A Groundwork company - serving Dallas, TX
Walk-In Showers & Shower Remodeling in Irving, TX | Groundwork Construction Co. of Dallas

Walk-In Showers & Shower Remodeling in Irving - Fixed Price, One Bathroom at a Time

Free in-home consult and a written, line-item quote before demo starts. We work one bathroom at a time so your house stays livable, and the signed price is the final price. Licensed, insured, permits handled.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Kitchen remodelingKitchen remodeling
Bathroom remodelingBathroom remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Walk-In Showers & Shower Remodeling in Irving, TX: What to Expect

Walk-In Showers & Shower Remodeling in Irving typically runs $9,000 – $28,000 for a full project, with a straight walk-in installation landing at $4,500 – $12,000 and a tub-to-shower conversion at $3,500 – $10,000. Most jobs take one to three weeks once demolition starts, though a plumbing relocation or a surprise behind the old tile can stretch that. Call (844) 797-4808 and we’ll walk your shower, measure the pan, and put a real number in writing before anyone swings a hammer.

Call (844) 797-4808

From first cut to final seal: how the job actually runs

Every walk-in shower we build follows the same five-stage arc. Timelines below are realistic for a standard Irving install, not a best-case scenario.

Stage 1 – Walkthrough and layout (day 0). We measure the alcove, check the drain location and slope, and confirm whether the existing valve and supply lines can stay. This is where you decide the pan size (60-inch is standard, 48-inch fits a tighter footprint) and the door style. If the shower sits over a slab – which most South Irving ranches do – we check that the drain can be broken out without cutting a beam.

Stage 2 – Demo and rough-in inspection (days 1 – 2). Old tile, backer, and the shower pan come out. The rough plumbing gets exposed, the drain gets re-set, and the valve body goes in at 48 inches on center unless you’ve asked for a different height. We pull the plumbing permit before this stage and the city inspector signs off on the rough-in before any waterproofing goes up. That inspection is not optional, and skipping it is how homeowners end up with a failed final.

Stage 3 – Waterproofing and backer (days 3 – 4). Cement board, then a bonded waterproof membrane, then a flood test on the pan. We let it cure overnight. This is the part nobody sees and the part that determines whether the shower is dry in ten years. You decide here whether you want a built-in bench (adds roughly 8 inches of depth and about $400 – $900) or a niche for shampoo.

Stage 4 – Tile and glass (days 5 – 9). Wall tile goes up, grout cures, then the glass panel or frameless door gets templated and installed. Glass is usually a 5 – 7 business-day lead time from template to install, so if you’re picking a custom enclosure, the schedule is gated on that delivery, not on our crew.

Stage 5 – Final inspection and walkthrough (days 10 – 14). Fixtures, trim, and the drain grate go in. The city does the final inspection, then we walk it with you and document condition on file. Your workmanship is covered by our 730-Day Done Right Promise from that date.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The choices that actually change the outcome

Most of the money and most of the regret sit in four decisions. Here’s the honest version of each.

  • Tile vs. acrylic or solid-surface surround. Tile is the premium look and the most flexible for a custom size, but it requires correct waterproofing or it fails – budget $2,500 – $5,000 in materials alone for a full tile job. Acrylic pans and walls run far less and go in faster, but they show scratches and their lifespan is roughly 15 – 20 years versus 30+ for well-installed porcelain.
  • Frameless glass vs. framed door vs. no door. A frameless enclosure looks best and needs precise templating (custom, $1,200 – $3,000 installed). A framed sliding door costs much less and tolerates a slightly out-of-square opening. A curbless, doorless walk-in works only if the floor can be sloped correctly – usually a slab cut and re-pour, which is a real line item.
  • Fixture grade. A Delta or Moen valve and trim package is the reliable middle; American Standard sits at the value end. This is a $200 – $800 spread on trim and it’s worth spending on the valve body, not the handle.
  • Bench, niche, and storage. Each add is small on its own. Together they can push a $9,000 job toward the middle of the range. Decide before waterproofing – adding them later means starting the pan over.

What Walk-In Showers & Shower Remodeling costs in Irving, TX

The number for a full walk-in shower remodel in Irving is $9,000 – $28,000. Where you land depends on five variables:

Scope Typical range
Walk-in shower installation (standard alcove) $4,500 – $12,000
Tub-to-shower conversion $3,500 – $10,000
Shower replacement (same footprint) $3,000 – $8,500
Full shower remodel with tile and glass $9,000 – $28,000

Size and configuration. A 48-inch shower is cheaper than a 60-inch; a curbless doorless design adds slab work and glass cost.

Existing condition. Water damage, a failed pan, or mold behind the old tile all add demo, framing, and remediation time.

Relocating plumbing or electrical. Moving the drain, valve, or adding a niche light means a slab cut and a permit amendment – usually $1,500 – $4,000.

Material grade. Porcelain vs. natural stone, custom vs. standard glass, and fixture tier all move the number.

Permit scope. A plumbing permit plus two inspections is a fixed cost, but a structural change (moving a wall) adds engineering and a longer review.

A written, line-item estimate includes demo, rough plumbing, waterproofing, tile, fixtures, glass, permits, and cleanup. It typically does not include mold remediation if we find it, structural repairs, or upgraded fixtures you select after signing. We put the number in writing and it doesn’t change unless the scope does – that’s the Upfront pricing, no surprises commitment. Call (844) 797-4808 for an exact quote; the estimate is free.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Irving homes specifically do to this job

Irving is essentially two construction markets stitched together along the SH-114 corridor, and that split lands directly on shower work. In the mid-century core around old downtown, the Hospital District, and South Irving (75060, 75061, 75062), we’re working on 1950s – 1970s brick-veneer ranches where the original shower pan has been tiled over once or twice, and the cast-iron drain is often at the end of its service life. Those homes sit on North Texas black clay, and the wet-dry cycle shows up as slightly out-of-level pan floors – which matters because a walk-in needs a correct slope to drain.

On the Las Colinas, Valley Ranch, and 75063 edge, the housing stock is 1980s – 2000s subdivision product, and the shower failures we see are different: original builder-grade surrounds that have cracked at the corners and let water into the backer. Permitting pace differs too. Commercial construction tied to the airport and Convention Center keeps the city’s inspection queue busy, so final inspections can run a few business days long – we build that into the schedule instead of promising a date we can’t hold.

We handle this work across Irving at both ends of that split, and a shower that’s part of a full Bathroom Remodeling in Irving runs on the same permit and timeline.

Serving Irving, TX – Our Local Coverage Area

We serve Irving and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently asked – Walk-In Showers & Shower Remodeling in Irving

Get a free on-site estimate for your Irving shower

We’ll measure the shower, check the drain and slope, and give you a written, line-item number – no change orders later. A live person answers around the clock, and our technicians are background-checked and arrive in uniform. Call (844) 797-4808 to schedule your free estimate for Walk-In Showers & Shower Remodeling in Irving.

Written by the team at Groundwork Construction Co.

Why Irving Chooses Groundwork Construction Co. of Dallas

We set the standard for walk-in showers & shower remodeling in Irving.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Irving

Getting your walk-in showers & shower remodeling project started is simple.

1

Call or Request a Free Estimate

Tell us about your walk-in showers & shower remodeling project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local walk-in showers & shower remodeling pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Irving Customers Say

Trusted by homeowners across Irving and surrounding areas.

★★★★★

"We lived in the house through the whole thing. He kept the dust wall up, cleaned every Friday, and made sure we always had a working bathroom."

Craig Whitaker
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett

Ready for Walk-In Showers & Shower Remodeling in Irving?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Irving.

(844) 797-4808

Request a Free Estimate in Irving

Tell us about your walk-in showers & shower remodeling needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Local Service Coverage
Call Now - 24/7 Dispatch