Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterTub-to-Shower Conversion in Dallas, TX
A tub-to-shower conversion in Dallas typically costs $3,800 to $9,500 and takes three to seven working days, depending on tile, pan type, and whether plumbing has to move. It means pulling out the tub and building a walk-in shower in the same footprint or an expanded one: new shower pan, new waterproofing, new tile, new glass, new valve and trim. Homeowners call us about it most often when a parent can no longer step over a tub wall, when the tub is a 1970s original that’s stained past cleaning, or when they simply want back the square footage a tub steals from a small Dallas bathroom.
Groundwork Construction Co. of Dallas handles tub-to-shower conversions as a scheduled, permitted, written-scope project, not a weekend swap. We build it under our 730-Day Done Right Promise, with background-checked, uniformed technicians and upfront pricing where the number you see is the number you pay. Calls are answered by a live person 24 hours a day, seven days a week, so you’re not leaving a voicemail at 9 p.m. wondering if anyone’s coming.
If the shower is part of a larger renovation, start with our Bathroom Remodeling page and we’ll scope it together. If it’s a straight conversion, keep reading – this page is written for exactly that project. Call (844) 797-4808 for a free estimate and design consult.
Key Takeaways
- Most Dallas tub-to-shower conversions run $3,800 to $9,500, with three to seven days of on-site work.
- The 730-Day Done Right Promise covers workmanship for two full years – if it’s not done right, we make it right.
- Every conversion includes proper waterproofing and a code-compliant drain and pan; that’s the part you can’t see and the part that matters most.
- Upfront pricing, 0% financing for 18 months, and $1,000 off projects over $10,000 help make the project workable.
When You Need Tub-to-Shower Conversion
We get called for conversions across Dallas, and the reasons tend to cluster. Here’s what actually prompts the phone call, from our side of the clipboard:
- Access and safety in the house. A parent or grandparent is stepping over a 15-inch tub wall every morning, and the family wants a curbless or low-threshold shower before something happens. In East Dallas and Lakewood, where a lot of 1950s and 1960s ranch homes still have a single bathroom with an original tub, this is the number one reason we’re called.
- A tub nobody uses in a bathroom everybody shares. In a two-bath house in Plano or Richardson, the hall bath tub might be used twice a year. Replacing it with a walk-in shower gains daily usable space, and it’s the change most likely to actually improve the morning routine.
- The tub is past saving. Dallas water runs hard – the city’s water is high in calcium and dissolved minerals – and original surfaces pit, etch and stain. A tub that’s been refinished twice and still looks tired is a candidate for full replacement, not another coat.
- Water damage from an old surround. Danbury-style cast iron and steel tubs sit against tile that’s often 40+ years old. When we open the wall, we regularly find soft backer board, mold behind the surround, and a leaking valve from a decades-old compression fitting. A conversion is the right moment to fix all of it in one scope.
- Resale positioning. Buyers in the Dallas market increasingly expect a walk-in shower in the primary or main hall bath. A modern, tiled shower with good glass reads as a newer bathroom even when the rest of the room is untouched.
- Space in a small footprint. A standard 60-inch tub alcove becomes a 60-inch walk-in shower with a bench if you want one. In Dallas homes with 5×8 bathrooms – very common in Midway Hollow, Preston Hollow and older parts of Oak Cliff – that’s the single biggest functional upgrade available without moving walls.
Our Tub-to-Shower Conversion Process
Here’s the sequence we run, and why each step exists. It’s the same process on a 1955 ranch in Casa Linda and a 2010s build in Uptown.
- Free estimate and design consult. We measure the alcove, look at the drain location and valve wall, check for any sign of prior water intrusion, and talk through tile, pan type (curbless, low curb, or standard), glass configuration and fixtures. You leave that visit with an upfront price and a written scope, not a ballpark scribbled on a napkin.
- Permits and scheduling. Most tub-to-shower conversions in Dallas require a plumbing permit because the drain and valve assembly change. We pull it, schedule the inspection, and lock in your dates before we start. The work order is written down, and the crew shows up on the day it says.
- Demo and inspection of what’s underneath. We remove the tub, surround and old backer, then look at the framing, subfloor and valve wall. This is where hidden problems surface – rotted subfloor, a failing shutoff, old galvanized supply lines. We photograph what we find and give you a written change order if the scope has to expand. No surprises mid-week.
- Rough-in plumbing and shower pan. The drain is relocated if needed, the valve is replaced with a new pressure-balance or thermostatic valve, and the pan is built with a proper pre-slope, waterproof membrane and drain clamp. This is the step that decides whether the shower lasts 20 years or leaks in 18 months. It’s also the step we won’t cut.
- Waterproofing and tile. Cement backer board, liquid or sheet waterproofing tied into the pan, then tile on the walls and floor. We set tile with the correct substrate and movement accommodation for the size, and we grout and seal with a product rated for a wet environment. Most Dallas showers we build use porcelain or ceramic tile, with larger format on the walls for easier cleaning.
- Glass, trim and final walkthrough. Frameless or semi-frameless glass, a new showerhead and trim, a bench or niche if it’s in the scope, caulk and seal. Then a walkthrough with you, water test included, before final payment. The 730-Day Done Right Promise starts at that handoff.
Most conversions are done in three to seven working days on site. If tile is a special order, add lead time for the material – that’s the biggest variable in the calendar, not the labor.
If you’re also tackling the kitchen while you’re at it, our sister line for Kitchen Remodeling in Dallas runs on the same scheduling discipline and the same promise.
Tub-to-Shower Conversion Pricing in Dallas
Here’s what a conversion actually costs in the Dallas market, broken out so you can see where the money goes. These are real ranges we work within, and your written estimate will land somewhere in them once we’ve measured the room.
| Line item | Typical range (Dallas) |
|---|---|
| Standard alcove conversion, acrylic or solid-surface pan and surround | $3,800 – $5,500 |
| Full-tile shower, curbless or low-curb entry, frameless glass | $6,500 – $9,500 |
| Plumbing re-route (moving drain or valve wall) | $600 – $1,800 |
| Frameless glass enclosure | $900 – $2,200 |
| Bench, niche, or built-in seat | $350 – $1,200 |
| Curbless conversion (requires floor framining cut-down) | $1,200 – $3,000 |
| Subfloor or framing repair (if found) | $400 – $2,500 |
A few things drive the price up or down in Dallas specifically:
- Whether the drain moves. Keeping the drain in the same location keeps cost down. Moving it means opening the floor and re-pitching the drain line, and in slab-on-grade homes – common across much of Dallas – that’s more work than in a pier-and-beam home.
- Curbless versus curb. Curbless showers are popular for aging-in-place and accessibility, but they require cutting down the floor framing or building up the surrounding floor, which adds cost and complexity. Many Dallas conversions go low-curb instead – a two-inch threshold that’s still a big improvement over a tub wall.
- Tile selection. Porcelain in a 12×24 format is a workhorse and priced sensibly. Large-format slab tile, natural stone, or anything with a pattern match adds labor. We’ll tell you honestly which parts of the design earn their cost.
- Glass. Semi-frameless glass is the value play. Frameless is the upgrade and looks it.
We don’t do hidden line items. The number you see is the number you pay, and if we find something under the floor or behind the wall, we show you a photo and a written change order before we touch it. That’s the difference between a quote and an estimate. 0% financing for 18 months is available, and projects over $10,000 get $1,000 off. The estimate and design consult are free.
If you’d rather start with a broader look at the whole room, our Bathroom Remodeling in Dallas page has full-renovation pricing and options.
Why Groundwork Construction Co. of Dallas
We’ve been doing residential construction in Dallas since 2014, and we’ve built our process around the things that go wrong on other jobs. A written scope instead of a verbal promise. A live person on the phone at any hour – call at 2 a.m. on a Sunday before a Monday demo and someone answers. Background-checked technicians in uniform on every job, not a crew that shows up in an unmarked truck. And a 730-Day Done Right Promise that covers the workmanship for two full years, which is one of the longest guarantees in the residential construction space.
Our technicians have up to 12 years of experience and are trained to spot the things that don’t show up until month 13 – a pan that wasn’t pre-sloped, a valve that wasn’t set square, a waterproofing joint that wasn’t lapped right. We fix those before they’re a problem, and if we miss one, the promise covers it.
We also hold a curated list of material partners across every trade. On a tub-to-shower conversion, that shows up in the fixtures and finishes we can stand behind – brands like CGI and CWS for tile and shower systems, and ES Windows for any glass we spec. You’re not choosing from whatever a warehouse happened to stock; you’re choosing from products we’ve verified.
What Makes a Tub-to-Shower Conversion Last in Dallas
A shower is a wet room, and in Dallas it’s a wet room in a hot, humid climate for much of the year. That matters more than most homeowners realize. Dallas summers push indoor humidity high enough that a poorly vented bathroom stays damp for hours after a shower. Pan and waterproofing detail have to be right, and so does the exhaust fan. We check the venting as part of the scope and will tell you if the fan needs upgrading – most 1950s and 1960s Dallas homes have fans that were sized for a smaller room or that vent into the attic instead of outside. That’s a small fix with a large payoff.
We also account for the Dallas-area soil movement that comes with our expansive clay. A slab-on-grade shower pan that isn’t tied in properly to the walls can crack along a grout line as the foundation moves seasonally. We set the pan and tile to accommodate that movement, which is why we avoid some of the shortcuts you’ll see on cheaper jobs.
The bottom line: a conversion done with proper waterproofing, a code-compliant drain and pan, and materials appropriate to a Dallas bathroom will last two decades or more. A conversion done with a drop-in pan over a tired drain and a bead of caulk can leak into the ceiling below within a year. We build the first kind.
Areas We Serve
We work across the Dallas metro, and a good share of our tub-to-shower conversions are in these neighborhoods:
- Lakewood and East Dallas – older ranches, original baths, single-bath homes
- Preston Hollow, Midway Hollow and Bluffview – larger baths, curbless and frameless upgrades
- Oak Cliff and Kessler Park – pier-and-beam homes, tile-down-to-the-floor showers
- Plano, Richardson and Garland – two-bath homes converting the hall tub
- Uptown, Knox-Henderson and the Park Cities – primary baths with stone and glass
- Frisco, Allen and McKinney – newer builds where the builder tub is the candidate
If you’re nearby and want to know whether we cover your block, call and ask. We’ll tell you straight.
If you’re outside Dallas, we also serve homeowners in Bathroom Remodeling in Fort Worth and Bathroom Remodeling in Arlington. Our roofing team is also active across the metro if you need Roofing in Dallas or Roofing in Fort Worth, and our windows line at Windows & Doors in Dallas handles the glass and exterior side.
FAQs – Tub-to-Shower Conversion
How much does a tub-to-shower conversion cost in Dallas?
A tub-to-shower conversion in Dallas typically costs $3,800 to $9,500, with most projects landing between $5,000 and $8,000. The range depends on whether the drain moves, whether the shower is curbless, what tile you select, and whether the glass is semi-frameless or frameless. A standard alcove with an acrylic pan and surround starts around $3,800; a full-tile curbless shower with frameless glass runs closer to $9,500. Call (844) 797-4808 for an exact quote – estimates and design consults are free.
Can you convert a tub to a shower without moving the plumbing?
Yes, in most Dallas homes. If the tub drain and valve wall stay in the same location – which is common when the tub is a standard 60-inch alcove – the conversion doesn’t require moving the drain. We still replace the valve with a new pressure-balance or thermostatic valve and rebuild the pan and drain assembly. Moving the drain adds $600 to $1,800 and is more involved in slab-on-grade homes. We’ll tell you at the estimate which case you’re in.
How long does a tub-to-shower conversion take?
Most conversions are complete in three to seven working days on site, plus lead time for any special-order tile or glass. A standard alcove with stocked materials can finish in three; a full-tile curbless shower with frameless glass usually takes six to seven. We schedule the work window in writing before we start and don’t leave a half-finished shower for a week while we wait on parts. Call (844) 797-4808 to get a date on the calendar.
Is it cheaper to repair my tub or convert to a shower?
Converting to a shower is usually the better long-term value, even though it costs more upfront. A tub refinish runs $400 to $700 and buys time, but it doesn’t fix the surround, the valve, or the waterproofing behind the wall – and Dallas water is hard enough that refinishes tend to fail sooner here than in softer-water markets. A conversion that includes a new pan, new valve and new tile lasts 20 years or more. If the tub is fine and you just want a shower, the conversion still wins; if the tub is failing, the conversion is the fix. For a straight comparison, call (844) 797-4808 – we’ll walk you through the numbers.
Do I need a permit for a tub-to-shower conversion in Dallas?
Yes, most conversions need a plumbing permit because the drain and valve assembly change. We pull the permit and schedule the inspection as part of the project; it’s included in the written scope and the price. Homeowners who try to skip the permit often create a problem at resale, and a leak that starts under an unpermitted pan isn’t covered by insurance. We handle code compliance for you.
Can you do a curbless shower for aging in place?
Yes. A curbless or low-threshold shower is one of the most common requests we get in Dallas, especially for households planning for a parent. Curbless requires either cutting down the floor framing or building up the surrounding floor, which adds $1,200 to $3,000 to the project. A low-curb shower with a two-inch threshold delivers most of the accessibility benefit at lower cost. We’ll talk through both and let you decide.
What brands and materials do you use?
We work from a curated list of verified partners across every trade. On tub-to-shower conversions that means tile and shower systems from brands like CGI and CWS, and glass from ES Windows. We’re not tied to a single manufacturer, and we don’t push an upgrade you didn’t ask for. We’ll show you the products in the estimate so you know exactly what’s going in your bathroom.
Call (844) 797-4808 for a free estimate and design consult on your Dallas tub-to-shower conversion. We answer live, 24 hours a day, seven days a week. You’ll get an upfront price in writing, a scheduled start date, and the 730-Day Done Right Promise behind the work. From foundation to finish line, we build it once and back it in writing.