and those costs appear in the quote before the project starts, not after. We tell you what we expect to find and what the contingency is, so the total is a number you can plan around.
Two ways to make the total easier to manage: the standing projects offer of $1,000 off projects over $10,000, and 0% financing for 18 months. Upfront pricing pairs with those, so you know the full number before work begins. The estimate and design consult are free, so call (844) 797-4808 with questions or to schedule.
How Long Does a Full Kitchen Remodel Take in Dallas?
Most full kitchen remodels in Dallas take 8 to 12 weeks from demo to final walkthrough. A same-footprint remodel with standard materials can finish toward the low end; projects with structural changes, custom cabinetry and added plumbing usually stretch toward 12 weeks or slightly beyond. The timeline depends on permitting, material lead times on cabinets and appliances, and inspection scheduling, and we build those into the plan before we start so you’re not surprised by the calendar. If a full kitchen remodeling project is in your plans for this year, call (844) 797-4808 and we’ll give you a realistic completion window based on the scope we talk through.
What Should You Expect During a Full Kitchen Remodel?
Expect to lose your kitchen for the duration of the project, so plan meals and a temporary prep space accordingly. Demo and rough-in are the loudest, dustiest phases; finish installation is quieter but fills the room. We seal and protect the work area, keep daily cleanup on schedule, and provide a live contact who answers when you call. You’ll have a written scope and a material spec you approved, and any changes get priced in writing before work proceeds, so the final number matches the agreements along the way. Our technicians have up to 12 years of experience and arrive in uniform, background-checked, on every project.
How Do You Get Started With Full Kitchen Remodeling in Dallas?
Start by calling (844) 797-4808 to set up the free estimate and design consult. From there, we walk the kitchen with you, measure everything, and put the scope and upfront pricing in writing. You’ll select materials, we’ll schedule the trades, and we’ll keep in touch until the final walkthrough. The design consult and estimate cost nothing, and the 0% financing for 18 months and $1,000 off projects over $10,000 are available to make the budget work. One team, one contract, from structure and systems through cabinets, counters and finishing, with the 730-Day Done Right Promise standing behind all of it.
FAQs – Full Kitchen Remodeling
Is it cheaper to repair or replace a kitchen in Dallas?
In most cases, a full kitchen remodel costs less over a realistic 10 – 15 year window than repeated repairs on aged plumbing, wiring and appliances. A repair fixes one problem; a full remodel addresses the systems and finishes together, and in Dallas homes built before 1980 we usually find enough deferred issues that piecemeal repairs add up fast. For a specific comparison, call (844) 797-4808 – estimates are free and we’ll tell you straight which path makes sense.
How much does a full kitchen remodel cost in Dallas?
Most full kitchen remodels in Dallas run $55,000 – $85,000, with a full range from about $35,000 for a basic same-footprint rebuild to $110,000+ for high-end custom work. Layout changes, cabinet and counter choices, and the condition of the existing plumbing and wiring move the number up or down. Call (844) 797-4808 for an exact quote with no-hassle upfront pricing.
Can you do a full kitchen remodel in Dallas in phases?
Yes, and phasing is sometimes smart for budget or scheduling reasons, but it usually costs more overall and takes longer because trades revisit the space twice. For many homes a full remodel done in one pass is cleaner and less expensive once you account for repeat mobilization and temporary kitchens. We’ll walk through both options on the estimate call at (844) 797-4808.
What brands do you use for full kitchen remodels?
We select cabinets, countertops, appliances and fixtures from a curated set of verified brand partners across every trade, so you’re choosing quality, not just whatever is available. Your selections get spec’d in writing during the planning phase, and the finish installation crew holds to that spec. Call (844) 797-4808 to talk materials and options with the team.
Do you offer financing and discounts on full kitchen remodels?
Yes. Groundwork Construction Co. of Dallas offers 0% financing for 18 months and $1,000 off projects over $10,000, alongside a free project estimate and design consult. Those standing offers apply without fine print or hidden conditions, and the upfront pricing is the number you see. Call (844) 797-4808 to confirm eligibility for your project.
Ready to plan a full kitchen remodel in Dallas? Call (844) 797-4808 for a free estimate and design consult. A live person answers 24/7, and our background-checked, uniformed technicians bring up to 12 years of experience to every project. Upfront pricing, 0% financing for 18 months, $1,000 off projects over $10,000, and the 730-Day Done Right Promise back every job from foundation to finish line. Built to last, backed in writing.
Written by the team at Groundwork Construction Co. of Dallas, serving Dallas.