Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Tub-to-Shower Conversion in Dallas, TX: What It Actually Involves
A tub-to-shower conversion in Dallas typically runs $3,500 to $10,000 and takes 5 to 10 working days from demo to final walkthrough. We pull the tub, rework the drain and valve wall, waterproof and tile the new shower, and set the glass. Most Dallas jobs land in the $4,500 to $8,500 range once you account for the clay-soil plumbing quirks and the tile grade you choose. Call (844) 797-4808 for a free on-site estimate, and we’ll put a written line-item number in your hands before anything gets touched.
How a Tub-to-Shower Conversion Actually Runs, Stage by Stage
Every job follows the same sequence. The timing shifts with tile choice, glass lead times, and what we find behind the wall, but the order never changes.
Stage 1 – Site review and demo (day 1). We protect the floor and hallway, shut the water, and pull the tub, surround, and valve trim. If the existing tub is cast iron, it comes out in pieces; if it’s a lighter acrylic unit, it comes out whole. You’ll see the studs and drain stub by end of day. This is also when we confirm the drain location and whether the existing valve is worth keeping.
Stage 2 – Rough-in and framing (days 1 to 2). This is where your first decision lands: keep the drain where it is or move it. If the drain sits toward the tub apron and you’re converting to a curbless or low-curb shower, we usually relocate it to center the shower pan. That’s a real cost jump because it means cutting the slab. We also set the valve body, add blocking for grab bars and glass hinges, and reframe the backer if the studs are out of plumb (common in 1950s ranch stock).
Stage 3 – Waterproofing and inspection (days 2 to 4). Cement backer board, then a bonded waterproof membrane over the whole wet area, then a flood test on the pan. We schedule the plumbing rough-in inspection here, and the flood test is a fixed 24-hour hold. No shortcuts and no same-day pour on this part.
Stage 4 – Tile and finish (days 4 to 7). This is where homeowners often reshape the budget. Large-format tile on the walls, a mosaic or penny-tile pan floor for grip, and a niche or two. We set, grout, and seal. Glass templating happens after tile is fully cured, so add 3 to 7 calendar days for tempered glass to be fabricated and installed.
Stage 5 – Trim, glass, and walkthrough (days 7 to 10). Fixture install, caulk, final inspection sign-off, and a hands-on walkthrough where we show you the dry-off routine for the pan and the caulk-maintenance schedule. Your warranty paperwork is handed over the same day.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices That Actually Shape Your New Shower
Most of the money and every one of the visual decisions live in these categories. We’ll walk you through the samples in person so you’re not guessing from a screen.
- Shower pan style: Raised curb, low curb, or curbless. A curbless pan needs the drain relocated and the slab or subfloor stepped down, which is where the price climb starts. Curbed is the workhorse for most Dallas slabs and holds water best in a wet-dry climate.
- Wall tile: Porcelain or ceramic is the practical default. Large-format 12×24 porcelain sets cost-efficient and reads modern; hand-glazed or marble-look tile pushes the number up but weighs nothing extra on the wall. Marble and natural stone need sealing every couple of years.
- Pan floor tile: Small mosaics (2×2 or penny) deliver the grip you want. Large tile on a shower floor is a slip hazard and we’ll flag it.
- Valve and trim: A Moen or Delta thermostatic valve with a pressure-balance trim is the sweet spot, especially in Dallas where summer mains temps swing. A basic rebuild kit is cheaper but you’ll be servicing it more often.
- Glass: Framed vs. frameless. Frameless looks best and costs more; framed lasts longer with less adjustment. Both are tempered and both hinge on wall blocking that we installed at Stage 2.
- Fixtures: A handheld on a slide bar plus a standard showerhead is the flexible setup for aging-in-place and for families. American Standard and Delta both make solid pressure-balance valves in the mid tier.
What Tub-to-Shower Conversion Costs in Dallas, TX
Most Dallas conversions land between $3,500 and $10,000, with the sweet spot around $4,500 to $8,500. Anything above that usually involves moving the drain, a curbless pan, or premium tile and frameless glass.
| Line item | Typical range |
|---|---|
| Demo, haul-away, and disposal | $300 – $600 |
| Plumbing rough-in and valve | $500 – $1,400 |
| Drain relocation (slab cut) | $900 – $2,200 |
| Waterproofing and pan build | $500 – $1,100 |
| Tile installation (walls and pan) | $1,200 – $3,200 |
| Glass and hardware | $600 – $1,800 |
| Trim, fixtures, permits, inspections | $400 – $900 |
The five variables that push you toward the high end of that table:
- Drain relocation. Keeping the existing drain in place is the single biggest cost saver on a Dallas conversion. Moving it means slab demolition and a plumbing re-test.
- Wall and structure. If the existing tile is set on metal lath over framed walls, we remove and rebuild the backer. If the framing is out of plumb, that adds labor.
- Tile grade. Basic porcelain vs. natural stone can swing the job $1,500 to $2,000 on the same footprint.
- Glass configuration. Framed vs. frameless, and whether the opening needs a fixed panel plus door.
- Permit and inspection scope. Dallas requires a permit for the plumbing and, in most cases, the electrical work if we move a light or add a fan. That’s a real cost, not a rounding error.
Every written estimate is line-item and fixed. No change orders unless you approve a scope change in writing. The 730-Day Done Right Promise covers workmanship for the full term, and the whole job is backed by our upfront pricing guarantee.
See the difference
Before
After
Before
After
Before
AfterWhat Dallas Homes Specifically Do to This Job
Dallas sits in the clay-soil Blackland Prairie, and that fact changes the plumbing under your tub more than any other single thing. On slab-on-grade homes across Oak Cliff, East Dallas, and the 1950s-70s ranch tracts in far North Dallas and Lake Highlands, we regularly find tub drains that have shifted with soil movement over decades. Sometimes the drain line is slightly off-pitch, sometimes the floor under a cast-iron tub has a dip. We can’t see it until demo. When we do, the fix is real money (see the drain relocation row above) but it’s the difference between a shower that drains right and one that pools.
Dallas permitting runs through the Development Services Department. Tub-to-shower conversions typically need a plumbing permit for the drain and valve work and an electrical permit if we add a fan or light in the shower zone. Inspections happen at rough and final, and we schedule those for you. If you’re inside a neighborhood with a homeowner association, send us the HOA design guidelines before you pick tile. Some Dallas HOAs restrict frameless glass on outward-facing privacy walls, and it’s cheaper to know that at the start than after fabrication.
And the summer heat: our typical shower builds use a quality exhaust fan sized to the ceiling height, because Dallas humid summers plus a tiled shower enclosure equals mold if the fan is undersized. We do this on every conversion.
Serving Dallas, TX – Our Local Coverage Area
We serve Dallas and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Tub-to-Shower Conversion in Dallas
Five to ten working days for most Dallas jobs, with the calendar time stretching to about two weeks once tempered glass fabrication is factored in. Tile choice, drain relocation, and permit scheduling move that window. Finishes like natural stone add a day or two of sealing. Call (844) 797-4808 for a realistic schedule tied to your specific bathroom.
Yes, in most cases you’ll need a plumbing permit for the drain and valve work, plus an electrical permit if the shower adds a fan or light. We pull permits through the City of Dallas and handle the inspections. That’s part of why a written estimate from us lists permit costs as a line item rather than burying them.
Often, yes. If the existing drain sits in a position that works for the new shower and the wall behind the tub is solid, we can build a fully waterproofed shower on the existing rough-in. That’s the most economical path and by far the most common. Call us to walk through what your specific layout supports before you commit.
Most Dallas conversions run $3,500 to $10,000, with a typical job in the $4,500 to $8,500 range. Our written estimate is fixed pricing. During demo we may find hidden conditions (shifted drain, rotted framing, missing backer) that were physically impossible to see. If so, we stop, show you the problem, and get written approval before adding cost. No surprise invoices.
Every conversion is covered by our 730-Day Done Right Promise – if it’s not done right, we make it right, for two full years on workmanship. That’s one of the longest workmanship guarantees in residential construction. Manufacturer warranties on Moen or Delta valves and American Standard fixtures flow to you as well. Call (844) 797-4808 to schedule an estimate and get the warranty terms in writing.
Ready for a Real Number on Your Dallas Tub-to-Shower Conversion?
Call (844) 797-4808 for a free on-site estimate in Dallas, TX. We’ll look at your current tub, check the drain and valve, flag anything the demo might reveal, and put a line-item written number in your hands – no vague “starting at” pricing and no change orders you didn’t approve. A live person answers the phone day or night, and technicians arrive background-checked and in uniform. If the conversion is part of a bigger bathroom update, see our Bathroom Remodeling in Dallas page for the full scope. We also serve the surrounding Dallas neighborhoods and nearby Highland Park and University Park, and homeowners often pair this work with Metal Roofing in Dallas when hail season rolls around. If you’re planning a wider update, check our Bathroom Remodeling service and consider Tile Roofing in Dallas for exterior durability. The number you see on our written estimate is the number you pay.
Written by the team at Groundwork Construction Co.