Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in Cedar Hill, TX: What the Job Actually Takes
New cabinets and countertops in Cedar Hill, TX usually run $14,000 – $45,000 for a full kitchen’s worth of both, with a typical layout landing near $22,000. The work itself takes 3 to 6 weeks from demo to final caulk, and most of that time is spent waiting on countertop fabrication, not installing boxes. Call (844) 797-4808 and we’ll walk your kitchen, measure it, and put a written line-item number in front of you.
The Order of Operations: How Cabinets and Countertops Come Together
Anyone can quote you a cabinet. The part that separates a clean job from a mess is sequence, because cabinets have to be locked in place before the first template is ever pulled. Here’s how the weeks actually break down on a Cedar Hill kitchen.
Stage 1: Measure, design, and order (week 1)
We measure the room to the sixteenth of an inch, then check it against a laser level, because a 1980s Cedar Hill ranch off Wintergreen can have a floor that’s out of plane by an inch across ten feet. You decide box construction (plywood versus particleboard), door style, finish, and whether we’re moving the sink or range. Lead times get booked here, and that’s the number that governs everything downstream.
Stage 2: Demo and prep (days 1 – 2)
Old cabinets and tops come out, and we open up the wall behind them to check what’s real. In Cedar Hill’s older homes this is where we find out whether the shutoff valves still turn, whether the range outlet is a proper dedicated circuit, and whether the drywall behind the backsplash is sound. You decide nothing here unless the wall tells us something has to change.
Stage 3: Rough-in and drywall (days 2 – 4)
If you’re relocating the sink, adding a disposal, or shifting the range for a wider hood, the plumber and electrician come in now, before anything gets reset. Electrical and plumbing changes are inspected if the scope triggers it. Drywall patches go up and get finished, because you can’t hide that work once base cabinets are in.
Stage 4: Set cabinets and template the tops (days 5 – 7)
Base cabinets get set, leveled, and shimmed to the high point of the floor, then wall cabinets hang. A countertop fabricator comes out with a physical template, or a digital one for stone, and the slab gets cut off-site. That fabrication window is 5 to 10 business days, and it’s the single biggest chunk of calendar time in the whole project. You’ll pick your slab at this point if it’s natural stone.
Stage 5: Tops, sink, hardware, punch list (final 2 – 3 days)
The countertop lands, the sink and faucet get set, and the undermount gets fastened and sealed. Doors and drawers are adjusted, pulls and knobs go on, and we walk the room together. Anything on the punch list gets handled before we close the job, and that work sits under our 730-Day Done Right Promise.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Real Options You’ll Weigh: Boxes, Tops, and the Trade-offs
The spec conversation is where budgets quietly drift, so here’s the honest version of what each choice buys you.
- Plywood versus particleboard boxes. Plywood resists moisture and holds screws longer; particleboard costs less and is fine in a dry, ventilated kitchen. Given Cedar Hill’s summer humidity swings, we lean plywood for anything near the sink.
- Stock, semi-custom, or full custom. Stock sizes fit standard runs and ship fast. Semi-custom lets you adjust depth and height without full-custom pricing, which matters in older homes with odd ceiling heights.
- Laminate vs. quartz vs. granite tops. Laminate is the budget play and shows wear at the sink edge first. Quartz is the durable, low-maintenance middle, and brands like Cambria fall here. Granite is natural stone with real variation, but it needs periodic sealing.
- Butcher block and solid surface. Butcher block is warm and repairable but demands oiling; solid surface (think Corian) can be sanded and rejoined, which suits families that will actually use the counters hard.
- Undermount vs. drop-in sink. Undermount cleans easier and drives the countertop cutout choice; a drop-in is cheaper and easier to replace later.
- Soft-close and full-extension hardware. Upgrading to soft-close hinges and full-extension drawers is a modest line item that most homeowners say they’d pay for twice.
What Cabinets & Countertops Cost in Cedar Hill, TX
Expect $14,000 – $45,000 for a full kitchen’s cabinets and counters together, with cabinet installation running $4,000 – $13,000 and countertop installation another $2,000 – $6,500. Breaking it into parts makes the range readable:
| Line item | Range |
|---|---|
| Cabinets (box + install) | $4,000 – $13,000 |
| Countertops (fabricate + install) | $2,000 – $6,500 |
| Backsplash (allowance) | $800 – $2,500 |
| Island (if you’re adding one) | $3,000 – $10,000 |
What pushes a job to the low end: standard 10×10 footprint, stock cabinets, laminate tops, no plumbing or electrical moves, and a floor that’s already level. What pushes it high: a large L or U layout with an island, semi-custom cabinetry, quartz or stone, relocating the sink or range, and anything that requires a plumber, electrician, or inspection. That $14,000 – $45,000 range for the full kitchen starts here and climbs with every one of those variables you add. Beyond cabinets and counters, a Cedar Hill kitchen often grows into more – if you’re also touching floors or walls, that’s part of a full Kitchen Remodeling in Cedar Hill scope.
Every written estimate we hand you lists materials, labor, and permits line by line, with the number you see being the number you pay. What’s not included gets named up front: appliance purchase and delivery, disposal replacement, and any rot we can’t see until demo. Get a free project estimate and design consult to lock the scope down.
See the difference
Before
After
Before
After
Before
AfterHow Cedar Hill’s Hills and Older Homes Change This Job
Cedar Hill’s terrain is the part that surprises people. The city dips and rises from lot to lot under a lot of mature tree cover, and in the older single-family neighborhoods the floors reflect it. Out-of-level kitchen floors are common enough that we shim and level as a matter of course, and in the original townsite’s ranch homes we find cabinets set against walls that have moved on Cedar Hill’s expansive clay over decades. That’s a cabinet-install problem more than a cabinet problem. On the west side toward Joe Pool Lake, the ground can turn to solid limestone within a few feet, which matters when a new island’s electrical run has to get below slab. East-side lots under the mature oaks often need a protection plan before anyone drives a truck up. Spring and fall are the better windows for anything that opens a wall, since North Texas summers turn an open kitchen into a dust-and-heat management job. We work all over Cedar Hill, from 75104 to 75106.
Serving Cedar Hill, TX – Our Local Coverage Area
We serve Cedar Hill and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Cabinets & Countertops in Cedar Hill
Most projects run 3 to 6 weeks from demo to finish, and the longest single wait is countertop fabrication at 5 to 10 business days. The install itself takes about a week of on-site work. Call (844) 797-4808 for a schedule tied to your actual lead times.
Straight cabinet and countertop swaps generally don’t require a permit, because they’re finish work. The moment you move plumbing, add a circuit, or move a wall, permits and inspections come into play, and we pull them as part of the scope. Estimates are free if you want to know which side of that line your project sits on.
Yes, and it’s the most common way we do this job. Keeping the sink and range in place saves both money and time, and if your existing layout already works, there’s no reason to move it. Call (844) 797-4808 and we’ll tell you whether your layout is worth keeping.
Plan on $14,000 – $45,000 for a full kitchen’s worth of both, with the number tied to layout size, material grade, and whether plumbing or electrical gets relocated. Call (844) 797-4808 for an exact quote, and estimates are free.
Every installation is covered by our 730-Day Done Right Promise – if the workmanship isn’t right, we make it right for two full years. Manufacturer warranties on boxes and tops come on top of that. Call (844) 797-4808 to review the details before you commit.
Ready to Price Your Cedar Hill Kitchen?
Call (844) 797-4808 to schedule a free on-site estimate for cabinets & countertops in Cedar Hill. We’ll measure the room, talk through materials and lead times, and hand you a written line-item quote with the scope spelled out and no surprises buried in it. If your project runs wider than the kitchen, our Kitchen Remodeling service covers the full scope, and homeowners often pair the work with Walk-In Showers & Shower Remodeling in Cedar Hill or a Tub-to-Shower Conversion in Cedar Hill while walls are already open. Calls are answered by a live person, 24/7.
Written by the team at Groundwork Construction Co.