Bathroom remodeling
Kitchen remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Full Bathroom Remodeling in Irving, TX: Scope, Timeline, and Cost
Full bathroom remodeling in Irving means gutting the room to the studs and rebuilding it – new tub or shower, vanity, tile, plumbing trim, electrical, ventilation, and finishes – and it typically takes 3 to 5 weeks of working days for a hall or primary bath. Most Irving full bathroom remodels land between $9,000 and $28,000, with the number driven by size, how far plumbing and electrical move, and finish grade. Call (844) 797-4808 for a free on-site estimate with a written line-item quote.
How our full bathroom remodeling process runs, stage by stage
We don’t hand you a schedule and disappear. Here’s the actual sequence on a full bathroom remodel in Irving, what happens, and how long each stage takes.
Stage 1: Layout and selections (week 0, before demo)
We measure the room, confirm what’s staying where, and lock the layout: tub or shower footprint, vanity size, toilet position, and whether the door swings in or out. You make the big decisions here – tile, fixture finish, vanity style – because nothing on site can start until the order is placed. This is where the budget gets real, and where a written line-item quote prevents mid-job surprises. Upfront pricing, no surprises means the number you approve is the number you pay.
Stage 2: Demolition and rough-in inspection (days 1-3)
Day one is tear-out: fixtures out, tile and drywall down to studs, subfloor exposed. By day two or three we’re into the rough work – moving a drain line, adding a GFCI circuit, running the vent fan duct. Irving requires rough-in inspections before walls close, so we schedule that inspection and don’t board anything until it passes. This is the stage where a hidden rotten subfloor or a cast-iron drain that’s past its life gets found and priced.
Stage 3: Backer board, waterproofing, and tile (days 4-12)
Walls close, cement backer board goes up in the wet zone, and the shower gets a proper waterproofing membrane – not just plastic behind tile. Tile setting runs several days, then grout and cure time before fixtures go back. You’ll be asked to sign off on tile layout and grout color before the first tile is set, so there’s no argument later.
Stage 4: Fixtures, vanity, and finishes (days 13-18)
Vanity set, toilet reset, shower trim and glass installed, mirror hung, paint touched up. If you chose a Moen or Delta shower system, this is when it goes in. Most of the visible “wow” happens in this one week.
Stage 5: Punch walk and final inspection (days 19-21)
We walk the room with you line by line, fix anything on the punch list, and confirm the final inspection passed. Every full bathroom remodel we finish is covered by our 730-Day Done Right Promise – if it’s not done right, we make it right.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The options you’ll actually choose between on a full bath
A full bathroom remodel in Irving comes down to a handful of decisions. Here’s what each one costs you in money and in durability.
- Acrylic vs. tile shower. Acrylic surrounds are faster to install and cheaper up front, but tile gives you a custom size and a longer service life. Tile costs more and takes longer; acrylic suits a quick rental-grade refresh.
- Cast iron vs. acrylic tub. Cast iron holds heat and lasts decades but needs floor support and costs more. Acrylic is lighter and cheaper, and fine for a hall bath.
- Quartz vs. granite vanity top. Quartz is non-porous and needs no sealing – our pick for a busy household. Granite has more pattern variation but wants periodic sealing.
- Prize fixtures vs. builder-grade. A Moen or Delta valve and trim set costs more than a no-name import but is far easier to get parts for in ten years. Cheap cartridges are the number-one call-back we see.
- Ventilation. A properly sized, ducted exhaust fan is non-negotiable in North Texas humidity. Under-sized fans cause the mold we get called to fix.
What full bathroom remodeling costs in Irving, TX
Expect $9,000 to $28,000 for a full bathroom remodel in Irving. A small hall bath with modest finishes sits near the bottom; a primary bath with a large tiled shower, double vanity, and relocated plumbing sits near the top. Five things move the number:
- Room size and fixture count. A 5×8 hall bath costs far less than a 10×12 primary with a freestanding tub and separate shower.
- Whether plumbing moves. Keeping the toilet and drain where they are saves real money. Relocating a drain in a slab-on-grade home means cutting concrete, which adds cost and time.
- Existing condition. Rotten subfloor, old galvanized or cast-iron lines, or a failed shower pan discovered during demo adds to the job.
- Finish grade. Porcelain vs. natural stone, framed vs. frameless glass, and builder vs. premium fixtures all swing the total.
- Permit scope. Moving plumbing or electrical means a bigger permit and inspection footprint than a cosmetic refresh.
A written estimate from us spells out materials, labor, permits, and disposal. It does not cover surprise structural repairs, which we price separately with your approval before any work continues. Built to last, backed in writing.
See the difference
Before
After
Before
After
Before
AfterWhat Irving homes specifically do to a full bathroom remodel
Irving is really two construction markets sitting a few miles apart, and both shape the work. In the older core – South and central Irving around the old downtown and Hospital District, ZIPs like 75060 and 75061 – you’re mostly in 1950s to 1970s brick-veneer ranches and small tract homes. Those bathrooms were built small, often with a single cast-iron drain stack and a window where you’d now want a vent fan. On the Las Colinas and Valley Ranch side (75038, 75039), the housing stock runs 1980s to 2000s, and the baths are bigger but often need updating to current code.
The other local factor is the black-clay soil. Slabs move, and a moving slab is the top cause of cracked shower pans and tile we get called to redo. If your floor is out of level, we flag it before tile goes down. Because the same infill and teardown activity pushes permits through city review in waves, we build realistic inspection timing into the schedule rather than promising a date we can’t hit. Homeowners in Las Colinas also pair a bathroom rebuild with Roof Repair in Irving and Roof Replacement & Installation in Irving while the house is already under construction.
Serving Irving, TX – Our Local Coverage Area
We serve Irving and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked – full bathroom remodeling in Irving
A full bathroom remodel in Irving typically takes 3 to 5 weeks of working days, with inspections adding a few days if plumbing or electrical moves. Call (844) 797-4808 and we’ll give you a realistic schedule with your estimate.
Yes, if you’re moving plumbing, electrical, or structure. A permit and rough-in inspection are required for that scope in Irving. Cosmetic-only work like tile and paint usually doesn’t need one. We pull the permits and handle the inspections, and we’ll tell you exactly what your job requires.
Yes, and it saves real money. Keeping the tub, toilet, and drain positions where they are avoids slab cutting and keeps the permit small. Call (844) 797-4808 to talk through whether a layout change is worth it for your room.
Full bathroom remodeling in Irving runs $9,000 to $28,000, depending on size, plumbing changes, and finish grade. Call (844) 797-4808 for an exact quote – estimates are free.
Every full bathroom remodel is covered by our 730-Day Done Right Promise. If something isn’t done right, we make it right – the number you see on the estimate is the number you pay.
Get your free full bathroom remodeling estimate in Irving
Ready to price a full bathroom remodel in Irving? Call (844) 797-4808 and we’ll schedule a free on-site estimate – we measure the room, talk through layout and materials, and hand you a written line-item quote. Calls are answered by a live person, and our technicians are background-checked and arrive in uniform. If your job grows to include the whole house, our Bathroom Remodeling service and the broader Bathroom Remodeling in Irving pages cover the scope.
Written by the team at Groundwork Construction Co.