Small & Partial Kitchen Remodels in Irving, TX: What They Cost and How Long They Take
Small & partial kitchen remodels in Irving, TX typically run $14,000 to $45,000 and take three to six weeks of on-site work depending on how much gets moved. That range covers a focused update: new cabinets, countertops, a backsplash, lighting, and floor patching on a typical South Irving ranch kitchen of 100 to 150 square feet. If you’re keeping the footprint and reusing the plumbing and electrical locations, you’ll land near the bottom of that band. Call (844) 797-4808 and we’ll put an exact number on your kitchen rather than a ballpark.
The Five-Stage Sequence We Follow on a Partial Kitchen in Irving
Most contractors skip straight to demo. We don’t. Here’s the actual order of events, with the decisions you’ll need to make at each stage.
Stage 1: Site visit and measurements (day 1, two to three hours)
We measure every wall, locate the shutoffs, and confirm what’s behind the drywall where we can. This is where you decide your cabinet layout and whether the sink or range moves. Moving either one changes everything downstream, so we settle it here. You leave with a written scope and a fixed number.
Stage 2: Ordering and lead-time window (days 2 to 21)
Cabinets drive the calendar on almost every Irving kitchen we touch. Stock boxes arrive in seven to ten days; built lines like KraftMaid and semi-custom runs take three to five weeks. You pick door style, finish, and box construction here. We schedule demo to start the day materials land, not before.
Stage 3: Demo and rough-in (days 1 to 3 of construction)
We pull the old counters, cabinets, and backsplash and protect the flooring you’re keeping. If you’re shifting a circuit for a new range hood or adding outlets, the electrician roughs that in now. Older homes in the 75060 and 75061 ZIP codes sometimes hide aluminum wiring or galvanized supply lines, and we flag those the day we open the wall, not after cabinets are hung.
Stage 4: Cabinet set, counter template, and install (days 4 to 12)
Cabinets go in first, level and shimmed to the wall. Then the countertop fabricator templates the actual installed boxes, which takes five to seven business days for Cambria or granite. We set appliances, tie in the sink and disposal, and run the new lighting.
Stage 5: Backsplash, paint, and punch list (days 13 to 18)
Tile goes up last so the cuts land clean against the counter. Then paint, caulk, and a walkthrough where you sign off line by line. Most partial kitchens finish inside three weeks of construction time once materials are on site.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Choose Between, and What Each One Costs You
A partial kitchen is a series of trade-offs, and the honest version of each matters more than a brochure.
- Cabinet boxes: Plywood boxes hold up to moisture and last far longer than particleboard, and they cost meaningfully more. In a kitchen you’ll keep for a decade, plywood is the right call. If you’re selling in two years, stock particleboard with a good face frame is defensible.
- Countertops: Cambria or granite runs $2,000 to $6,500 installed and holds up to heat and knife slips. Laminate is a fraction of that and looks it within five years. Quartz wins on low maintenance; granite wins on price for the same visual weight.
- Backsplash: $800 to $2,500. Ceramic subway tile is forgiving and cheap to install. Full-slab or large-format porcelain looks dramatic but the cuts and setting costs climb fast.
- Doors and hardware: Refacing keeps your existing boxes and swaps doors and fronts. It’s the cheapest path to a new look, and it only makes sense if the boxes are solid and square.
- Layout vs. footprint: Keeping the sink and range where they are saves $2,000 to $6,000 in plumbing and electrical work. Moving them opens better flow but drags rough-in, permits, and inspection into the job.
- Flooring: Patching under new cabinets is normal. Replacing the whole floor is a separate line item. Luxury vinyl plank handles North Texas humidity swings better than solid hardwood at a lower price.
What Small & Partial Kitchen Remodels Cost in Irving, TX
The lead range for this work in Irving is $14,000 to $45,000, and here’s what pushes a job toward each end.
| Line item | Typical range |
|---|---|
| Small kitchen remodel (full scope, compact footprint) | $9,000 – $20,000 |
| Cabinet installation | $4,000 – $13,000 |
| Countertop installation | $2,000 – $6,500 |
| Backsplash installation | $800 – $2,500 |
| Kitchen island installation | $3,000 – $10,000 |
Five variables move the number most. Size is the obvious one: a 90-square-foot galley and a 180-square-foot kitchen are different jobs. Existing condition matters more than buyers expect. A 1960s South Irving home may need subfloor repair or a new supply line once the wall is open. Relocating plumbing or electrical adds real cost, because it means rough-in, inspection, and drywall repair. Material grade is where you control the spend: stock cabinets and laminate counters versus KraftMaid boxes and Cambria tops can swing the total by $12,000 or more. Permit scope follows from the first four. A cosmetic swap may not need one; anything touching structure, gas, or new circuits does.
Every written estimate from us is line-item and fixed. The number you see is the number you pay, and it doesn’t move because a wall turned out to be stubborn. What it does not include: structural repair discovered behind the wall, appliance purchases, and any work outside the kitchen. We price those separately only if you ask for them.
See the difference
Before
After
Before
After
Before
AfterWhat Irving Homes Specifically Do to This Job
Irving splits into two very different construction realities, and the kitchen in front of you depends on which side of the SH-114 corridor it sits on. South and central Irving, in the 75060 and 75061 ZIP codes, is 1950s to 1970s brick-veneer ranch country. Those kitchens started small and were sometimes expanded by previous owners without a permit. On more than a few remodels we’ve pulled a wall down to find framing that doesn’t match the original plans. That’s a permitting and engineering problem, and it changes the schedule, not just the budget.
North Texas black-clay soil is the other local factor. It swells and shrinks with the wet-dry cycle, and in older South Irving homes that movement shows up as out-of-level floors and cracked slab. If your kitchen floor dips near the exterior wall, we check the foundation before we hang cabinets, because cabinets set on a moving slab will pull away from the wall within a couple of seasons. We also schedule anything dusty or heat-sensitive for early morning, since summer afternoons here push past 100 degrees and most crews are off the site by early afternoon.
On the Las Colinas and Valley Ranch side (75038, 75039), the housing stock is newer but many of those homes sit under HOA rules that govern exterior work, dumpster placement, and sometimes even the color of a visible vent hood. We ask about HOA approval before demo day, not after. If you’re covering Irving, we’re honest about which parts of the job are ours and which belong to a permit office. Call (844) 797-4808 to talk through your specific address.
Serving Irving, TX – Our Local Coverage Area
We serve Irving and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Small & Partial Kitchen Remodels in Irving
Three to six weeks from demo to final walkthrough, with cabinet lead time as the wild card. Built cabinets add two to four weeks before construction even starts, so a four-week kitchen can turn into eight if you order a custom line late. Call (844) 797-4808 and we’ll map out a realistic calendar for your Irving kitchen.
Only if the job moves plumbing, gas, electrical circuits, or structure. A cosmetic refresh (cabinets, counters, backsplash, paint) usually doesn’t trigger one. Anything that does gets a permit pulled and an inspection passed, and we handle both. If you’re unsure, call (844) 797-4808 and we’ll tell you straight.
Yes, and it’s the most common way to keep costs down and the job short. Keeping the sink, range, and refrigerator in place avoids rough-in, inspection, and drywall repair. If your layout already works, we’ll tell you so instead of upselling a move you don’t need. Call (844) 797-4808 for an on-site estimate.
Most land between $14,000 and $45,000, with the swing driven by cabinet grade, countertop material, and whether anything moves. A focused refresh with stock cabinets and laminate can come in near $14,000; a KraftMaid and Cambria job with new lighting and a backsplash runs toward the top. Call (844) 797-4808 for an exact quote, free of charge.
Every partial kitchen we build is covered by the 730-Day Done Right Promise. If something isn’t done right, we make it right, for two full years after the final walkthrough. It’s in writing, and it’s one of the longest workmanship guarantees in residential construction. Call (844) 797-4808 with warranty questions on an existing job too.
Get a Written Estimate for Your Irving Kitchen
If your kitchen needs a focused update rather than a full tear-out, we’ll come to your Irving address, measure the actual space, and hand you a line-item estimate with a fixed number. No pressure to widen the scope. The 730-Day Done Right Promise backs every job, and pricing is upfront with no change orders. Call (844) 797-4808 to schedule your free estimate. A live person answers, day or night.