Tub-to-Shower Conversion in Irving: What It Costs and How Long It Takes
Most tub-to-shower conversions in Irving run $3,500 to $10,000 and take 5 to 10 working days from demo to final walkthrough. The work replaces a tub (or tub-and-surround combo) with a waterproofed shower base, tile or panel walls, a new valve behind the wall, and a glass or curtain opening. Simple swaps in a South Irving ranch can land near the bottom of that range; anything that moves plumbing or takes out a wall pushes toward the top. Call (844) 797-4808 for a free on-site estimate and a written line-item quote.
How the job actually runs, stage by stage
This is not a weekend project, and it shouldn’t be sold as one. Here’s the real sequence we follow on a conversion in Irving, with what you’ll be deciding at each stage.
Stage 1: Assessment and layout (day 1)
We open the wall at the valve, check the drain and P-trap, and confirm what’s behind the tub apron. This is where we learn whether the existing plumbing is copper, galvanized, or PEX, whether the drain is centered or offset, and whether the framing behind the tub wall is sound. You’ll confirm the shower footprint (30×60 is standard, 36×60 or larger if space allows) and the door configuration. Most jobs get one round of layout revision here before anything gets ordered.
Stage 2: Demo and rough-in (days 2 – 3)
The tub comes out first, then the surround, then the old valve and drain if they’re being replaced. We inspect the framing, replace any water-damaged studs, and set the new valve and drain. If you’re moving the valve, adding a seat, or taking out a half-wall, that framing work happens here. This is the stage where a permit inspection typically happens, so the timing depends on how fast the city’s plumbing inspector gets out.
Stage 3: Waterproofing (day 4)
This is the step that separates a shower that lasts 20 years from one that leaks in five. We install a cement backer board and a bonded waterproofing membrane (we use a liquid-applied or sheet system depending on the substrate), and we pre-slope the pan if the shower is being built on-site rather than from a factory pan. Flashing at the curb, the niche, and the valve opening all get done in this stage. There’s no decision here, but this is the day to walk in and look – it’s the most important day on the job.
Stage 4: Tile and finish (days 5 – 8)
Wall tile, floor tile, grout, then the shower trim kit (valve handle, showerhead, drain cover). You’ll pick the tile, the grout color, and the trim finish before this stage. Larger tile and mosaics take longer to set; a straightforward 3×12 subway goes fast, a herringbone or a niche with inlays adds a day or two.
Stage 5: Glass, caulk, and punch (days 9 – 10)
Glass goes in after grout cures, typically 2 – 3 days after the last tile. We caulk the perimeter, run a water test, and do a walkthrough punch list with you. Final inspection (if permitted) closes out the job.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The choices you’ll make before we start
Most of the price and most of the finished look comes from these five decisions. Here’s the honest trade-off on each.
- Shower base: pre-fab vs. built-on-site. A molded fiberglass or acrylic base (American Standard, Moen and similar) runs $300 – $900 installed and is fast, but it limits you to standard footprints. A tile-over-membrane pan or a linear-drain pan runs $1,200 – $3,000 but lets you build to the room’s exact dimensions and read cleaner underfoot. Tile pans are the better long-term choice on a masonry-built home because they’re serviceable and match the wall material.
- Wall finish: tile vs. panel. Full tile runs $15 – $40/sq ft installed depending on material; waterproof panels run $8 – $20/sq ft and install faster. Tile looks better and lasts longer. Panels make sense when budget is tight or you’re flipping.
- Tub-to-shower with a curb vs. curbless. A standard curb is the norm and the cheapest. Curbless requires a recessed floor or a ramped pan, adds $800 – $2,000, and is the right call if there’s any accessibility need or a family member who’ll age in place.
- Glass: framed vs. frameless. A framed slider or pivot runs $400 – $900. Frameless tempered glass runs $1,200 – $2,500 and looks dramatically better but needs the wall framing to be dead-plumb, so it’s easier on a job that’s already opened up.
- Valve and trim. A Moen or Delta pressure-balanced valve and trim kit runs $250 – $600 installed. If the existing valve is more than 20 years old, replace it while the wall is open. It’s the single cheapest insurance against opening the wall again in five years.
What Tub-to-Shower Conversion costs in Irving, TX
Most conversions land between $3,500 and $10,000, with the middle of the range at $5,500 – $7,000 for a standard 30×60 with tile walls, a pre-fab pan, and a framed glass door. Below is where the money goes and what pushes a job toward either end.
- Low end ($3,500 – $5,000): Same footprint as the old tub, existing valve sound, acrylic pan and panels, framed door, no permit required beyond minor work. Common in the older postwar ranches around South Irving where the layout is simple and the plumbing is accessible.
- Mid range ($5,000 – $7,500): Tile walls, tile pan or a better pre-fab base, new Moen or Delta valve, frameless or semi-frameless door, minor framing repair.
- High end ($7,500 – $10,000+): Layout change (moving the drain, removing a half wall), custom niche, linear drain, curbless install, or a shower that has to correct old water damage behind the tub surround. Those are also the jobs where a wider scope starts bleeding in – if the conversion is part of a full Bathroom Remodeling in Irving, the numbers shift.
Four things move the number more than anything else: whether the drain has to move (a $600 – $1,500 line item once you cut slab), whether the valve moves (a $400 – $900 line item), existing water damage behind the surround (we’ve opened walls on 1960s Irving tubs and found rotted studs more than we’d like, adding $500 – $2,000), and material grade. A written estimate should itemize demo, rough plumbing, waterproofing, tile, glass, fixtures, permit fees, and disposal. What it typically does not include: a city permit if you decline to pull one, structural repairs beyond the shower wall, and anything outside the shower alcove itself.
See the difference
Before
After
Before
After
Before
AfterWhat Irving’s housing stock does to this job
Irving’s mid-century core, the older brick-veneer ranches around the old downtown and the Hospital District, was built in the 1950s through the 1970s when tubs were cast iron and surrounds were greenboard. That’s the material we’re most often replacing. When we open one of these walls, we find two things: cast-iron drains that are still serviceable but corroded at the joints, and galvanized supply lines that should be replaced while they’re exposed. Both are common in 75060 and 75061 and both are worth budget for. Plumbing on these homes is often routed through the slab, so when a drain has to move, that’s a small concrete cut and patch – which is why the drain location drives price more here than it does in a newer subdivision. Permitting runs through the City of Irving, and if the job involves moving the drain or adding a vent, it’s a plumbing permit with an inspection. Cosmetic swaps that stay on the existing rough-in sometimes don’t need one, but we pull the permit when it’s required because we’re not going to hand you a finished shower that a future buyer’s inspector flags. On the Las Colinas, Valley Ranch and 75063 side of town, we see 1990s tub surrounds where the original fiberglass is starting to craze or the caulk has failed behind the apron, and the fix is usually the same conversion with fresher framing.
Serving Irving, TX – Our Local Coverage Area
We serve Irving and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked – Tub-to-Shower Conversion in Irving
Plan on 5 to 10 working days, with the calendar stretching to 3 to 4 weeks once you account for permit review at the City of Irving and the wait on tile or glass. The build itself is short; the front-end ordering is what most homeowners underestimate. Call (844) 797-4808 and we’ll give you a realistic start date against the current schedule.
Often yes – any time the drain or the vent moves, or a new valve is set, the City of Irving wants a plumbing permit and an inspection. Straight replacements that reuse the existing rough-in may not trigger one. We pull the permit when it’s required and walk the inspection. Call (844) 797-4808 and we’ll tell you which side of the line your job is on.
Yes, and it’s the cheapest and most common way to do it. A 30×60 pre-fab pan or a standard tile pan drops right onto the existing drain location in most cases, and the valve stays where it is. That’s how a lot of conversions in the older South Irving ranches come in under $5,000. If the layout is awkward or you want a bigger footprint, moving the drain can be worth it – call (844) 797-4808 and we’ll look at both options on site.
Most Irving conversions land between $3,500 and $10,000, depending on whether the drain moves, whether the valve is being replaced, whether water damage has to be repaired, and what tile and glass you choose. A mid-range job with tile walls and a framed door typically runs $5,500 – $7,000. Call (844) 797-4808 for a free on-site estimate with a written line-item quote.
Every conversion we do is covered by our 730-Day Done Right Promise: if something we installed isn’t right, we come back and fix it. That covers the workmanship – the waterproofing, tile setting, plumbing rough-in, and glass install – for two full years. Call (844) 797-4808 and we’ll walk you through exactly what the promise covers before you sign anything.
Get a free on-site estimate for your Irving conversion
Every tub-to-shower conversion starts with a free on-site estimate. We come out, look behind the tub, measure the alcove, and hand you a written line-item quote with a fixed price. What we tell you at the table is what you pay at the end – no change orders on scope we already priced. We cover Irving and nearby Farmers Branch, Coppell, Euless, and University Park. Some homeowners pair a conversion with Metal Roofing in Irving or Tile Roofing in Irving when they’re upgrading the whole house at once, and if a wider scope makes sense, our Bathroom Remodeling service can carry it. Call (844) 797-4808 and a live person will answer – day or night.
Written by the team at Groundwork Construction Co.