Full Bathroom Remodeling in Dallas, TX: What It Takes and What It Costs
A full bathroom remodeling in Dallas means gutting the room to the studs and rebuilding it top to bottom, and most Dallas jobs take four to six weeks of actual construction. Budget $9,000 – $28,000 for the work, with most Dallas homeowners landing between $15,000 and $22,000 depending on tile, fixtures and how much plumbing moves. Call (844) 797-4808 to schedule your free on-site estimate; we’ll bring a written line-item quote you can read without a decoder ring.
If you’re weighing a full remodel against a lighter refresh, it helps to understand where the wider scope starts. The full version is part of our Bathroom Remodeling in Dallas work, but it goes further: new subfloor, new valve and drain rough-in, new wall board rated for wet areas, and every fixture replaced. No original 1970s tile surviving behind a shower surround.
How a Full Bathroom Remodeling Project Moves, Stage by Stage
This is the part most bids leave vague, so here’s the real sequence. Every stage has a decision you need to make, and the order matters because tile you pick late can stall the whole job.
Stage 1: Demo and discovery (days 1 – 3)
We protect the floors, shut off water, and demolition the room down to studs and joists. On older Dallas homes, this is where surprises live: rotted subfloor under the toilet, cast iron drain lines at the end of their life, or aluminum wiring that won’t carry a new fan and vanity circuit. You decide nothing here yet. We document what we find and photograph it before anything gets covered back up.
Stage 2: Rough-in and framing (days 4 – 7)
Plumbing moves to its new location if the layout is changing, electrical gets a defined layout for lighting and outlets, and the vent fan gets ducted properly. If a wall moves and it’s load-bearing, that gets addressed now. Your decision: confirm the final fixture placement and where the GFCI outlets go, especially near the vanity and tub. This is the last easy moment to move a valve.
Stage 3: Inspection (1 – 2 days, scheduled)
Rough plumbing and electrical inspections happen before any wall is closed. Dallas requires permits for this scope, and skipping them creates a problem at resale when an underwriter or buyer asks for records. We pull the permits and coordinate inspections, so you’re not the one making calls.
Stage 4: Tile, finish and fixtures (days 8 – 24)
Waterproofing membrane goes on before tile, and that’s the single most important step in the whole job. Tile setting runs around five to eight days for a standard bath. Then flooring, grout, plus setting the vanity, toilet, and shower trim. Your decisions: grout color, niche placement, and whether to add heated flooring. Get these locked before tile starts.
Stage 5: Trim, paint and punch list (days 25 – 30)
Baseboards, paint, glass install, caulk, and a final walkthrough with you. We test every valve, check slope so water drains right, and hand you the punch list. If something isn’t right, we fix it before we call the job done, and it stays covered under our 730-Day Done Right Promise.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Actually Choose Between
Most of your budget swings on four decisions. Here’s the honest trade-off on each.
- Tile on the floor and walls: Porcelain is the default for wet areas. It’s dense, resists water, and costs less than natural stone. Large-format 12×24 porcelain lines up clean and shows less grout to scrub. Marble or travertine looks great but needs sealing every year or two in a humid Dallas bath, and it costs meaningfully more per square foot.
- Shower or tub-and-shower combo: A walk-in shower opens the room but usually means relocating the drain and adding a linear or center drain. Keeping the tub footprint costs less. If you want the shower-only conversion specifically, that has its own pricing page; this full job folds it in with everything else.
- Vanity and countertop: A stock vanity with a quartz or solid-surface top saves money. A custom cabinet with a stone top costs more but fits an awkward Dallas bath where stock sizes leave gaps. Kohler and Moen are the fixtures we spec most, and both hold up to hard water and daily use.
- Ventilation: A properly sized, ducted bath fan is not optional in Dallas. Without it, humidity sits on the walls and grows into a mold problem within a couple of summers. We size the fan to the room and duct it outside, not into the attic.
What Full Bathroom Remodeling Costs in Dallas, TX
The Dallas market range for a full bathroom remodeling runs $9,000 – $28,000. Here’s how the number moves:
| Scope item | Typical range |
|---|---|
| Full bathroom remodeling (turnkey) | $9,000 – $28,000 |
| Walk-in shower installation | $4,500 – $12,000 |
| Tub-to-shower conversion | $3,500 – $10,000 |
| Shower replacement | $3,000 – $8,500 |
| Vanity installation | $800 – $3,000 |
Five variables push a job to the low versus high end:
- Room size: A 35-square-foot hall bath sits near $9,000. A primary bath over 80 square feet hits the top of the range.
- Existing condition: Rotted subfloor, failed cast iron drain, or water damage behind the tile adds real money because it has to be fixed before finishes go in.
- Relocating plumbing or electrical: Moving the toilet or shower drain across the slab is the biggest single add. Keeping fixtures in place is the cheapest path.
- Material grade: Porcelain and stock cabinets versus marble and custom cabinetry can swing the job by $6,000 – $10,000 on the same footprint.
- Permit scope: A layout change triggers more inspection steps than a same-location replacement, and that adds both time and permit cost.
Your written estimate lists each line item and a fixed price, so the number we quote is the number you pay. With 0% financing for 18 months and $1,000 off projects over $10,000, a full remodel in Dallas is more reachable than the sticker suggests. Call (844) 797-4808 for a free estimate.
See the difference
Before
After
Before
After
Before
AfterWhat Dallas Homes Specifically Do to This Job
Dallas sits in the heart of the Blackland Prairie clay belt, where the soil swells and shrinks hard with the wet-dry cycle. That matters in a bathroom more than in any other room. The bathroom is small, wet, and heavy, with a tub, tile, and vanity all pushing down on a slab that’s already moving with the seasons. If the foundation has shifted, the tile, the drain alignment, and even the door frame will fight back. We check for that before we set a single tile. Dallas code also runs on no-freeze-depth and high-wind-zone assumptions, so a new bath fan ducted through the roof gets flashed to the same standard as the rest of the envelope, and that’s one place homeowners often pair this work with Roof Repair in Dallas.
Housing stock shapes the work. Older pier-and-beam bungalows in Oak Cliff and East Dallas hide cast iron, galvanized lines, and non-standard framing, and those jobs involve more repair than remodel for the first week. The 1950s – 70s slab-on-grade ranch homes across much of Dallas usually have solid plumbing at the fixtures but aging subfloor prepping and a soffit-sized fan duct. The newer infill builds up north tend to have better bones and simpler demo. Wind and hail drive some of what we spec on the envelope, which is why a bath job that touches the roof often gets paired with Roof Replacement & Installation in Dallas when the shingles are already at end of life. We also work in Bathroom Remodeling across nearby Highland Park and University Park, where HOA and historic-district review can add a step before exterior-facing work starts.
Serving Dallas, TX – Our Local Coverage Area
We serve Dallas and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Full Bathroom Remodeling in Dallas
Most full bathroom remodels in Dallas take four to six weeks of active construction, plus a short gap for inspection scheduling. The timeline stretches when surprises show up under the tile, like a failed drain or rotted subfloor. Call (844) 797-4808 to get a timeline tied to your actual room.
Yes. Dallas requires permits for plumbing, electrical, and structural work in a bathroom remodel, and rough-in inspections happen before walls close. Skipping them causes trouble at resale. We pull the permits and schedule the inspections, so your project stays on the right side of the record.
Usually yes, and it’s the cheaper route. Keeping the toilet, shower, and sink where they are avoids cutting up the slab to move drains, which is the single biggest cost add on a Dallas bathroom. You still get new fixtures, tile, and finishes; you just don’t pay to relocate plumbing.
Expect $9,000 – $28,000, with most project totals landing between $15,000 and $22,000. Room size, existing damage, plumbing moves, and material grade drive the difference. Call (844) 797-4808 for an exact quote; estimates are free and come with a written line-item.
Our 730-Day Done Right Promise covers workmanship for two full years, one of the longest guarantees in residential construction. If something we installed fails, we make it right. We back every project with it, and our technicians have up to 12 years of experience on bathroom work.
Schedule Your Free Estimate
Call (844) 797-4808 to book a free on-site estimate for a full bathroom remodeling in Dallas. A live person answers around the clock, so there’s no voicemail. On the call we’ll ask about your room, your layout, and your budget, then schedule a visit where we measure, check the subfloor and plumbing, and hand you a written line-item quote with a fixed price. From there, you decide without pressure.