Vanities, Tile & Fixtures in Irving, TX: What the Job Actually Involves
Replacing a vanity, retiling a bathroom floor or shower surround, and swapping fixtures in Irving typically runs $9,000 to $28,000 for the full package, and most of that work happens over five to eight working days once materials are on site. A vanity-only swap is quicker and cheaper. The number depends on how much tile comes out, whether plumbing or electrical moves, and what you pick at the showroom. Call (844) 797-4808 and we’ll walk your actual bathroom before we quote a range.
How We Run a Vanities, Tile & Fixtures Job, Stage By Stage
Bathroom tile and fixture work has a sequence, and skipping a step is how you get a grout line that cracks in eighteen months. Here’s how the days actually break down when we’re working in an Irving home.
Stage 1: Site walk and written scope (day 1, about 90 minutes)
We measure the room, photograph the existing conditions, and check what’s behind the vanity and under the tile. That’s when we find the surprises: a shutoff valve that won’t close, a wax ring that’s been leaking quietly, subfloor that’s soft under the vinyl. You get a line-item written quote with the range broken out by vanity, tile, and fixtures, not one lump number. You’ll also get the schedule at this visit so you know which days you lose the bathroom.
Stage 2: Demo and substrate prep (days 1 – 2)
Out comes the old vanity, the toilet (we reset it at the end on a new seal), the tile, and the old cement board or, on older Irving homes, whatever’s underneath. This is the messy, dusty part. We protect the floor path and use dust containment because a bathroom sits in the middle of a hallway in most of these houses. If the subfloor is compromised, you’ll get a call before we go further, with a price for the repair. No surprise change orders.
Stage 3: Rough-in and inspection (day 2 – 3)
If the drain or supply lines need to move for a new vanity footprint, or a GFCI outlet needs relocating, that happens now and gets inspected before anything closes up. This is the stage where the job slows down if it’s going to. You decide the vanity placement here if you haven’t already, because moving a drain three days from now costs a lot more than moving it today.
Stage 4: Tile and setting (days 3 – 5)
Waterproofing membrane goes on first, then tile. A shower surround with large-format tile is a slower set than a simple backsplash; a herringbone floor layout adds a day. Grout and sealant cure before the fixtures go back. You’ll pick grout color at stage 1, not stage 4, because it’s a decision people regret making in a hurry.
Stage 5: Vanity, fixtures, and final walk (days 5 – 7)
Vanity sets, top goes on, faucet and drain connect, toilet resets, mirror and accessories hang. We run water, check for leaks under load, and walk the job with you. Any punch items get written down and scheduled. That final walk is where the 730-Day Done Right Promise starts, and it’s in writing.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Actually Choose Between
The spec sheet is where the price splits. These are the real forks in the road for a vanity, tile, and fixture job in Irving:
- Vanity construction: A stock cabinet-base vanity from a big-box store is cheapest and fine for a guest bath; a semi-custom or custom vanity built to fit the room’s odd dimensions lasts longer and looks intentional. Solid wood or plywood boxes outlast particleboard in a humid bathroom every time.
- Vanity top material: Cultured marble is budget-friendly and forgiving; quartz and granite hold up to daily use and won’t stain like natural stone can. A Kohler or American Standard integrated top is a nice middle ground for a clean, low-maintenance look.
- Tile material: Porcelain is the workhorse – dense, water-resistant, and priced reasonably. Natural stone (travertine, marble) looks beautiful but needs sealing and shows every water spot. Ceramic is the budget pick for walls and light-traffic floors.
- Tile size and layout: Large-format tile (12×24 and up) means fewer grout lines and easier cleaning, but needs a flatter substrate. Small mosaic is more forgiving over an uneven floor and grips better underfoot in a shower.
- Fixtures and finish: A Moen or Delta faucet in brushed nickel or matte black is the reliable, serviceable choice. Cheap faucets fail at the cartridge first; paying for a brand with replacement parts available locally saves a headache down the road.
- Shower valve and trim: Keep the existing valve to save money, or upgrade to a pressure-balance or thermostatic valve for better temperature control. That’s a plumbing decision made at rough-in, not after tile.
What Vanities, Tile & Fixtures Costs in Irving, TX
Expect $9,000 to $28,000 for a full vanity, tile, and fixture package in an Irving bathroom, with most jobs landing in the middle of that range. Here’s how the line items typically break out:
- Bathroom vanity installation: $800 – $3,000
- Tile floor and shower surround (material and labor): $2,500 – $8,000 depending on square footage and tile grade
- Fixture package (faucet, shower trim, toilet, accessories): $600 – $2,500
- Rough-in plumbing and electrical moves: $500 – $2,500 when relocation is needed
- Subfloor or wall repair: $400 – $1,800 if rot or old damage shows up
What pushes a job to the low end: a straight vanity swap in the same footprint, porcelain tile over a sound substrate, and fixtures you supply. What pushes it high: relocating the drain or supply lines, natural stone tile, a custom-built vanity for an odd wall, or discovering water damage behind the old surround. Every written estimate lists what’s included. What isn’t included gets spelled out separately, not buried. Upfront pricing, no surprises, and 0% financing for 18 months is available if you want to spread the cost.
See the difference
Before
After
Before
After
Before
AfterWhat Irving Homes Specifically Do to This Job
Irving is two construction markets stitched together, and it shows up in the tile and vanity work. In the older core around South Irving and the Hospital District (75060 and 75061), we’re usually working on 1950s to 1970s brick ranches where the bathroom has been through a couple of decades of small fixes. That’s where we find soft subfloor from a slow leak, or a vanity that was cut to fit a wall that isn’t square. Out toward Las Colinas and the DFW corridor (75038 and 75039), we see 1980s to 2000s subdivision bathrooms and mid-rise multifamily units that need commercial-grade tile and a tighter schedule. North Texas black-clay soils move with the wet-dry cycle, so we check for floor deflection before we set any tile; a slab that’s shifted means a self-leveling compound step, which we price at the walk. Permits for a vanity and tile job usually aren’t required unless plumbing or electrical lines move, and we handle that filing when it applies. If your project grows into a full renovation, that’s a different scope covered on our Bathroom Remodeling in Irving page, and we can fold the tile package into Bathroom Remodeling as the whole plan comes together. We serve homeowners across Irving, including the neighborhoods around 75061, 75015 and 75016.
Serving Irving, TX – Our Local Coverage Area
We serve Irving and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Vanities, Tile & Fixtures in Irving
Most jobs run five to eight working days once materials arrive, with demo and prep on days one and two, tile set mid-week, and vanity and fixtures at the end. Material lead time is often the real wait; a custom vanity or special-order tile can add two to four weeks before day one. Call (844) 797-4808 and we’ll give you a realistic calendar after the site walk.
Usually no for a straight swap of vanity, tile, and fixtures in the same location, but yes if you move plumbing drains or supply lines, relocate electrical, or change the structural layout. We tell you at the walk which side of that line your job falls on and pull the permit when it’s needed. Call (844) 797-4808 with your address and we’ll tell you what applies.
Yes, and that’s the cheapest, fastest version: new vanity in the existing footprint, new tile over a repaired substrate, and new fixtures on existing rough-ins. Staying put saves the rough-in and inspection cost and shaves several days off the schedule. Call (844) 797-4808 to talk through what’s possible without moving walls.
The full package runs $9,000 to $28,000, and a vanity-only swap comes in far lower at $800 to $3,000. Tile grade, fixture brand, and whether anything moves are the three biggest cost drivers, and water damage found during demo is the wildcard. Call (844) 797-4808 for an exact quote; estimates are free.
Every vanities, tile & fixtures job we do is covered by our 730-Day Done Right Promise, one of the longest workmanship guarantees in residential construction: if it’s not done right, we make it right. Calls are answered by a live person 24/7, and our background-checked, uniformed technicians show up on the day we said. Call (844) 797-4808 to schedule your free estimate.
Get a Free Estimate for Vanities, Tile & Fixtures in Irving
Vanities, tile and fixtures is a job best priced in person, because the room decides the number. Call (844) 797-4808 and a live person will set a free on-site estimate at your Irving home, measure the bathroom, and hand you a written line-item quote with the ranges broken out by vanity, tile, and fixtures. No voicemail, no waiting until Monday. If the tile work leads you to other projects, homeowners often pair this with Tile Roofing in Irving or Specialty Roofing in Irving, and we’ll quote those at the same walk. One crew, one schedule, fixed pricing.
Written by the team at Groundwork Construction Co. of Dallas.