A Groundwork company - serving Dallas, TX
New Detached ADU in Irving, TX | Groundwork Construction Co. of Dallas

New Detached ADU in Irving - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Kitchen remodelingKitchen remodeling
Bathroom remodelingBathroom remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

New Detached ADU in Irving, TX: What You’re Actually Building

A new detached ADU in Irving typically runs $45,000 – $130,000 and takes four to seven months from permit submittal to final inspection. The structure sits on its own footprint, carries its own utilities, and needs its own address or unit designation before anyone can legally live in it. Call (844) 797-4808 and we’ll walk your lot and give you a real number.

Call (844) 797-4808

How a New Detached ADU Comes Together, Stage by Stage

The sequence matters more than any single material choice, because Irving’s inspection calendar and clay soils both punish jobs that skip steps. Here’s what actually happens.

  • Stage 1 – Site and soils (week 1 – 2): We walk the lot, check setbacks against what the city will allow, and pull a geotechnical read on the black clay. On South Irving lots in 75060 and 75061 this is where we find out whether the existing grade supports a post-tension slab or whether we’re drilling piers. You decide the footprint and orientation here; everything downstream depends on it.
  • Stage 2 – Design and permit submittal (week 3 – 8): Plans go to the city with structural, plumbing, electrical and mechanical sheets. Irving’s plan review is the long pole. You sign off on the layout and exterior finish selections while this runs.
  • Stage 3 – Foundation and framing (week 9 – 16): Forming, rebar or cable, pour, cure, then framing. Summer pours here get scheduled at dawn because afternoon heat will crack a slab. You’ll walk the framed shell with us before anything gets closed up.
  • Stage 4 – Rough-ins and inspections (week 17 – 22): Electrical, plumbing and HVAC rough-in, then framing, mechanical and insulation inspections in sequence. Each one has to pass before the next trade starts.
  • Stage 5 – Finishes and final (week 23 – 30): Drywall, cabinets, flooring, fixtures, exterior siding and paint, then the final inspection and utility connections. You get the walkthrough and the punch list closes in writing.

Decisions stack up front on purpose. Layout, exterior cladding and roof pitch get locked in Stage 2. Interior finishes get locked by Stage 3. Moving a wall after framing is open is cheap; moving it after drywall is not.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices That Shape the Build

Most of the money sits in five decisions, and each one has a real trade-off.

  • Foundation type: Post-tension slab is the default for a detached ADU on stable grade. Drilled piers add cost but are often mandatory on the older South Irving lots where the original house sits on shallow footings. Skimp here and you’ll pay for it in drywall cracks within three summers.
  • Structure: Stick-framed wood is standard and flexible. Structural insulated panels go up faster and insulate better but cost more per square foot up front.
  • Exterior cladding: Brick veneer matches the Irving street fabric and holds up for decades. Fiber cement siding is lighter on the budget and repaints cleanly. Both work; brick costs more and asks less of you later.
  • Windows: This is where a low number and a high number diverge fast. A builder-grade unit meets code. Something from Andersen or an ES Windows line rated for North Texas heat gain will cost more and keep the interior cooler through August. We quote the actual product, not a category.
  • Utilities: Trenching from the main house to a detached structure is a line item nobody expects. Distance from the meter drives it.

What a New Detached ADU Costs in Irving, TX

Budget $45,000 – $130,000 for the structure and its site work, with most Irving builds landing in the middle of that band once utilities, foundation and finishes are counted.

Line Item Typical Range
Site prep, grading, trenching $4,000 – $12,000
Foundation (slab or piers) $8,000 – $22,000
Shell, framing, roof, cladding $18,000 – $55,000
Electrical, plumbing, HVAC $7,000 – $18,000
Interior finishes $8,000 – $23,000

What pushes a job to the bottom of the range: a flat, cleared lot close to the main meter, slab foundation, fiber cement exterior, modest fixtures. What pushes it up: piers, a long utility run, brick veneer, a full kitchen and bath package, and any impact-rated window spec.

A written estimate from us lists each trade line separately. What it won’t hide is the permit fee, which the city sets and we pass through at cost. What it excludes is landscaping restoration and any HOA design review fee. No change orders unless you ask for a change.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Irving Specifically Does to a Detached ADU Build

Irving splits into two construction markets along the SH-114 corridor, and a detached ADU lands differently on each side. On the older South and central lots in 75060 and 75061, you’re working postwar brick ranches on shallow footings, and the clay beneath them swells and shrinks with every wet-dry cycle. That’s why pier-and-beam or re-engineered post-tension work is a standard line item here before framing starts. Contractors from other metros miss it and get surprised at inspection.

Out toward Las Colinas and the 75038 and 75039 edge, the lots are tighter, the HOA rules are stricter, and the surrounding construction is commercial-grade. Setback and height review gets a harder look. Either way, plan review takes weeks, not days, and we schedule around the city’s inspection windows rather than promising a date we can’t hold.

Serving Irving, TX – Our Local Coverage Area

We serve Irving and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked: New Detached ADU in Irving

Get a Real Number on Your Irving ADU

Call (844) 797-4808 for a free on-site estimate on a new detached ADU in Irving. A live person answers, day or night. We’ll walk the lot, check setbacks, talk through foundation options and hand you a written line-item estimate: upfront pricing, no surprises. Projects over $10,000 get $1,000 off, and 0% financing for 18 months is available.

Written by the team at Groundwork Construction Co.

Why Irving Chooses Groundwork Construction Co. of Dallas

We set the standard for new detached ADU in Irving.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Irving

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Irving Customers Say

Trusted by homeowners across Irving and surrounding areas.

★★★★★

"We lived in the house through the whole thing. He kept the dust wall up, cleaned every Friday, and made sure we always had a working bathroom."

Craig Whitaker
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett

Ready for New Detached ADU in Irving?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Irving.

(844) 797-4808

Request a Free Estimate in Irving

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Local Service Coverage
Call Now - 24/7 Dispatch