Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Tub-to-Shower Conversion in Highland Park, TX: What It Costs and How Long It Takes
A tub-to-shower conversion in Highland Park, TX runs $3,500 to $10,000 and takes most homes here 5 to 10 working days from tear-out to final inspection. The job means removing the tub, reframing the wet wall, setting a new waterproofed shower base and drain, hanging tile or a solid-surface surround, and getting the pan inspection signed off by the Town before anything gets covered up. On a 1920s Highland Park Tudor with original cast iron drains, budget toward the high end. Call (844) 797-4808 for a free on-site estimate; the number you see is the number you pay.
How a Tub-to-Shower Conversion Actually Runs, Stage by Stage
An honest sequence matters more than a brochure promise, because most of the surprises on this job happen underground. Here’s the order we work in and what you decide at each step.
Day 1: Demo and what the wall reveals
We pull the tub, cut out the old surround, and open the wet wall to the studs. On Highland Park homes built between 1910 and 1935, that’s where you find out whether the drain is cast iron at the end of its life, whether there’s old galvanized supply pipe, and whether a previous owner tiled straight over drywall with no waterproofing. You decide then and there whether to replace the drain assembly while it’s open. It’s cheap now, expensive later.
Days 2 – 3: Rough plumbing, framing, and the inspection
We relocate the drain to the center of the new shower footprint, set the mixing valve to a safe scald limit, and add blocking for grab bars even if you don’t install them yet. The Town of Highland Park inspects the rough plumbing and the shower pan before tile goes down. This is the stage that stalls projects that skimp on permits, and it typically costs a day of waiting that budget remodelers leave out of their timeline.
Days 3 – 5: Waterproofing and the pan test
We build the sloped pan, apply a bonded waterproofing membrane, and flood-test it. Curb height, pan slope, and the drain bond all get checked before a single tile is set. On a slab or pier-and-beam floor, the pan slope is where a rushed job most often fails early.
Days 5 – 8: Tile, surround, and fixtures
Wall tile, niche, bench if you want one, then the shower valve trim, head, and glass. This is where homeowners make the material call: porcelain vs. natural stone, a tiled pan vs. a pre-formed acrylic pan, and a framed glass door vs. a fixed panel. We set the layout with you before the first box is opened so the pattern lands where you expect.
Days 8 – 10: Final inspection, sealing, and walkthrough
Final inspection, caulk, sealer, glass install, and a walkthrough where we show you the valve stops, the drain cleanout, and where the warranty paperwork lives. Everything we install on this job is covered by the 730-Day Done Right Promise.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Choose Between on a Tub-to-Shower Conversion
- Porcelain tile vs. natural stone. Porcelain is the practical pick: denser, doesn’t stain, holds up to North Texas hard water without annual sealing. Marble and travertine look richer but need sealing every year and show water spotting. Stone adds roughly 20 – 30% to the tile budget.
- Tiled pan vs. pre-formed acrylic base. A tiled pan with a linear drain reads more custom and works on odd footprints. A pre-formed base is faster, drains predictably, and is easier to keep clean. Most Highland Park homes go tiled on the walls and acrylic or a solid-surface base underfoot.
- Framed glass door vs. fixed panel. A door lets you close off steam; a fixed panel is simpler, cheaper, and easier to keep spotless. Both work; the door adds about a day of install.
- Niche and bench placement. A recessed niche costs little and pays back daily. A bench adds framing, waterproofing, and tile, and pushes the job toward the high end.
- Grab bar blocking. We install blocking whether or not you use it now. That way a step-in shower can become fully accessible later without opening the wall.
What a Tub-to-Shower Conversion Costs in Highland Park, TX
The lead range for this job in Highland Park is $3,500 to $10,000, and a mid-grade conversion with tile walls and a tiled pan typically lands around $5,500 to $7,500. Five variables push the number up or down.
| Line item | Typical range in Highland Park |
|---|---|
| Basic acrylic surround, pre-formed base | $3,500 – $5,500 |
| Porcelain tile walls, tiled pan | $5,500 – $8,000 |
| Natural stone and custom glass | $8,000 – $10,000 |
| Drain and supply plumbing replacement (if required) | $900 – $2,400 |
| Frameless glass door | $800 – $2,200 |
What moves the number: (1) original plumbing condition, since 1920s drain and supply lines often need replacement once exposed; (2) footprint size and whether we extend into a former tub alcove or widening the opening is needed; (3) material grade, tiled pan vs. acrylic and porcelain vs. stone; (4) permit scope if you fold the conversion into a full Bathroom Remodeling in Highland Park; (5) structural changes, like moving a wall or reconfiguring the closet. A written estimate should itemize each of these, not lump them into one number. It typically isn’t covered: hidden rot or subfloor damage discovered after demo, which we document with photos before any change order. No change order happens without your approval in writing.
See the difference
Before
After
Before
After
Before
AfterWhat Highland Park Homes Do to This Job
Highland Park is a nearly built-out enclave of century-old homes, so almost every conversion is a renovation inside a 1910s – 1930s Tudor, Colonial, or Mediterranean frame, not new construction. That shows up on the job in specific ways. Original cast iron drains are past their service life and worth replacing while the wall is open. The town has its own permitting, design review, and lot-coverage rules rather than Dallas codes, so plan around a slower approval path than a neighboring city would need. Tight tree-canopied lots on streets like Euclid and Lakeside mean deliveries and debris haul-outs have to be scheduled, and the summer heat demands careful moisture control on any wood-framed wet wall before waterproofing goes down. The clay soils underneath drive foundation movement over time, and a shower pan that’s out of level will puddle before its fifth year. We pull the permits, we pass the inspections, and we don’t hand you the job back until it drains like it should.
Serving Highland Park, TX – Our Local Coverage Area
We serve Highland Park and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Tub-to-Shower Conversion in Highland Park
Most conversions take 5 to 10 working days. The extra time compared to a bare demo-and-tile job is the Town’s rough plumbing and pan inspection, which we schedule deliberately rather than skip. Call (844) 797-4808 to get a timeline for your specific bathroom.
Yes. A conversion involves moving the drain and reworking supply plumbing, which requires a plumbing permit and inspection under the Town’s own review process. We pull the permits and pass the inspections as part of the project, and the written estimate lists them separately.
Often yes. If the existing drain can be re-centered within the old tub footprint, we keep the rough plumbing as-is and save both money and a day of inspection time. We open the wall first and confirm before committing to a final number.
The range is $3,500 to $10,000, with most homes landing between $5,500 and $7,500 for porcelain walls and a tiled pan. Drain and supply replacement and glass door choice are the two biggest swing factors. Call (844) 797-4808 for an exact quote; estimates are free.
The 730-Day Done Right Promise covers workmanship on the conversion, including the waterproofing and pan. If it isn’t done right, we make it right. Our technicians arrive background-checked and in uniform, and calls are answered by a live person 24/7.
Get a Free Estimate on Your Highland Park Tub-to-Shower Conversion
We’ll visit your Highland Park home, open up the wall enough to see what we’re working with, and hand you a written line-item estimate with materials, permits, and labor spelled out. No pressure, no vague lump sum. If the conversion is part of a wider project, we can quote our Bathroom Remodeling service at the same visit. Homeowners across Highland Park trust us to pull the permits and finish the job. For homes that also need exterior work, homeowners often pair this with Metal Roofing in Highland Park or Tile Roofing in Highland Park. Call (844) 797-4808 to schedule your free estimate.
Written by the team at Groundwork Construction Co.