A Groundwork company - serving Dallas, TX
Full Bathroom Remodeling in University Park, TX | Groundwork Construction Co. of Dallas

Full Bathroom Remodeling in University Park - Fixed Price, One Bathroom at a Time

Free in-home consult and a written, line-item quote before demo starts. We work one bathroom at a time so your house stays livable, and the signed price is the final price. Licensed, insured, permits handled.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Bathroom remodelingBathroom remodeling
Kitchen remodelingKitchen remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Full Bathroom Remodeling in University Park, TX: What It Costs and How Long It Takes

A full bathroom remodeling in University Park typically runs $9,000 – $28,000 and takes four to seven weeks of build time once demo starts. That range covers a complete gut of the room: new tile, vanity, shower or tub, toilet, lighting, ventilation, and finished plumbing and electrical. On the 1920s – 1950s brick cottages in ZIP 75225, the number lands mid-to-high in that range because original cast-iron plumbing and knob-and-tube-era wiring usually get corrected while the walls are open. Call (844) 797-4808 for a free on-site estimate and a written line-item quote.

Call (844) 797-4808

The Sequence We Follow, Day by Day and Stage by Stage

A full bath gut follows a fixed order. Skipping a stage is how remodels end up reopening finished walls six weeks later. Here is the real sequence.

Stage 1: Site protection and demolition (2 – 3 days)

We seal the doorways and floor paths first, because dust travels through the whole house. Demo removes the old tile, vanity, toilet, tub or shower surround, and drywall back to studs where it’s wet or failing. You decide at this point whether to keep the existing layout or move a fixture, since that call changes everything downstream.

Stage 2: Rough-in corrections and framing (2 – 4 days)

Plumbing supply and drain lines get replaced or re-routed, along with electrical for lighting, GFCI protection, and the exhaust fan. If your University Park home still has cast-iron drains or old wiring, we replace that here, not later. You approve the fixture locations and the venting plan before anything closes up.

Stage 3: Rough inspection (1 day, plus city scheduling time)

The city inspects plumbing and electrical before drywall goes on. We schedule the inspection and meet the inspector; you don’t have to be home. This is the stage where University Park’s permitting process becomes real, and where we build in the wait.

Stage 4: Drywall, waterproofing, and tile (7 – 10 days)

Drywall, then cement backer board and a bonded waterproofing membrane in the wet areas, then tile. Laying tile on green board is the shortcut that leads to a failed shower pan later. You choose tile size, grout type, and niche placement before this stage so the schedule doesn’t stall.

Stage 5: Set, trim, and final inspection (5 – 7 days)

Vanity, countertop, toilet, shower glass, fixtures, mirror, and paint go in, then the final inspection. After that comes a punch walk with you. Our technicians have up to 12 years of experience, and they close out the job the same way they opened it: with the details checked and signed off.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Options You’ll Actually Choose Between

Most of the dollar swing on a full bath comes from four decisions you make before demo. Here’s the honest trade-off on each.

  • Tile material: Porcelain runs roughly $4 – $12 per square foot installed and holds up against North Texas hard water with minimal upkeep. Natural stone costs two to three times more and needs sealing.
  • Shower vs. tub: A tiled shower with a built-in bench is the most requested upgrade, but it’s a separate discussion from the tub-to-shower reconfiguration some homeowners need. Toilet brands for the room run from American Standard at the accessible end to Moen-compatible contemporary styles at the higher end.
  • Vanity and countertop: A stock vanity with an integrated top lands at the low end of our $800 – $3,000 vanity range; a custom cabinet with a quartz top lands high. The gap is real, so decide before demo, not after.
  • Ventilation: A properly sized exhaust fan tied to a timer is non-negotiable in humid North Texas summers. Cheap fans fail the inspection and fog the mirrors.
  • Waterproofing method: A bonded membrane system costs more up front than cement board alone, but it’s what keeps a shower pan from leaking into the floor joists years down the road.

We carry a curated set of brand partners across every trade, from Kohler fixtures to tile and cabinetry lines, so you’re choosing on quality rather than whatever happens to be in stock. If this bath is part of a full Bathroom Remodeling in University Park scope that touches a second bath or a laundry room, tell us at the estimate so the plumbing work is priced once, not twice.

What Full Bathroom Remodeling Costs in University Park, TX

Our full bathroom remodeling range for University Park is $9,000 – $28,000. Where a specific job falls inside that band comes down to five variables:

  • Room size: A 5-by-8 hall bath and a 10-by-12 primary bath are different jobs by roughly 50%.
  • Existing condition: Cast-iron drains, galvanized supply lines, and failing subfloor are common in ZIP 75225 homes and push a job toward the top of the range.
  • Layout changes: Moving a toilet or shower drain adds $1,500 – $4,000 in plumbing and framing.
  • Material grade: Tile, vanity, and fixtures drive most of the visible spend; upgrade all three and you’ll land high.
  • Permit and inspection scope: Plumbing and electrical changes require permits and inspections; a cosmetic refresh with no moves may not.

A written estimate from us lists each line with material allowance and labor, plus what’s excluded. What’s typically not included: hidden rot or foundation correction behind the wall, hazardous-material abatement, and any structural work if the inspector flags something once walls are open. We don’t promise to absorb those; we do flag them in writing and get your approval before doing them. Upfront pricing means the number you see is the number you pay, with no change orders for work already agreed to.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What University Park Homes Specifically Do to This Job

University Park is a built-out, landlocked Park Cities enclave with essentially no vacant land, so nearly every full bathroom remodeling project here is a rebuild or major remodel inside a house that’s already standing. Housing stock runs from 1920s – 1950s brick and frame cottages to large new custom builds, often on 50- to 70-foot lots. On the older homes we routinely find pier-and-beam or early slab foundations, original cast-iron plumbing, and knob-and-tube-era wiring that get corrected during the renovation. Because lots are narrow and alleys back many blocks, staging and delivery access are tight, and mature live oaks have to be protected during demo haul-off. The permitting process and building department review are thorough, so we plan for the inspection schedule early. North Texas heat, expansive black clay, and heavy spring storms also mean we watch foundation and drainage around the bath, especially on homes near Snyder Plaza or along University Boulevard, where grading and older foundations compound the work.

Homeowners often pair the bath with exterior work at the same time; if you’re already staging a dumpster, look at our Roof Repair in University Park and Roof Replacement & Installation in University Park services to bundle the access and save the second setup.

Serving University Park, TX – Our Local Coverage Area

We serve University Park and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – Full Bathroom Remodeling in University Park

Get a Free Estimate for Full Bathroom Remodeling in University Park

Call (844) 797-4808 to schedule a free on-site estimate and design consult for full bathroom remodeling in University Park. A live person answers 24/7, and we’ll walk your room, measure, and talk through layout and material options before writing a line-item quote. You’ll also hear about the $1,000 off projects over $10,000 and 0% financing for 18 months. We cover University Park from our University Park service area, and you can read more about our Bathroom Remodeling service before your appointment.

Written by the team at Groundwork Construction Co.

Why University Park Chooses Groundwork Construction Co. of Dallas

We set the standard for full bathroom remodeling in University Park.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in University Park

Getting your full bathroom remodeling project started is simple.

1

Call or Request a Free Estimate

Tell us about your full bathroom remodeling project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local full bathroom remodeling pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What University Park Customers Say

Trusted by homeowners across University Park and surrounding areas.

★★★★★

"We lived in the house through the whole thing. He kept the dust wall up, cleaned every Friday, and made sure we always had a working bathroom."

Craig Whitaker
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett

Ready for Full Bathroom Remodeling in University Park?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in University Park.

(844) 797-4808

Request a Free Estimate in University Park

Tell us about your full bathroom remodeling needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Local Service Coverage
Call Now - 24/7 Dispatch