Walk-In Showers & Shower Remodeling in Irving, TX: What to Expect
Walk-In Showers & Shower Remodeling in Irving typically runs $9,000 – $28,000 for a full project, with a straight walk-in installation landing at $4,500 – $12,000 and a tub-to-shower conversion at $3,500 – $10,000. Most jobs take one to three weeks once demolition starts, though a plumbing relocation or a surprise behind the old tile can stretch that. Call (844) 797-4808 and we’ll walk your shower, measure the pan, and put a real number in writing before anyone swings a hammer.
From first cut to final seal: how the job actually runs
Every walk-in shower we build follows the same five-stage arc. Timelines below are realistic for a standard Irving install, not a best-case scenario.
Stage 1 – Walkthrough and layout (day 0). We measure the alcove, check the drain location and slope, and confirm whether the existing valve and supply lines can stay. This is where you decide the pan size (60-inch is standard, 48-inch fits a tighter footprint) and the door style. If the shower sits over a slab – which most South Irving ranches do – we check that the drain can be broken out without cutting a beam.
Stage 2 – Demo and rough-in inspection (days 1 – 2). Old tile, backer, and the shower pan come out. The rough plumbing gets exposed, the drain gets re-set, and the valve body goes in at 48 inches on center unless you’ve asked for a different height. We pull the plumbing permit before this stage and the city inspector signs off on the rough-in before any waterproofing goes up. That inspection is not optional, and skipping it is how homeowners end up with a failed final.
Stage 3 – Waterproofing and backer (days 3 – 4). Cement board, then a bonded waterproof membrane, then a flood test on the pan. We let it cure overnight. This is the part nobody sees and the part that determines whether the shower is dry in ten years. You decide here whether you want a built-in bench (adds roughly 8 inches of depth and about $400 – $900) or a niche for shampoo.
Stage 4 – Tile and glass (days 5 – 9). Wall tile goes up, grout cures, then the glass panel or frameless door gets templated and installed. Glass is usually a 5 – 7 business-day lead time from template to install, so if you’re picking a custom enclosure, the schedule is gated on that delivery, not on our crew.
Stage 5 – Final inspection and walkthrough (days 10 – 14). Fixtures, trim, and the drain grate go in. The city does the final inspection, then we walk it with you and document condition on file. Your workmanship is covered by our 730-Day Done Right Promise from that date.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The choices that actually change the outcome
Most of the money and most of the regret sit in four decisions. Here’s the honest version of each.
- Tile vs. acrylic or solid-surface surround. Tile is the premium look and the most flexible for a custom size, but it requires correct waterproofing or it fails – budget $2,500 – $5,000 in materials alone for a full tile job. Acrylic pans and walls run far less and go in faster, but they show scratches and their lifespan is roughly 15 – 20 years versus 30+ for well-installed porcelain.
- Frameless glass vs. framed door vs. no door. A frameless enclosure looks best and needs precise templating (custom, $1,200 – $3,000 installed). A framed sliding door costs much less and tolerates a slightly out-of-square opening. A curbless, doorless walk-in works only if the floor can be sloped correctly – usually a slab cut and re-pour, which is a real line item.
- Fixture grade. A Delta or Moen valve and trim package is the reliable middle; American Standard sits at the value end. This is a $200 – $800 spread on trim and it’s worth spending on the valve body, not the handle.
- Bench, niche, and storage. Each add is small on its own. Together they can push a $9,000 job toward the middle of the range. Decide before waterproofing – adding them later means starting the pan over.
What Walk-In Showers & Shower Remodeling costs in Irving, TX
The number for a full walk-in shower remodel in Irving is $9,000 – $28,000. Where you land depends on five variables:
| Scope | Typical range |
|---|---|
| Walk-in shower installation (standard alcove) | $4,500 – $12,000 |
| Tub-to-shower conversion | $3,500 – $10,000 |
| Shower replacement (same footprint) | $3,000 – $8,500 |
| Full shower remodel with tile and glass | $9,000 – $28,000 |
Size and configuration. A 48-inch shower is cheaper than a 60-inch; a curbless doorless design adds slab work and glass cost.
Existing condition. Water damage, a failed pan, or mold behind the old tile all add demo, framing, and remediation time.
Relocating plumbing or electrical. Moving the drain, valve, or adding a niche light means a slab cut and a permit amendment – usually $1,500 – $4,000.
Material grade. Porcelain vs. natural stone, custom vs. standard glass, and fixture tier all move the number.
Permit scope. A plumbing permit plus two inspections is a fixed cost, but a structural change (moving a wall) adds engineering and a longer review.
A written, line-item estimate includes demo, rough plumbing, waterproofing, tile, fixtures, glass, permits, and cleanup. It typically does not include mold remediation if we find it, structural repairs, or upgraded fixtures you select after signing. We put the number in writing and it doesn’t change unless the scope does – that’s the Upfront pricing, no surprises commitment. Call (844) 797-4808 for an exact quote; the estimate is free.
See the difference
Before
After
Before
After
Before
AfterWhat Irving homes specifically do to this job
Irving is essentially two construction markets stitched together along the SH-114 corridor, and that split lands directly on shower work. In the mid-century core around old downtown, the Hospital District, and South Irving (75060, 75061, 75062), we’re working on 1950s – 1970s brick-veneer ranches where the original shower pan has been tiled over once or twice, and the cast-iron drain is often at the end of its service life. Those homes sit on North Texas black clay, and the wet-dry cycle shows up as slightly out-of-level pan floors – which matters because a walk-in needs a correct slope to drain.
On the Las Colinas, Valley Ranch, and 75063 edge, the housing stock is 1980s – 2000s subdivision product, and the shower failures we see are different: original builder-grade surrounds that have cracked at the corners and let water into the backer. Permitting pace differs too. Commercial construction tied to the airport and Convention Center keeps the city’s inspection queue busy, so final inspections can run a few business days long – we build that into the schedule instead of promising a date we can’t hold.
We handle this work across Irving at both ends of that split, and a shower that’s part of a full Bathroom Remodeling in Irving runs on the same permit and timeline.
Serving Irving, TX – Our Local Coverage Area
We serve Irving and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked – Walk-In Showers & Shower Remodeling in Irving
Most walk-in shower remodels take two to three weeks from demo to final inspection. The inspection queue and glass lead time are the two biggest variables. Call (844) 797-4808 for a schedule tied to your actual scope.
Yes – any job that touches the drain, valve, or supply lines needs a plumbing permit, and the rough-in and final both get inspected. We pull the permits and pass the inspections. Call us and we’ll explain what your specific project requires.
In most cases, yes. If the existing drain and valve are already in a workable spot, we keep them and avoid slab work, which keeps the job toward the low end of the range. Repositioning the drain or enlarging the footprint means cutting the slab and adding cost.
A full walk-in shower remodel in Irving runs $9,000 – $28,000; a straight installation is $4,500 – $12,000. The variables that move it are size, existing condition, plumbing relocation, material grade, and permit scope. Call (844) 797-4808 for an exact quote – the estimate is free.
Every walk-in shower we build is covered by our 730-Day Done Right Promise – if it’s not done right, we make it right. We also register the manufacturer warranty on the valve and fixtures. Call for the written terms.
Get a free on-site estimate for your Irving shower
We’ll measure the shower, check the drain and slope, and give you a written, line-item number – no change orders later. A live person answers around the clock, and our technicians are background-checked and arrive in uniform. Call (844) 797-4808 to schedule your free estimate for Walk-In Showers & Shower Remodeling in Irving.
Written by the team at Groundwork Construction Co.