Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Backsplash, Tile & Flooring in Highland Park, TX: What It Takes and What It Costs
Backsplash, tile and flooring work in Highland Park runs $14,000 – $45,000 for a full kitchen-scope project, with a standalone backsplash at $800 – $2,500 and floor tile priced by the square foot within that total. Most of our Highland Park tile projects take three to seven working days on site, plus a day of prep and layout before the first tile goes down. Call (844) 797-4808 for a free on-site estimate, and we’ll put the number in writing before anything gets demoed.
How a Tile and Flooring Project Actually Runs, Day by Day
Tile work looks simple from the outside. It isn’t. The difference between a floor that’s flat and a backsplash that’s straight is almost entirely in the prep, and that’s where most of the schedule goes. Here’s the real sequence we follow in Highland Park homes.
Stage 1: Demo and substrate inspection (1 – 2 days)
We pull the old backsplash, flooring or both, then look at what’s underneath. In Highland Park’s 1910s – 1930s houses, that’s usually where the surprises live: old mastic over drywall that crumbles on removal, or a floor that was leveled with a skim coat over uneven subfloor. You decide here whether we replace the substrate or patch it. Replacing adds a day and cost but prevents cracked tile a year later.
Stage 2: Layout and dry-fit (half a day)
This is the stage homeowners underestimate. We lay out the tile pattern on the floor or wall dry, before any thinset, so you can see where the cuts land. For a kitchen backsplash, that means deciding whether the tile starts at the counter or centers on the range. For flooring, it means picking the direction and where the field tile meets the room edges. You approve the layout in person. Changing it after the tile is set means starting over.
Stage 3: Substrate prep and waterproofing (1 day)
Floors get a leveling compound and a crack-isolation membrane where the slab or subfloor has movement. Backsplashes over new drywall get a primer coat so the thinset bonds. If the tile is going in a wet area, we roll on a waterproof membrane and let it cure overnight. This stage isn’t glamorous, but it’s the one that determines whether the job holds for a decade.
Stage 4: Setting tile (2 – 4 days)
Large-format floor tile goes down first, then the backsplash, so nothing gets walked on before it’s cured. Grout comes 24 hours after the last tile is set. You decide grout color and width here. A 1/16-inch joint in a matching grout reads as a seamless field; a wider contrasting joint makes the pattern the point. We bring samples so you’re choosing against your actual counter, not a photo.
Stage 5: Grout, seal, and final walkthrough (1 day)
We grout, seal natural stone if you chose it, reinstall outlet covers and trim, and walk the job with you. Anything that doesn’t meet the standard gets fixed before we call the job done, backed by our 730-Day Done Right Promise.
If this tile work is part of a bigger change, it usually makes sense to sequence it with Kitchen Remodeling in Highland Park so the trades don’t step on each other.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Choose Between
Most of the decisions on a tile project come down to five or six real choices. Here’s the honest trade-off on each.
- Porcelain vs. ceramic tile: Porcelain is denser, handles moisture better, and costs roughly 20 – 30% more per square foot. Ceramic is fine for a backsplash but we steer Highland Park homeowners toward porcelain on floors, especially over slab-on-grade where the clay moves.
- Natural stone (marble, travertine, slate): Beautiful and period-appropriate for these homes, but needs sealing every year or two and doesn’t love acidic cleaners. Budget 30 – 50% more than porcelain for the same area.
- Tile size: Large-format (12×24, 24×24) reads modern and means fewer grout lines, but demands a perfectly flat substrate. Smaller subway or hex tile is more forgiving of an old floor and fits the 1920s – 1930s look.
- Backsplash height: Counter-to-bottom-of-cabinet is the standard. Full-height to the ceiling adds visual impact and roughly 40% more tile area, plus more cuts around outlets and windows.
- Flooring material: Tile throughout is the durable choice for kitchens and baths. Where the tile meets original oak in a hallway, we plan a transition strip rather than trying to match an 80-year-old wood floor.
What Backsplash, Tile & Flooring Costs in Highland Park, TX
For a full kitchen-scope tile and flooring project in Highland Park, expect $14,000 – $45,000. A standalone backsplash runs $800 – $2,500. Floor tile is bundled into the larger number but priced per square foot, and the five variables below push a job toward one end or the other.
| Line item | Typical Highland Park range |
|---|---|
| Backsplash installation | $800 – $2,500 |
| Floor tile (materials + labor) | Priced per sq ft within project total |
| Substrate replacement | Adds to base |
| Full kitchen-scope tile & flooring project | $14,000 – $45,000 |
The low end is a straightforward backsplash swap over sound drywall, standard porcelain, no plumbing or electrical moves. The high end is a full kitchen floor and backsplash with substrate replacement, full-height tile, natural stone, and electrical outlets relocated to the new tile plane. What’s included in a written estimate: tile setting, grout, sealant, substrate prep, and haul-away of old material. Not included: tile material itself if you’re supplying it, and any structural repair uncovered after demo. Our upfront pricing means the number you see is the number you pay, with no change orders unless you approve a scope change in writing.
See the difference
Before
After
Before
After
Before
AfterWhat Highland Park Homes Specifically Do to This Job
Highland Park is a nearly fully built-out enclave of century-old homes, and that shapes tile work in ways it doesn’t in a newer suburb. Construction here almost always means renovation inside a standing structure, and every project runs under the Town of Highland Park’s own permitting and design review, not Dallas codes. Older homes on small lots come with quirks: original plumbing and wiring behind the walls, floors that have settled over expansive clay soils, and narrow, tree-canopied streets where a delivery truck needs coordination before it can unload pallets of tile.
Inside these 1910s – 1930s Tudor, Colonial and Mediterranean houses, we routinely find tile set over a mortar bed that’s still solid after 80 years, or the opposite: a 1990s remodel where the previous installer tiled straight over plywood and the grout has been cracking ever since. Matching the period of the home matters too. A subway tile with a hand-glazed finish fits a 1920s kitchen; a 24×24 porcelain in the same room fights it. North Texas heat and seasonal movement also mean we plan for expansion joints in larger floor fields. This same care carries over to Vanities, Tile & Fixtures in Highland Park, and homeowners often pair a kitchen tile refresh with Tub-to-Shower Conversion in Highland Park when they’re updating both rooms at once.
Serving Highland Park, TX – Our Local Coverage Area
We serve Highland Park and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: Backsplash, Tile & Flooring in Highland Park
A typical backsplash alone takes two to three working days on site, and a combined floor-and-backsplash project runs five to seven days. Larger kitchens with substrate replacement, full-height tile, or natural stone add a day or two. Call (844) 797-4808 for a schedule estimate specific to your kitchen.
Tile and flooring replacement alone usually doesn’t trigger a permit, but in Highland Park, any change to plumbing or electrical behind the tile falls under the town’s permitting process. If we’re moving an outlet for the new backsplash or relocating a sink, we pull the permit and schedule the inspection. We handle that coordination so you don’t have to sit on hold.
Yes. The majority of backsplash and floor tile projects don’t touch plumbing or structure, which keeps the schedule short and the cost on the lower end of the range. If demo reveals a water-damaged wall or a soft subfloor, we tell you before proceeding and give you a written added-cost estimate to approve.
A standalone backsplash runs $800 – $2,500, and a full kitchen-scope tile and flooring project runs $14,000 – $45,000 depending on size, substrate condition, tile grade, and whether outlets or plumbing move. Call (844) 797-4808 for an exact quote. Estimates are free and written line by line.
All tile and flooring work is covered by our 730-Day Done Right Promise: if it’s not done right, we make it right. That covers workmanship like cracked grout, loose tile, and failed setting. It’s backed in writing and it’s one of the longest workmanship guarantees in residential construction.
Get a Free Backsplash, Tile & Flooring Estimate in Highland Park
Call (844) 797-4808 to schedule your free on-site estimate for backsplash, tile and flooring in Highland Park. We’ll measure, look at the substrate, talk through material options with real samples, and hand you a written line-item quote the same visit. Our technicians have up to 12 years of experience, and we cover Highland Park as part of our kitchen remodeling service. A live person answers, any hour.
Written by the team at Groundwork Construction Co.