Full Bathroom Remodeling in Highland Park, TX: What It Takes and What It Costs
Full bathroom remodeling in Highland Park, TX typically runs $9,000 – $28,000 and takes four to seven weeks of working time, longer if we’re relocating plumbing or opening a wall in a 1920s house. The job means gutting the room to the studs, replacing the wet wall, re-tiling, and setting new fixtures and a vanity. Call (844) 797-4808 for a free on-site estimate on your Highland Park bathroom.
How a Full Bathroom Remodel Runs, Start to Finish
We break the work into five stages. Here’s what actually happens in your house and when you’ll be asked to make a decision.
Stage 1: Site protection and demolition (days 1 – 3)
We seal off the room, lay floor protection on the path to the front door, and demo to the studs: tile, drywall, tub, vanity, toilet, and the old subfloor where it’s soft. A mid-century or older Highland Park bathroom usually hides surprises here – cast-iron drains, knob-and-tube wiring, or a shower pan built with mortar and a lead liner. We photograph everything and flag anything we find before the next stage begins.
Stage 2: Rough-in plumbing and electrical (days 4 – 7)
This is where the biggest cost decisions get made. A straight fixture swap keeps plumbing in place; moving the toilet or tub a few feet means re-running the drain and vent, and that pushes the price toward the top of the range. Electrical gets pulled for GFCI outlets, the vanity lighting plan, and the exhaust fan, which has to vent to the exterior, not the attic. If we’re working in an older home, this is also when we upgrade the supply lines.
Stage 3: Inspection and close-up (days 8 – 12)
Rough-in gets inspected before drywall goes up. We don’t skip this, and we don’t let a homeowner skip it either, because an unpermitted bathroom is a problem when you sell. Walls close up with moisture-resistant board, the drywall gets taped and floated, and the waterproofing membrane goes in the shower and behind the tile.
Stage 4: Tile, fixtures, and finishes (days 13 – 25)
Tile set takes the longest single block. Floor tile, shower wall tile, grout and sealant, then trim and paint. You’ll have chosen your tile, fixture finish, and vanity top months earlier, so this stage is execution, not decisions. Fixtures go in near the end: toilet, sink, faucet, shower valve and trim, mirror, and lighting.
Stage 5: Punch list and walkthrough (final 2 – 3 days)
We test every fixture, check the drain slope, confirm the fan runs and vents, touch up paint, and walk the room with you line by line. Anything on the list gets fixed before we call the job done, and the 730-Day Done Right Promise covers workmanship from there.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Actually Choose Between
Every full bathroom remodel comes down to a handful of decisions. Here’s the honest trade-off on each, so you can walk into your estimate already knowing what you want.
- Tile for the shower and floor: Porcelain is the workhorse – dense, water-resistant, and forgiving of the moisture swings in a North Texas bathroom. Natural stone (travertine, marble) looks richer but needs sealing every year or two and shows water spots. Expect a meaningful jump in both material cost and labor for stone.
- Vanity and countertop: A stock cabinet with a quartz top keeps the budget in check and holds up well. A semi-custom vanity from a line like KraftMaid buys you a better fit for an odd-sized alcove, which older Highland Park bathrooms almost always have. The countertop grade moves the price more than the cabinet.
- Faucet and shower trim: Moen and Delta both make solid mid-grade trim that holds up for a decade or more. Cheap builder-grade fixtures are the most common cause of a callback, so we don’t put them in.
- Tub versus shower footprint: Keeping the tub suits a hall bath a future buyer will expect. A larger shower suits a primary bath. Changing the footprint means moving the drain, which adds cost.
- Toilet: An American Standard or similar comfort-height model is standard. Skip the one-piece designer toilets unless you want to spend the money there.
- Flooring outside the bathroom: If the hall floor gets damaged during demo, budget for a patch or a transition strip, not a whole-floor replacement.
What Full Bathroom Remodeling Costs in Highland Park, TX
Full bathroom remodeling in Highland Park runs $9,000 – $28,000. That range covers a standard hall bath at the low end and a primary bath with a larger footprint, upgraded tile, and relocated plumbing at the high end. Here’s how a written estimate breaks down:
- Demolition, haul-off, and site protection: usually 8 – 12% of the total
- Rough plumbing and electrical, including inspection: 15 – 20%
- Drywall, waterproofing, and tile labor: 25 – 35%
- Fixtures, vanity, tile, and finishes: 25 – 35%
- Permit fees and final inspection: passed through at cost
The four variables that push a job from the low to the high end: the size of the room, the condition behind the walls, whether we’re moving plumbing or structure, and the grade of tile and fixtures you pick. A permit for a simple fixture swap is cheaper than one for a full gut with relocated drains, so scope matters too.
What’s not in the estimate: hidden damage found after demo (a rotted subfloor, a cracked drain line) and anything you add mid-project. We price those in writing before we proceed, never as a surprise on the final invoice. Our no-hassle upfront pricing means the number you see is the number you pay, and projects over $10,000 qualify for $1,000 off plus 0% financing for 18 months.
See the difference
Before
After
Before
After
Before
AfterWhat Highland Park Homes Specifically Do to This Job
Highland Park is a nearly built-out enclave of century-old homes, and almost every project here is a renovation or a rebuild, not new construction. Most of the housing stock dates to the 1910s through the 1930s: Tudor, Colonial, and Mediterranean houses on small, tree-canopied lots, many expanded or rebuilt lot-line to lot-line over the decades. That changes a bathroom job. Old cast-iron and galvanized supply lines are common, so rough-in often means replacing more than expected. Permits go through the Town of Highland Park’s own process, not Dallas codes, and the town’s design review and lot-coverage rules shape what’s allowed when a bathroom project touches structure or exterior walls. Expect a slower approval timeline than a neighboring city and plan around it.
The climate adds its own pressure. Expansive clay soils and foundation movement show up as cracked tile and out-of-square doorways, so we check the floor for slope before we set anything. North Texas heat means moisture management matters on wood-framed walls, and the mature pecan and live oak canopy over narrow streets means material deliveries can require tree-protection plans and coordinated street access. If the bathroom work turns up roof damage from a spring hailstorm, homeowners often pair this with Roof Repair in Highland Park or, for older roofs, Roof Replacement & Installation in Highland Park.
This is a full-gut job, but it’s often part of a larger project. If you’re remodeling more than one bathroom, or the work extends into a hallway or closet, that’s part of a full Bathroom Remodeling in Highland Park scope. Our Bathroom Remodeling service covers the full range, and we handle work throughout Highland Park and the surrounding area, including University Park and nearby neighborhoods.
Serving Highland Park, TX – Our Local Coverage Area
We serve Highland Park and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Full Bathroom Remodeling in Highland Park
A full bathroom remodel in Highland Park takes four to seven weeks of working time, with inspections and permitting adding a week or two on top. Older homes with behind-the-wall surprises run toward the long end. Call (844) 797-4808 and we’ll give you a realistic schedule for your specific bathroom after the on-site estimate.
Yes. A full bathroom remodel in Highland Park requires a permit through the Town of Highland Park, and rough plumbing and electrical get inspected before walls close. We pull the permits and handle the inspections as part of the job; you don’t have to file anything yourself. Call (844) 797-4808 to talk through your project.
Yes, and it’s the most common way to keep a full bathroom remodel in Highland Park near the $9,000 end of the range. Keeping the toilet, tub, and sink in place avoids re-running drains and vents. Moving them a few feet is doable but pushes the price toward $28,000. Call (844) 797-4808 for an exact quote based on your layout.
Full bathroom remodeling in Highland Park costs $9,000 – $28,000 depending on size, condition behind the walls, whether plumbing moves, and your material grade. Hidden damage found after demo is priced separately in writing. Call (844) 797-4808 for a free estimate with a line-item written quote.
Every full bathroom remodel in Highland Park is covered by our 730-Day Done Right Promise: if the workmanship isn’t right, we come back and make it right. That’s one of the longest workmanship guarantees in the residential construction space. Call (844) 797-4808 to schedule your free estimate.
Get a Free On-Site Estimate for Your Highland Park Bathroom
We’ll walk your bathroom, check the plumbing and electrical, and give you a written line-item estimate with a clear scope and timeline. Estimates are free, and a live person answers the phone around the clock. Call (844) 797-4808 to schedule your on-site estimate for full bathroom remodeling in Highland Park.