A Groundwork company - serving Dallas, TX
Tub-to-Shower Conversion in Dallas, TX | Groundwork Construction Co. of Dallas

Tub-to-Shower Conversion in Dallas - Fixed Price, One Bathroom at a Time

Free in-home consult and a written, line-item quote before demo starts. We work one bathroom at a time so your house stays livable, and the signed price is the final price. Licensed, insured, permits handled.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Kitchen remodelingKitchen remodeling
Bathroom remodelingBathroom remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Tub-to-Shower Conversion in Dallas, TX: What It Actually Involves

A tub-to-shower conversion in Dallas typically runs $3,500 to $10,000 and takes 5 to 10 working days from demo to final walkthrough. We pull the tub, rework the drain and valve wall, waterproof and tile the new shower, and set the glass. Most Dallas jobs land in the $4,500 to $8,500 range once you account for the clay-soil plumbing quirks and the tile grade you choose. Call (844) 797-4808 for a free on-site estimate, and we’ll put a written line-item number in your hands before anything gets touched.

Call (844) 797-4808

How a Tub-to-Shower Conversion Actually Runs, Stage by Stage

Every job follows the same sequence. The timing shifts with tile choice, glass lead times, and what we find behind the wall, but the order never changes.

Stage 1 – Site review and demo (day 1). We protect the floor and hallway, shut the water, and pull the tub, surround, and valve trim. If the existing tub is cast iron, it comes out in pieces; if it’s a lighter acrylic unit, it comes out whole. You’ll see the studs and drain stub by end of day. This is also when we confirm the drain location and whether the existing valve is worth keeping.

Stage 2 – Rough-in and framing (days 1 to 2). This is where your first decision lands: keep the drain where it is or move it. If the drain sits toward the tub apron and you’re converting to a curbless or low-curb shower, we usually relocate it to center the shower pan. That’s a real cost jump because it means cutting the slab. We also set the valve body, add blocking for grab bars and glass hinges, and reframe the backer if the studs are out of plumb (common in 1950s ranch stock).

Stage 3 – Waterproofing and inspection (days 2 to 4). Cement backer board, then a bonded waterproof membrane over the whole wet area, then a flood test on the pan. We schedule the plumbing rough-in inspection here, and the flood test is a fixed 24-hour hold. No shortcuts and no same-day pour on this part.

Stage 4 – Tile and finish (days 4 to 7). This is where homeowners often reshape the budget. Large-format tile on the walls, a mosaic or penny-tile pan floor for grip, and a niche or two. We set, grout, and seal. Glass templating happens after tile is fully cured, so add 3 to 7 calendar days for tempered glass to be fabricated and installed.

Stage 5 – Trim, glass, and walkthrough (days 7 to 10). Fixture install, caulk, final inspection sign-off, and a hands-on walkthrough where we show you the dry-off routine for the pan and the caulk-maintenance schedule. Your warranty paperwork is handed over the same day.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices That Actually Shape Your New Shower

Most of the money and every one of the visual decisions live in these categories. We’ll walk you through the samples in person so you’re not guessing from a screen.

  • Shower pan style: Raised curb, low curb, or curbless. A curbless pan needs the drain relocated and the slab or subfloor stepped down, which is where the price climb starts. Curbed is the workhorse for most Dallas slabs and holds water best in a wet-dry climate.
  • Wall tile: Porcelain or ceramic is the practical default. Large-format 12×24 porcelain sets cost-efficient and reads modern; hand-glazed or marble-look tile pushes the number up but weighs nothing extra on the wall. Marble and natural stone need sealing every couple of years.
  • Pan floor tile: Small mosaics (2×2 or penny) deliver the grip you want. Large tile on a shower floor is a slip hazard and we’ll flag it.
  • Valve and trim: A Moen or Delta thermostatic valve with a pressure-balance trim is the sweet spot, especially in Dallas where summer mains temps swing. A basic rebuild kit is cheaper but you’ll be servicing it more often.
  • Glass: Framed vs. frameless. Frameless looks best and costs more; framed lasts longer with less adjustment. Both are tempered and both hinge on wall blocking that we installed at Stage 2.
  • Fixtures: A handheld on a slide bar plus a standard showerhead is the flexible setup for aging-in-place and for families. American Standard and Delta both make solid pressure-balance valves in the mid tier.

What Tub-to-Shower Conversion Costs in Dallas, TX

Most Dallas conversions land between $3,500 and $10,000, with the sweet spot around $4,500 to $8,500. Anything above that usually involves moving the drain, a curbless pan, or premium tile and frameless glass.

Line item Typical range
Demo, haul-away, and disposal $300 – $600
Plumbing rough-in and valve $500 – $1,400
Drain relocation (slab cut) $900 – $2,200
Waterproofing and pan build $500 – $1,100
Tile installation (walls and pan) $1,200 – $3,200
Glass and hardware $600 – $1,800
Trim, fixtures, permits, inspections $400 – $900

The five variables that push you toward the high end of that table:

  • Drain relocation. Keeping the existing drain in place is the single biggest cost saver on a Dallas conversion. Moving it means slab demolition and a plumbing re-test.
  • Wall and structure. If the existing tile is set on metal lath over framed walls, we remove and rebuild the backer. If the framing is out of plumb, that adds labor.
  • Tile grade. Basic porcelain vs. natural stone can swing the job $1,500 to $2,000 on the same footprint.
  • Glass configuration. Framed vs. frameless, and whether the opening needs a fixed panel plus door.
  • Permit and inspection scope. Dallas requires a permit for the plumbing and, in most cases, the electrical work if we move a light or add a fan. That’s a real cost, not a rounding error.

Every written estimate is line-item and fixed. No change orders unless you approve a scope change in writing. The 730-Day Done Right Promise covers workmanship for the full term, and the whole job is backed by our upfront pricing guarantee.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Dallas Homes Specifically Do to This Job

Dallas sits in the clay-soil Blackland Prairie, and that fact changes the plumbing under your tub more than any other single thing. On slab-on-grade homes across Oak Cliff, East Dallas, and the 1950s-70s ranch tracts in far North Dallas and Lake Highlands, we regularly find tub drains that have shifted with soil movement over decades. Sometimes the drain line is slightly off-pitch, sometimes the floor under a cast-iron tub has a dip. We can’t see it until demo. When we do, the fix is real money (see the drain relocation row above) but it’s the difference between a shower that drains right and one that pools.

Dallas permitting runs through the Development Services Department. Tub-to-shower conversions typically need a plumbing permit for the drain and valve work and an electrical permit if we add a fan or light in the shower zone. Inspections happen at rough and final, and we schedule those for you. If you’re inside a neighborhood with a homeowner association, send us the HOA design guidelines before you pick tile. Some Dallas HOAs restrict frameless glass on outward-facing privacy walls, and it’s cheaper to know that at the start than after fabrication.

And the summer heat: our typical shower builds use a quality exhaust fan sized to the ceiling height, because Dallas humid summers plus a tiled shower enclosure equals mold if the fan is undersized. We do this on every conversion.

Serving Dallas, TX – Our Local Coverage Area

We serve Dallas and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – Tub-to-Shower Conversion in Dallas

Ready for a Real Number on Your Dallas Tub-to-Shower Conversion?

Call (844) 797-4808 for a free on-site estimate in Dallas, TX. We’ll look at your current tub, check the drain and valve, flag anything the demo might reveal, and put a line-item written number in your hands – no vague “starting at” pricing and no change orders you didn’t approve. A live person answers the phone day or night, and technicians arrive background-checked and in uniform. If the conversion is part of a bigger bathroom update, see our Bathroom Remodeling in Dallas page for the full scope. We also serve the surrounding Dallas neighborhoods and nearby Highland Park and University Park, and homeowners often pair this work with Metal Roofing in Dallas when hail season rolls around. If you’re planning a wider update, check our Bathroom Remodeling service and consider Tile Roofing in Dallas for exterior durability. The number you see on our written estimate is the number you pay.

Written by the team at Groundwork Construction Co.

Why Dallas Chooses Groundwork Construction Co. of Dallas

We set the standard for tub-to-shower conversion in Dallas.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Dallas

Getting your tub-to-shower conversion project started is simple.

1

Call or Request a Free Estimate

Tell us about your tub-to-shower conversion project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local tub-to-shower conversion pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Dallas Customers Say

Trusted by homeowners across Dallas and surrounding areas.

★★★★★

"We lived in the house through the whole thing. He kept the dust wall up, cleaned every Friday, and made sure we always had a working bathroom."

Craig Whitaker
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett

Ready for Tub-to-Shower Conversion in Dallas?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Dallas.

(844) 797-4808

Request a Free Estimate in Dallas

Tell us about your tub-to-shower conversion needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Local Service Coverage
Call Now - 24/7 Dispatch