A Groundwork company - serving Dallas, TX
New Detached ADU in Carrollton, TX | Groundwork Construction Co. of Dallas

New Detached ADU in Carrollton - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Kitchen remodelingKitchen remodeling
Bathroom remodelingBathroom remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

New Detached ADU in Carrollton: What It Takes and What It Costs

A new detached ADU in Carrollton usually runs $45,000 to $130,000 depending on size, finish level, and how much site work your lot needs. Plan on 4 to 7 months from permit submission to final inspection. That range covers a fully permitted, separately metered backyard dwelling; a larger unit with premium finishes pushes toward the top. Call (844) 797-4808 to schedule a free on-site estimate.

Call (844) 797-4808

How We Build a Detached ADU, Stage by Stage

Every backyard unit follows the same arc. Here’s what actually happens, and where your decisions land.

Stage 1: Site visit and feasibility (week 1)

We walk the lot, measure setbacks, and check where utilities enter the main house. You’ll get a straight answer on whether your yard fits a detached unit and which footprint works. This is also when we flag easements, tree roots, or a slab that’s already moving.

Stage 2: Design and permit submission (weeks 2 – 8)

The design package goes to the City of Carrollton for plan review. You’ll make your big calls here: square footage, one or two bedrooms, roof pitch, and exterior cladding that matches the main house. Carrollton’s review timeline drives this stage more than anything we do.

Stage 3: Site prep and foundation (weeks 9 – 12)

Demo of old patios or sheds, grading, and utility trenching come first. Then the slab or pier-and-beam foundation. North Texas clay means we plan foundation detail carefully before we pour. You’ll sign off on utility routes before trenches close.

Stage 4: Framing, rough-in, and inspections (weeks 13 – 22)

Framing, roof, windows, then electrical, plumbing, and HVAC rough-in. Each gets its own inspection. This is where hanging out with your submittal and confirming fixture locations pays off, because changes after rough-in cost real money.

Stage 5: Finishes and final walkthrough (weeks 23 – 30)

Insulation, drywall, cabinets, flooring, fixtures, paint, and landscaping repair. We do a full walkthrough with you, then close out the final inspection. Our 730-Day Done Right Promise covers workmanship after you move in, if anything isn’t right, we make it right.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices You’ll Actually Make

  • Foundation type: Post-tension slab is fastest and most common here. Pier-and-beam costs more but handles soil movement better. Given the clay in this area, we talk through this one carefully.
  • Exterior cladding: Brick veneer to match the main house, fiber-cement siding (James Hardie is a solid choice), or stucco. Brick carries the highest cost but matches the 1970s – 80s stock and clears most HOA reviews without a fight.
  • Utilities: Separate meter makes the unit easier to rent legitimately. Tied to the main meter costs less upfront but limits how you use it.
  • Layout: Studio or one-bedroom keeps you in the low range. Two bedrooms with a full kitchen pushes toward $130,000.
  • Kitchen and bath finishes: Builder-grade cabinets and stock fixtures versus semi-custom (KraftMaid is a name we work with often). A small kitchenette is fine for a guest suite; a full kitchen suits long-term rental.
  • Roof: Architectural shingles (GAF and CertainTeed are our go-tos) fit most Carrollton neighborhoods. Metal lasts longer and runs higher.

What a New Detached ADU Costs in Carrollton, TX

Expect $45,000 to $130,000 for a detached ADU in Carrollton. That’s the working range. Here’s what moves a job from the bottom to the top:

  • Size: A 400-square-foot studio sits near $45,000. A 900-square-foot two-bedroom runs $110,000 to $130,000.
  • Site conditions: Flat, clear yards are cheap. Sloped lots, tree removal, or old concrete to haul off add thousands.
  • Utility distance: The farther the unit sits from the main house, the more trenching and pipe you pay for.
  • Finish level: Stock cabinets and laminate at the low end; semi-custom cabinetry and stone counters add 15 – 25%.
  • Permit scope: A unit with a full kitchen and separate meter carries more review and inspection than a simple guest suite.

Your written estimate lists every line: site work, foundation, framing, trades, finishes, and permits. It excludes landscaping beyond basic repair and any foundation repair on the main house. Need work inside the main house too? That’s part of a full Home Additions & ADU in Carrollton plan, and we’ll scope both together so nothing gets bid twice.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Carrollton Homes Specifically Do to This Job

Carrollton’s older subdivisions, particularly around 75006 and 75007, are full of 1970s – 80s brick ranch homes on lots that are now worth more than the houses sitting on them. That changes ADU work. We spend more time on permitting-driven site work and matching new construction to mature HOA deed restrictions than on new-build lots. Off Josey Lane and Belt Line Road, we routinely open a wall and find original aluminum branch wiring or polybutylene supply lines that have to be replaced before anything passes inspection. Expansive clay soil means a cracked slab on the main house often turns a straightforward ADU into foundation-repair-first work. And if your neighborhood has an HOA, the backyard unit still has to clear the architectural review committee, so we build cladding and roof choices to match.

We cover the whole city, so whether you’re in 75007 or 75010, we know the drill. You can see all the communities on our Carrollton page.

Serving Carrollton, TX – Our Local Coverage Area

We serve Carrollton and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – New Detached ADU in Carrollton

Get Your Free Detached ADU Estimate in Carrollton

We’ll come out, walk your lot, and tell you what a new detached ADU would cost at your address. No charge, no pressure, and a written line-item quote you can hold us to. Call (844) 797-4808 and you’ll get a live person, day or night, not a voicemail. Estimates are free.

Written by the team at Groundwork Construction Co. of Dallas.

Why Carrollton Chooses Groundwork Construction Co. of Dallas

We set the standard for new detached ADU in Carrollton.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Carrollton

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Carrollton Customers Say

Trusted by homeowners across Carrollton and surrounding areas.

★★★★★

"We lived in the house through the whole thing. He kept the dust wall up, cleaned every Friday, and made sure we always had a working bathroom."

Craig Whitaker
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett

Ready for New Detached ADU in Carrollton?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Carrollton.

(844) 797-4808

Request a Free Estimate in Carrollton

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Local Service Coverage
Call Now - 24/7 Dispatch