Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Vanities, Tile & Fixtures in Dallas, TX: What the Job Actually Involves
Vanities, tile & fixtures in Dallas is a surface-and-fixture package, not a full gut: we pull the old vanity, tile the floor and shower walls, and set new faucets, drains, and lighting trim, usually in three to six working days, with the bathroom usable again each evening except for the tile-setting days. Realistic pricing runs $9,000 – $28,000 depending on square footage, tile grade, and whether drain or supply lines move. Call (844) 797-4808 and we’ll walk your bathroom and put a line-item number in your hand.
How we run the job, stage by stage
Bathrooms run on sequence. Try to tile before the vanity is set, or grout before the shower pan is cured, and you’ll pay for it twice. Here’s the order we work in, and where you get pulled in for a decision.
Day 1 – demo and inspection. We pull the vanity, disconnect supply and drain, strip the existing tile, and open the floor to see what’s under it. In a lot of Dallas slab homes that’s where surprises live, and we stop and show you before anything gets covered back up. You sign off on the rough-in inspection scope before we go further.
Day 2 – rough-in and waterproofing. New drain for a relocated vanity, shutoff valves, and the shower valve body go in. Then the waterproofing membrane gets applied and has to cure, which is a real delay, not a formality. You’ll confirm the valve brand and rough-in depth at this point.
Day 3 – tile setting. Floor tile sets first, then walls, then shower pan. Large-format tile goes slower than 12×12; penny round and mosaic go slower still. This is the day to finalize grout color and trim if you haven’t.
Day 4 – set the vanity and fixtures. Cabinet anchors to studs, the top gets set, the faucet, drain, and any wall sconces go in. If you’re using a Delta or Moen valve, this is the day it gets trimmed out.
Day 5 and 6 – finish and final walkthrough. Caulk, grout haze cleanup, mirror and accessories, then a full operational check of every drain, valve, and light. We walk it with you and fix anything before we leave.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The options you’ll choose between
A short spec conversation saves a lot of arguing later. Here’s what actually matters on this job:
- Vanity base – freestanding vs. built-in. A stock freestanding base (KraftMaid and similar lines) ships fast and costs less; a custom built-in fits a wall exactly but adds three to five weeks and labor. For a 48″ to 60″ space, freestanding usually wins.
- Vanity top – quartz vs. cultured marble vs. natural stone. Quartz holds up to moisture and hard water with almost no care. Cultured marble is the value pick but scratches more easily. Natural stone looks best and needs sealing.
- Floor tile – porcelain vs. ceramic vs. mosaic. Porcelain is denser and handles the wet zone better; ceramic costs less; mosaic is the choice for curbs and shower pans.
- Fixtures – Moen and Delta vs. builder-grade. Name-brand valve bodies are worth the upcharge because the cartridge is replaceable and parts are available locally. Builder-grade looks the same on day one and doesn’t on year five.
- Shower walls – large-format tile vs. smaller mosaic vs. a shroud. Large-format has fewer grout lines and less to scrub; a shroud is fastest and cheapest and looks like it.
- Drains and trim – standard vs. linear drain. A linear drain lets the shower floor stay level, but adds cost and requires the rough-in to be planned early.
What Vanities, Tile & Fixtures costs in Dallas, TX
Typical Dallas pricing for this package runs $9,000 – $28,000, and a smaller bath that keeps plumbing in place lands closer to the bottom of that range. Here’s where the money actually goes:
| Line item | Typical range |
|---|---|
| Vanity and top (stock base, quartz) | $800 – $3,000 |
| Floor tile, material and setting | $1,200 – $3,500 |
| Shower walls and pan | $2,000 – $6,000 |
| Faucets, valves, drains, trim | $600 – $2,000 |
| Labor, waterproofing, permits | $4,000 – $13,000 |
Four things move that number: bathroom size, the condition of the subfloor and framing underneath (slab-on-grade homes can hide moisture damage), whether drain or supply lines move, and tile grade. A written estimate from us lists every fixture by model, the tile by name, and the labor separately. What it won’t hide: disposal, haul-off, and permit fees. Those are on the page, not in a phone call the morning of.
Every project is covered by our 730-Day Done Right Promise, and pricing is upfront – the number you see is the number you pay, barring a hidden condition we stop and show you first.
See the difference
Before
After
Before
After
Before
AfterWhat Dallas homes specifically do to this job
Dallas sits on Blackland Prairie clay, and that changes how we approach a bathroom. Expansive vertisols swell and shrink with the wet-dry cycle, so a lot of the pre-war pier-and-beam bungalows in Oak Cliff and East Dallas have settled floors we have to level before a single tile is set. On the 1950s-70s slab-on-grade ranch homes throughout the city, we’re often looking at cracked tile and shifting vanities that trace back to slab movement, not to bad tile. That’s why we check before we cover. It’s also why Dallas crews talk about drilled piers and root barriers the way other markets talk about frost depth. When a bathroom renovation ties into a larger structural fix, that work is engineered and permitted in Dallas under plans an engineer signs off on – routine here in a way it isn’t in the Hill Country to the south. And the summer heat matters on finish: attic runs for vent fans and rough-in for a new supply valve get planned before the walls close, because re-opening a finished bathroom in July is nobody’s idea of a good time.
Serving Dallas, TX – Our Local Coverage Area
We serve Dallas and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked – Vanities, Tile & Fixtures in Dallas
Most vanities, tile & fixtures jobs take three to six working days from demo to final walkthrough, with the longer end for homes where the shower pan is rebuilt and the waterproofing needs a full cure. Call (844) 797-4808 and we’ll give you a schedule once we’ve seen the bathroom.
Cosmetic work – new tile, new vanity top, swapped fixtures on existing rough-in – usually doesn’t require a permit; moving a drain or adding a supply line does, and we pull it and coordinate the inspection for you. Call (844) 797-4808 and we’ll tell you for your specific bathroom.
Yes, and that’s the most common path – keeping the drain, supply, and vanity location in place avoids the rough-in cost, the waterproofing delay, and the inspection, and it lands you closer to the low end of the $9,000 – $28,000 range. Call (844) 797-4808 for an exact quote – estimates are free.
A typical Dallas package runs $9,000 – $28,000, with a 48″ vanity swap, floor tile, and fixture upgrades landing toward the low end and a full shower wall rebuild with a linear drain and name-brand valve at the top. Call (844) 797-4808 for a written line-item estimate.
Every project is backed by our 730-Day Done Right Promise – if it’s not done right, we make it right. Call (844) 797-4808 to schedule a free estimate and a design consult for your Dallas bathroom.
Ready for a straight number?
Call (844) 797-4808 for a free on-site estimate on vanities, tile & fixtures in Dallas. We’ll look at your bathroom, measure it, check what’s under the floor, and hand you a line-item written estimate before you commit to anything. No pressure, no bait pricing, no change orders later. Financing is available at 0% for 18 months, and projects over $10,000 get $1,000 off. If the scope is bigger than tile and fixtures, our Bathroom Remodeling in Dallas page covers the whole project, and our Bathroom Remodeling hub explains how we run larger remodels from start to finish.
Written by the team at Groundwork Construction Co. of Dallas.