Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Tub-to-Shower Conversion in Glenn Heights, TX: What It Costs and How Long It Takes
A tub-to-shower conversion in Glenn Heights runs $3,500 to $10,000 and typically takes 3 to 7 working days once the materials are on site. The job means pulling the old tub and surround, reworking the drain and valve to shower height, waterproofing the wet area, and setting a new pan, walls, and glass. We install every conversion to code and back the work with our 730-Day Done Right Promise. Call (844) 797-4808 to book a free on-site estimate.
Key Takeaways
- Most Glenn Heights conversions land between $3,500 and $10,000 depending on size, tile, and fixture grade.
- Plan on 3 to 7 working days from demo to final walkthrough.
- A licensed plumber and a permit are usually required when the drain or valve moves.
- Prevailing shower valve, liner, and waterproofing standards get inspected before tile goes up.
How Groundwork Handles a Tub-to-Shower Conversion, Stage by Stage
We run every conversion in the same order because skipping a stage is how showers fail five years later. Here’s what actually happens from the day the crew arrives to the day you shower in it.
- Stage 1 – Site protection and demo (day 1, about half a day). We lay floor protection, shut off water, cut the old tub free, and haul it out. The drywall, old surround, valve trim, and any rotten framing come with it. You confirm the rough opening size and shower footprint before we go further.
- Stage 2 – Plumbing and electrical rough-in (days 1 to 2, roughly 6 to 10 hours). The drain gets repositioned to the new pan, the valve is set at shower height, and we add blocking for grab bars if you want them. If the walls come out, a licensed plumber handles the changeover. You decide valve brand, handle style, and whether you want a niche or bench framed in.
- Stage 3 – Inspection and waterproofing (days 2 to 3). Rough-in gets inspected where the permit requires it. Then we build the sloped pan, install the waterproof membrane or a bonded sheet system, and flood-test it before any tile is set. You confirm tile selection and layout around this point, and this is the stage where a bad install gets caught, not later.
- Stage 4 – Tile, pan finish, and trim (days 3 to 6). Walls, floor, and niche get tiled and grouted. We set the showerhead, valve trim, drain cover, and any glass panels. You pick grout color and caulk before we seal.
- Stage 5 – Final walkthrough (day 7). We test the drain, check slope and water flow, and hand you the warranty in writing. Anything off at that point gets corrected on the spot under the 730-Day Done Right Promise.
Closer to a full bath overhaul? That’s part of our Bathroom Remodeling in Glenn Heights scope, and we can quote both at once.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
What You Choose Between Before the First Cut
The decisions that move cost the most happen before demo, not after. Here are the real trade-offs.
- Prefab pan vs. custom tile floor. A prefab acrylic or composite pan is faster, cheaper, and leak-resistant; a tiled pan looks higher-end but depends entirely on proper waterproofing and slope. Tiled pans add time and cost but suit a walk-in layout.
- Acrylic surround vs. porcelain or ceramic tile. Acrylic goes in fast and wipes clean, but it can crack and looks like a hotel bathroom. Porcelain tile holds up and gives you real design range, at a higher material and labor cost.
- Glass: fixed panel vs. framed door vs. no glass. Frameless glass suits a clean look and requires precise framing; a framed door is more forgiving and cheaper; a simple curtain keeps it lowest-cost.
- Shower valve and fixtures. Budget builder-grade brass or plastic-valve kits are functional; mid-range thermostatic valves and metal trim cost more but last longer.
- Niche, bench, and grab bar blocking. Every one adds framing and tile time, but a niche and blocking are cheap insurance you’ll want later.
We use proven setting materials and cement-based products from suppliers like Sakrete and Quikrete on the pan and prep work, which keeps the substrate stable under North Texas conditions.
What Tub-to-Shower Conversion Costs in Glenn Heights, TX
The honest range here is $3,500 to $10,000 for a standard conversion. A few line items push the number up or down:
- Size and layout: a compact 30-inch alcove stays near the low end; a wider walk-in with a bench pushes toward $10,000.
- Plumbing relocation: moving the drain or valve adds labor and usually a permit.
- Material grade: basic acrylic vs. porcelain tile and frameless glass is the biggest single swing.
- Existing condition: hidden rot, old galvanized pipe, or a previously failed pan adds to demo and rebuild.
- Permit scope: a plumbing re-route or structural change needs an inspection; a straight swap may not.
Your written estimate should list demo, disposal, rough-in, waterproofing, tile and setting materials, fixtures, and glass. It should also state whether the permit fee is included and how long the quote holds. A tub-to-shower conversion is Bathroom Remodeling work, and the estimate covers that specific job, not vague allowances. Call (844) 797-4808 for an exact quote; estimates are free.
See the difference
Before
After
Before
After
Before
AfterWhat Glenn Heights Homes Do to This Job
Glenn Heights is a small, fast-growing bedroom city on the IH-35E corridor between Dallas and Waxahachie, and the housing stock is split. You’ve got older rural-style homes on large acreage tracts and newer brick-veneer subdivisions built from the 2000s into the 2020s. On the older homes, the bathroom wall is often framed on a pier-and-beam or older slab, and demo can expose galvanized supply lines, cast-iron drains, or a pan that was never waterproofed properly. In the newer builds, the tub-to-shower conversion tends to be simpler because the plumbing is already PVC and PEX and the framing is straight, but builders sometimes set the drain for a tub footprint that has to be reworked for a shower pan. The blackland prairie clay under the city swells and shrinks with the wet and dry seasons, so slab floors can shift, and we check the pan and drain slope against the actual floor before we set the new base. We handle these across the 75123 ZIP and the surrounding area, so we know the difference between a build on a lot that was farm and ranch land a generation ago and a recent infill tract home. Plans usually need to be checked for setbacks and lot coverage, and if the bathroom touches a plumbing stack, a plumbing permit is required before we open walls. Homeowners often pair this with Tile Roofing in Glenn Heights or Metal Roofing in Glenn Heights when they’re updating the whole house, and we cover the wider area on our Glenn Heights page.
Serving Glenn Heights, TX – Our Local Coverage Area
We serve Glenn Heights and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: Tub-to-Shower Conversion in Glenn Heights
Most take 3 to 7 working days from demo to final walkthrough, with the waterproofing and inspection stage adding a day where the permit applies. A simple acrylic-over-prefab-pan swap can finish in about 3 days; tile and glass push it toward a week. Call (844) 797-4808 to schedule your free estimate.
You need a plumbing permit whenever the drain or valve moves, which is common in a conversion. A straight swap on existing plumbing may not require one, but we confirm with the permitting office first. We pull permits and pass inspection as part of the job.
Yes, in many cases the drain can stay close to its original location and the pan is built around it. That keeps the cost down and shortens the timeline. We confirm feasibility after demo, before committing to the new pan layout.
Expect $3,500 to $10,000 for a standard Glenn Heights conversion, with tile and glass at the higher end and acrylic at the lower. Call (844) 797-4808 for an exact written quote.
Every conversion is covered by our 730-Day Done Right Promise. If the waterproofing, tile, or pan fails within that window, we make it right. That guarantee is in writing, not a verbal promise.
Get a Free Tub-to-Shower Conversion Estimate in Glenn Heights
Call (844) 797-4808 and a live person will answer, day or night, to book your free on-site estimate. We’ll measure the alcove, look at the plumbing, and hand you a written line-item quote for your tub-to-shower conversion in Glenn Heights, usually within a day or two of the visit. No pressure, no vague allowances, just a real number.
Written by the team at Groundwork Construction Co.