Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Tub-to-Shower Conversion in Carrollton, TX: What It Costs and How Long It Takes
A tub-to-shower conversion in Carrollton typically runs $3,500 to $10,000 and takes 3 to 7 working days from demo to final walkthrough, depending on whether we’re keeping the drain where it sits or relocating it. The job means pulling the old tub and surround, rebuilding the wet-wall substrate, waterproofing, setting a new pan and drain, tiling, and resetting fixtures. Most Carrollton conversions come in around $6,000. Call (844) 797-4808 for a free on-site estimate before you commit to anything.
How a Tub-to-Shower Conversion Actually Runs, Stage by Stage
We don’t hand you a brochure and disappear. Here’s the real sequence, what happens when, and where your decisions land.
Stage 1: Measure, review, and lock the plan (1 visit, before work starts)
We measure the alcove, check the drain location, look at what’s behind the tub wall, and confirm the shower footprint you want. This is when you pick pan size (30×60 is the standard tub-replacement footprint; 36×60 buys more elbow room), tile vs. solid-surface walls, and the door or curtain setup. HOA paperwork gets flagged here, not later, if your community requires an architectural review.
Stage 2: Demo and condition check (day 1)
The tub, surround, and valve trim come out. Old drywall and any failing backer board come down. If we find original cast-iron drain lines, polybutylene supply lines, or aluminum branch wiring behind the wall, this is where it surfaces, and it’s the single most common reason a Carrollton conversion turns into a two-part job. You see it before we proceed, in writing.
Stage 3: Rough-in and inspection (days 1 to 2)
Plumbing gets relocated if needed, the shower valve gets set, and the drain gets tied in. If the scope requires a permit, rough-in inspection happens before anything gets closed up. Nothing is covered until it passes.
Stage 4: Waterproofing and tile (days 2 to 5)
Cement backer board or a bonded waterproof membrane goes up, seams get taped and sealed, and the pan gets built or set. Then tile, grout, and sealant, or a solid-surface panel system if that’s what you chose. This is the longest phase and the one where shortcuts show up years later, so we don’t take them.
Stage 5: Fixtures, glass, and walkthrough (days 5 to 7)
Valve trim, showerhead, door or curtain rod, and any niche or bench get finished. We test the drain, check for leaks, and walk the job with you. Anything on the punch list gets fixed before we call it done. Every conversion carries our 730-Day Done Right Promise.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices That Shape Your Tub-to-Shower Conversion
Most of the money and most of the long-term satisfaction live in four decisions. Here’s the honest trade-off on each.
- Wall material: tile vs. solid surface. Tile (porcelain or ceramic, $4 – $12/sq ft installed in most grades) gives you the widest design range and holds value well. Solid-surface panels cost less installed and clean up faster, but they read more utilitarian. For a Carrollton home you plan to keep, tile usually wins.
- Pan: pre-formed vs. custom mud-set. A pre-formed acrylic or fiberglass pan is fast and predictable. A mud-set tile pan costs more but lets you match the footprint exactly and lasts longer when the slab is stable.
- Door: framed vs. frameless glass vs. curtain. Frameless glass looks best and costs the most; a framed slider is the practical middle; a curtain is the budget path. If quiet operation matters for an HOA or a shared wall, a quality framed slider with soft-close rollers is worth the upgrade.
- Drain and valve: keep vs. relocate. Keeping the existing drain location and valve body is the biggest cost saver on this job. Moving either adds plumbing and possibly a permit line item.
And on the material side, we work with suppliers like Sakrete and Quikrete for the mud-bed and setting materials, and we specify shower valves and trim from Kohler where the budget allows. You pick from a curated set of verified brand partners, not whatever’s on the shelf.
What Tub-to-Shower Conversion Costs in Carrollton, TX
Expect $3,500 to $10,000 for a tub-to-shower conversion in Carrollton. Here’s how the line items break down.
| Scope | Typical range |
|---|---|
| Basic conversion, existing drain kept, tile walls, framed door | $3,500 – $5,500 |
| Mid-grade conversion with solid-surface or premium tile, relocated valve | $5,500 – $7,500 |
| High-end conversion with frameless glass, custom pan, niche or bench | $7,500 – $10,000 |
| Plumbing relocation or hidden-condition repair (cast iron, polybutylene, aluminum wiring) | Added to any tier above |
What moves you from the low end to the high end: the size of the shower footprint, the condition behind the tub wall, whether plumbing or electrical has to move, the grade of tile and glass, and whether the scope triggers a permit. A written estimate from us spells out each of those lines with a fixed price, so the number you see is the number you pay. Our $1,000 off projects over $10,000 applies, and 0% financing for 18 months is available if you’re bundling this with a larger bath update.
See the difference
Before
After
Before
After
Before
AfterWhat Carrollton Homes Specifically Do to This Job
Carrollton’s older subdivisions, especially around the 75006 and 75007 ZIP codes, were built in the 1970s and 80s as brick-veneer ranches and traditional two-stories on small lots. In neighborhoods off Josey Lane and Belt Line Road, we regularly pull a tub and find original cast-iron drain lines, polybutylene supply lines, and aluminum branch wiring behind the wall. Those items have to be addressed before the job can close out, and it’s why a “simple” conversion sometimes turns into a two-week job. The good news: we flag it in writing before we proceed, and the 730-Day Done Right Promise covers the workmanship on both halves. Many of these communities also have active deed restrictions or an HOA, and the architectural review committee usually wants to see the door style and finish before a replacement gets approved, so we get that paperwork started early rather than after the tile is up. If you’re pairing this with exterior work, some Carrollton homeowners pair this with Metal Roofing in Carrollton or Tile Roofing in Carrollton; the same HOA review applies there too. For a broader project, see our Bathroom Remodeling in Carrollton page, or browse Bathroom Remodeling as a starting point. We cover Carrollton and the surrounding area.
Serving Carrollton, TX – Our Local Coverage Area
We serve Carrollton and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Tub-to-Shower Conversion in Carrollton
Three to seven working days for a straightforward conversion with no hidden conditions. If plumbing or electrical has to be relocated, or if we find the cast-iron or polybutylene issues common in older Carrollton homes, add another three to five days. You’ll get a written schedule before demo starts. Call (844) 797-4808 for a precise timeline on your bathroom.
Usually yes, if you’re relocating the drain, changing the valve, or altering plumbing inside the wall. A simple swap keeping the existing drain and valve can sometimes proceed without one, but the safe answer is to confirm with the city before demo. We pull the permits on our jobs and stand behind the inspections. Call (844) 797-4808 and we’ll tell you what your specific scope requires.
In most cases, yes. If the existing drain location works with a standard 30×60 or 36×60 shower pan, and the wall framing is sound, we can convert without touching plumbing or structure. That’s the least expensive path and it’s the majority of what we do. Call (844) 797-4808 to schedule an estimate and we’ll confirm what your layout allows.
Between $3,500 and $10,000 depending on scope, with most jobs landing near $6,000. The variables are footprint size, the condition behind the wall, plumbing relocation, material grade, and whether a permit is required. Call (844) 797-4808 for an exact quote – estimates are free and there’s no obligation.
Every tub-to-shower conversion we do is backed by our 730-Day Done Right Promise. If something isn’t right, we come back and make it right. That’s in writing, and it covers the workmanship, not just the materials. Call (844) 797-4808 with any warranty question before you sign anything.
Get a Free Tub-to-Shower Conversion Estimate in Carrollton
We’ll schedule a free on-site estimate at your convenience, measure the alcove, inspect what’s behind the tub wall, and hand you a written line-item quote with a fixed price and a realistic schedule. Calls are answered by a live person 24/7, so you won’t land in a voicemail. Call (844) 797-4808 to get started.
Written by the team at Groundwork Construction Co.