Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Tub-to-Shower Conversion in Coppell, TX: What It Costs and How Long It Takes
A tub-to-shower conversion in Coppell typically runs $3,500 to $10,000 and takes three to six working days from demolition to final caulk, depending on whether the drain and valve move. Most jobs stay under a week because the footprint already exists. If you’re weighing a curbless walk-in, a bench, or a simple alcove swap, call us at (844) 797-4808 and we’ll put a real number on your Coppell bathroom before anyone touches a tile.
How a Tub-to-Shower Conversion Actually Runs, Day by Day
This is the part most bids skip. A conversion isn’t a remodel with the tub yanked out; it’s a sequenced trade job where each stage depends on the last one passing. Here’s how we run it in Coppell.
Stage 1: Site check and protection (half a day)
We walk the bathroom, confirm the drain rough-in location and valve wall, check for water damage around the existing tub flange, and protect the flooring and hallway. You decide the shower size and layout at this stage, because anything that moves the drain adds plumbing work on day two.
Stage 2: Demo and inspection of what’s behind the wall (one day)
Out goes the tub, surround, and any drywall behind it. We open the valve wall and check for the two failures that drive up budgets: rotted subfloor near the drain and old galvanized supply lines. You’ll see photos before we go further, and any change to the written quote gets approved in writing, not discovered at final billing.
Stage 3: Rough-in plumbing and backing (one to two days)
If the drain stays put, this is quick. If you’re moving to a curbless or larger footprint, we relocate the drain and set the slope for the pan. We install blocking for grab bars and a bench, and the pan gets built with a pre-sloped waterproof membrane so water never sits against the framing. A city inspection happens here if the scope requires one.
Stage 4: Waterproofing and tile (two days)
Cement board goes up, then a liquid or sheet waterproofing layer over the entire wet area. We set tile on the walls and the pan, grout, and seal. This is the longest single stage, and it’s where the honesty of the work shows up years later, not on install day.
Stage 5: Fixtures, glass, and walkthrough (one day)
Valve trim, showerhead, drain cover, and the glass door or panel go in. We run the water, check the pan holds, caulk the seams, and walk you through the finished shower. Most Coppell jobs finish inside a single week, and the whole thing is backed by our 730-Day Done Right Promise – if it’s not done right, we make it right.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Real Choices You’ll Make: Materials, Grade, and Layout
Most of the price swing on a tub-to-shower conversion comes from three decisions. Here’s the honest trade-off on each, not the sales version.
- Acrylic or fiberglass pan and walls: The lowest-cost path, often $3,500 – $5,500 installed. Holds up well, cleans easily, but feels like a hotel shower and offers fewer tile choices. Good fit for a hall bath or a rental-grade finish.
- Tile and mud-set or membrane pan: Adds $2,000 – $4,000 over acrylic, but you get a real custom shower with a bench, niche, and tile that ties into the rest of the bathroom. Expect 15 – 25 years of service with proper waterproofing. This is what most Coppell homeowners in Old Town and the Coppell ISD neighborhoods choose for a primary bath.
- Frameless glass enclosure: A fixed glass panel rather than a swinging door often costs less and gives a clean, curbless look. Half-inch glass is heavier and sturdier; three-eighths is lighter and more affordable.
- Curbless vs. curbed entry: Curbless looks great and ages well for accessibility, but it means moving the drain and reworking the subfloor, adding plumbing cost. A low curb is simpler and cheaper.
- Tile size and format: Large-format porcelain (24×24 or larger) means fewer grout lines and easier cleaning, but it requires a flatter substrate and tighter tolerances, which can push labor up. Classic subway tile is forgiving and keeps labor down.
What a Tub-to-Shower Conversion Costs in Coppell, TX
The honest range is $3,500 to $10,000, and where you land depends on how much of the existing bathroom we keep and how far the plumbing moves. Here’s how the number breaks down:
| Line item | Typical range |
|---|---|
| Acrylic pan and surround conversion | $3,500 – $5,500 |
| Tile shower with membrane pan, curbed entry | $6,000 – $8,500 |
| Tile shower, curbless, moving the drain | $7,500 – $10,000 |
| Frameless glass door or panel | $600 – $1,800 |
| Bench, niche, or grab bar blocking | $300 – $900 |
| Relocating the valve to a new wall | $800 – $2,200 |
Five variables push a job toward the high end: footprint change (a bigger shower than the tub footprint means moving the drain and subfloor work), existing condition (rotted subfloor or old galvanized supply lines), plumbing relocation, material grade (large-format porcelain and mud-set pans cost more in labor than acrylic), and permit scope. Your written estimate lists what’s included and what isn’t: demo, waterproofing, tile, fixtures, glass, and disposal are in; a full valve cartridge replacement may be separate if the existing valve is sound, and moving an electrical line for a new light is a separate line item.
See the difference
Before
After
Before
After
Before
AfterWhat Coppell Homes Specifically Do to This Job
Coppell’s housing stock runs mostly 1980s-to-2000s brick traditional and transitional homes, and the housing around Old Town and the Coppell ISD schools is where we see the most conversions. Two things complicate a straightforward job here. First, the blackland clay soil and hot, dry summers mean cyclical foundation movement, so slab-on-grade foundations are standard and plumbing connections flex. When we cut into a slab to relocate a drain, we account for that movement with proper bedding and flexible connections, or the drain will crack a few summers from now. Second, the design scrutiny is real: in Old Town and in the neighborhoods with HOA architectural review boards, an exterior change like a bathroom window or vent is reviewed, and interior work that touches structure can trigger a city inspection that has to be scheduled and passed. We pull the permits where the scope requires them and coordinate with the review process so a Coppell bathroom conversion doesn’t stall.
If the wider project includes replacing the floors or upgrading the vanity, that runs into the full Bathroom Remodeling in Coppell scope, and we’ll tell you honestly when a straight conversion is the better spend. Homeowners often pair bathroom work with exterior projects, and we also handle Metal Roofing in Coppell and Tile Roofing in Coppell if the house is due for one.
Serving Coppell, TX – Our Local Coverage Area
We serve Coppell and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: Tub-to-Shower Conversion in Coppell
Most Coppell conversions run three to six working days from demo to final caulk. A straight acrylic swap can finish in three; a curbless tile shower with a moved drain takes five to six because of the plumbing, waterproofing, and inspection stages. If we hit a rotted subfloor behind the tub, add a day for repair, and you’ll approve that change before we go further. Call (844) 797-4808 and we’ll put a real schedule on your bathroom.
Often yes, because the work touches plumbing and sometimes structure or electrical. Any change to the drain, valve, or wall framing typically requires a permit and a city inspection, and we pull those as part of the job. A straight finish-only swap that leaves the plumbing untouched may not need one. We’ll tell you which bucket your job falls into before we start, and it’s on the written estimate.
Yes, and that’s the most common and cost-effective path. If the new shower footprint matches the tub’s and the valve is in good shape, we keep the drain where it is and this stays in the $3,500 – $5,500 range for an acrylic conversion or $6,000 – $8,500 for tile. Moving the drain or valve is possible, but it adds $800 – $2,200 and usually pushes you to the high end.
Between $3,500 and $10,000 depending on finish and plumbing scope, with tile showers and curbless entries toward the high end. The biggest leap is plumbing relocation. Call (844) 797-4808 for an exact quote – estimates are free and the number we give is the number you pay.
Every tub-to-shower conversion we do is covered by our 730-Day Done Right Promise, so if a pan or a caulk line fails inside that window, we make it right. You get it in writing, not the fine print. Call us to schedule your free on-site estimate and we’ll walk you through exactly what’s covered.
Get Your Free Tub-to-Shower Conversion Estimate in Coppell
Call (844) 797-4808 for a free on-site estimate on your tub-to-shower conversion in Coppell. A live person answers, day or night, and we’ll schedule a walkthrough, measure the footprint, and hand you a written line-item quote with no surprise change orders. If the job is part of a bigger bathroom remodeling plan, we’ll map the whole scope. We cover all of Coppell and the surrounding area, so give us a call when you’re ready to price it.
Written by the team at Groundwork Construction Co.